Objective
relate to welding
Experience
from the latest to first)
From Sep 2005 to present
Company: Sazeh Consultants # MPC # NIPC (Asalooye - South pars - Iran)
Project : Offsite of petrochemical companies/utility/water sweeter/intake /waste water/export top deck harbor
Position : MC inspector
Responsibility in full detail:
? Approve of welding procedure for Fine grain, Alloy steel (heat /creep resistance), low temp material, …
? Approve of PQR plan and WPS
? Witness of NDE and control of completely percentage
? Witness of Welder Qualification Test
? Witness of fit up and welding report
? Control of welding repair percent
? Certify of valve test
? Trace of non conformance subject
? Supervision for all modifications after plant’s start up for Piping, Welding
? P & ID conformity check and walk down and hydro-test inspection
? Punch clear, hydro-test, leak test and box up of piping package
? Approve of construction invoice
From Feb 2005 to Sep 2005
Company: Steam # TIJD jv # Petropars # POGC (Asalooye - South pars - Iran) Project: South pars gas refinery (ph 6, 7 & 8)
Position: Shop QC Manager
Responsibility in full detail:
? Verification of project specification and procedure
? Planning of Welder Qualification Test
? Coordinate and supervision of Piping and welding inspector
? Control of welder performance and close monitoring
? Inspection of PWHT and HT
? Control of spool release
? Technical query and Proposal as built
? Prepare of test package
? Package punch clear and hydro-test
? Perform of coordination meeting
From June 2004 to Feb 2005
Company: SGS # JPC # NIPC (Asalooye - South pars - Iran)
Project: 10TH Olefin
Position: Owner’s Inspector.
Responsibility in full detail:
? Piping Material inspection (analyze, test & tracing)
? Piping fit up/ welds inspection
? Approve WPS and supervision of PQR
? WQT (Welder qualification test)
? Control of welding repair percent
? Inspection of construction and test of Aluminum Silo
From May 2003 to January 2004
Company: IECC/BSE JV # Hyundai # Agip/Eni BV # POGC (Asalooye - South pars - Iran)
Project: South pars gas refinery (ph 4&5)
Position: Deputy Manager
Responsibility in full detail:
? Welder qualification test
? Coordinate and supervision of piping inspectors
? Control of welder performance and close monitoring
? None conformance piping and prepared as built
? Piping Documental control
? Preparation of hydro test package, Walk down and punch clear of piping test package
? Piping test package Delivery
? Hydro test and drying inspection of piping
? Supervision of NDT section
From September 2002 to May 2003
Company: RZI # JKT JV # BPC (Asalooye - South pars - Iran)
Project: 4TH Aromatic
Position: QC Manager (Executive)
Responsibility in full detail:
? Welder qualification test
? Piping fit up/ welding inspection and delivery
? Piping Documental control
? Estimate of used electrode
? Tracing of NCR, FTR, TQ of piping
? Progress control
? Control of NDT
From April 2001 to September 2002
Company: Lak Gas # PIDCO # Petropars # POGC (Asalooye - South pars - Iran) Project: South pars gas refinery (ph 1)
Position: QC Manager
Responsibility in full detail:
?Welder qualification test
?Piping fit up/welding inspection and delivery
?Provide procedure for storage tank
?Tank Mechanical/welding inspection and delivery
?Tank tests (vacuum, oil, leak, air, hydro test)
?Piping Documental control
?RT, PT, UT joint delivery and repair in defect weld & PMI
?Inspection of PWHT and HT
?Tracing of special piping material
?Test Package prepare, Punch clear, Hydro test & Blow Down delivery
From December 2000 to April 2001
Company : Oxin sanat # FPC # NIPC (PETZONE - Mahshahr - Iran)
Project : Fajr Petrochemical Co.
Position : QC inspector
Responsibility in full detail :
?Structure dimension/ welding inspection and delivery
?Take off material from drawing
?Piping fit up/ Welding inspection and delivery
?Control of welding sequence and quality on storage tank
From February 1996 to November 2000
Company: Taban San`at Co. (Gas station - Ghach Saran - Iran)
Project: Maintenance plan
Position: Inspector
Responsibility in full detail:
?Provide the repair procedure
?Control of change and refit of disrepair material
?Mechanical & weld inspection and next required operation (PWHT, Test)
?(Piping/Support/steel structure/Tank/Equipment)
?delivery to client
Education
1st Diploma : Industrial Engineering, (Branch: Industrial technology) University / Date: Azad (Ghach`saran district) - Iran / 2000
2nd Diploma: International Welding Engineer
Certify by / Date: SLV Duisburg, GSI mbH – Germany – DSV - IIW / 2007
Certification
RTI course (according the ASNT, level II. Certify by TWI, Training & Examination Services Dep.)
International Welding Engineer course (acc. EN Certify by SLV Duisburg, branch of GSI mbH, DSV, IIW)
Skils
Technical:
??Inspection of Welding
??Inspection of Piping, Support, Tank
??Interpretation of industrial radiography (X & Gamma Ray)
computer:
??Microsoft office Excel, Word, Access
??Basic programming
familiar with Code & standards as:
BPV Code (ASME/ANSI)
Pressure piping (B31)
AWS
API
EN