Objective
To secure a promising position that offers both a challenge and agood opportunity.
Experience
Manager Technical Karachi shipyard, Ship repair division.
1992-1994
Management of a staff of 100-150 employees at the shop floor level, for delivery of vessel.
Provide cost estimate for repair work and negotiate pricing with the owners.
Managing and monitoring daily repair work and inspection of vessel by classification societies.
Scope of work involved, extensive hull and machinery repairs and arranging sea trials. Double bottam tanks,fuel oil tanks, removal of tail end shaft, anchors and rudders, machinery repair of main engines, auxiliaries pressure vessels and boilers of all types while maintaining strict employee health and safety (EHS) standards.
Chief Engineer United Arab/Pan-Islamic steamship co.
1986-1992 Complete engineering and maintenance responsibility for passenger cargo sea vessels.
Schedule for extensive annual dry-dock, hull and machinery repair at the docks.
Maintaining cargo gears safety certification.
Spare parts planning and procurement.
Technical advice and inspection for purchase of new vessels
Second Engineer PNSC/Pan-Islamic steamship cp.
1976-1986 Maintenance and inspection of machinery per schedule and codes of classification societies for passenger and cargo vessels.
Management of staff of eight engineers and two technicians for smooth and efficient operation of vessel.
Education
Higher Secondary school certificate (HSC) DJ science college, Pakistan (1968).
Certification
Education First class engineer Department of trade industry, Pakistan (1979).
Advanced fire fighting course Annexure 1 ans 2
Survival at sea
Skils
Microsoft word
Microsoft excel
Power Generation Ltd
1994-2007 Management of the operation and maintenance of furnace oil and gas fired 30MW power plant and 11KV overhead transmission lines to a major textile and weaving mills in Pakistan.
Responsible for a staff of sixty employees, procurement and planning of spares parts, budget, capital expenditures and cost of unit generated.
Maintain and achieve optimum level of efficiency for power generation.
Liaison with government agencies for inspection of the power plant and overhead lines.
Project management for construction of the 30MW power plant. Managed the civil works and construction contractors, erection of furnace oils and gas engines on foundations, auxiliaries, raw water pumps, pipelines, cooling towers, boilers, furnace and diesel oil storage tanks. Completed the commissioning of the power plant in stipulated time and budget.