Back to Resumes List

Superintendent Electronics,2nd Electrician. I&C or equivalent

Objective


To Obtain onboard challenging career advanced.


Experience


Work Experience



WESTERN MINDANAO POWER CORPORATION

100 MWe Diesel power plant Base load] Alcantara group of Company

[ I&C Instrumentation and control technician]

[October 16,1997 up to present]



Responsibilities



More than ten years experience of,

Responsible for the proper maintenance, repair and calibration of all instrumentation and control equipment of 10 DG set 17340KWe each 18v38 Stork wartsila engine w/ 13.8KV 60Hz Leroy somer generator and its medium and high voltage switchgear and auxiliary control, Generator protection relays, black start control DC back-ups UPS system and plant office communication equipment. Has the authority to conduct troubleshooting of all instrumentation and control equipment and communication equipment and also to initiate, recommend or provide solution to non-conformances through designated channels, work related problems and concerns.



POWER GEN

3.6 MW Diesel power plant

Manila international airport

Manila Philippines

I&C Electrical section head



Responsibilities [from June to august 2005]



Supervise and assist for the rehabilitation / repair of engine electrical control and instrumentation

Equipment of 2 unit 1700KWe 18v28 32H MANB&W engine generator prime mover,

Check inspection and testing of PLC base digital controller including protection relays, Panel metering, check all engine transducer for analog I/O for engine process control, Inspection and testing of the engine safety system.


Education


Educational Attainment



[ Zamboanga state college of marine sciences and technology]

[ Diploma in Marine electronics and communication technology]

[April 1994]


Certification


Seminars/Trainings :



Wartsila W38 Diesel Engine Course :

Wartsila NSD Corporation

WMPC Zamboanga City

August 1998 40hrs



Continuous Emission Monitoring :

David Padilla (4 hrs – Feb. 12 2004)Seminar

AIMS USA

Distribution System and Harmonics :

Alex Devocion-WMPC – June 6 2003

Western Mindanao Power Corp.



Chemical Spill :

MANTEK – June 19 2003

Western Mindanao Power Corp.



Power System Operation:

ML Tatel-WMPC-July 28 2003

Western Mindanao Power Corp.



Power Quality Monitoring :

Carlos Manila – WMPC-October 13 2003

Western Mindanao Power Corp.



BASLER AVR Set-up Orientation :

SP Andres – WMPC-Nov. 19 2002

Western Mindanao Power Corp.



Fire Fighting Trainings:

Bureau of Fire-WMPC-Nov.20 2002

Western Mindanao Power Corp.



Oil Spill Seminar

:Phil. Coast Guard-July 18 2002



Island Mode Operation Seminar :

WNSD-October 20, 2000



Advanced PLC :

RB Ramilo-WMPC-June 21 2000

Western Mindanao Power Corp.


Skils


Troubleshooting, maintenance repair and calibration of all generator panel instruments and controller, generator protection relays, medium high voltage switchgear Speed controller, engine speed monitoring system and SCADA, factorylink HMI, PLC, woodward 721 governor controller, basler AVR controller, thermostat, pressure and temperature transmitter for analog input, thermocouple, Pt100, RTD temperature sensors, Including engine aux. equipment EP400 controller for Alfa laval LFO HFO separator unit,

-PLC technician

-Industrial electronic and electrical technician

- Electrician

-Light & heavy equipment vehicle operator / driver

-Generator electronics & control technician

-VHF/UHF telephone technician

-Audio / Video technician

- Minor arc welding


 

Zamboanga City,
View Contact Information