Objective
Looking for an opportunity to work in a company in the field of designing and. manufacturing and carry out challenging tasks using my technical Knowledge and applied Skills.
Experience
With Aker Kvaerner Powergas Pvt. Ltd., Mumbai.
1. Maersk Oil Qatar – Block 5 FDP 2005 – C – 01220 (September 2007 – Till Date)
Owner: Maersk Oil, Qatar EPIC Contractor: Larsen & Toubro Ltd., India
Field: Al Shaheen Field, Block – 5, Qatar
Project Details: Detail Engineering of green field project consist of 3 Well Head Topsides with minimum process facility (IA, HA & HB), one – three legged Jacket (HB), one 100m long Bridge (HA-HB) and one 100m long Flare Boom (HB).
Responsibilities: Design Engineer for HA topside (In-service weight – 7200 MT, Lift weight – 2200 MT, 24 conductor slots & water depth of 57m). Work included complete pre-service and in-service analysis and design of topside on SACS, preparation design reports, WCR, MTO and checking drawings.
2. BO-B, BO-C and BO-D WHRP Topsides for Bunga Orkid Project (August 2006 – Till Date)
Owner: Talisman Malaysia Ltd. (TML), Malaysia Field: PM 3 – CAA, Bunga Orkid EPIC Contractor: Petroleum Technical Services Company (PTSC), Malaysia
Project Details: Detail Engineering of green field project consist of 3 Well Head Riser Platforms (BOB/BOC/BOD) and one 70m long Bridge (BOD/BOA).
Responsibilities: Design engineer for BO-D Topside (In-service weight – 2186 MT, Lift weight – 1856 MT, 18 conductor slots & water depth of 55m) and BOD bridge linked to BOA – CPP (5-Tier & has 23 process lines). Responsibility includes 3D modeling on SACS, analysis (including Inplace, Lifting, Loadout and Transportation), design, preparation of MTO, weight control report, design reports and detailing of all deck steel, equipment supports, civil pipe supports, checking of structural steel drawings for the same.
3. Maersk Oil Qatar – Block 5 FDP 2005 – C – 01220 (March 2006 – August 2006)
Owner: Maersk Oil, Qatar EPIC Contractor: Larsen & Toubro Ltd., India
Field: Al Shaheen Field, Block – 5, Qatar
Project Details: Pre-bid engineering of green field project consist of 3 Well Head Topsides with minimum process facility (IA, HA & HB), one – three legged Jacket (HB), two 100m long Bridge (HA-HB and HA-HC), one 100m long Flare Boom (HB) and one topside extension module (DAB).
Responsibilities: Design Engineer for topside extension module - DAB (three levels, operating weight 2057 MT, lift weight – 1483 MT), two bridges – HA-HB (weight – 370 TM) & HA-HC (weight – 337 MT) and one flare boom HB (weight – 145 MT). Work included complete pre-service and in-service analysis and design of all structure on SACS, preparation of weight control report, MTO and checking drawings.
4. KG-D6 Field Development Project (January 2006 to March 2006)
Owner: Reliance Industries Limited, India. Field: KG-D6 Field, India.
Project Details: Preparation of pre-bid specifications for offshore works.
Responsibilities: Involved in preparation of following pre bid specifications: 1) Offshore Installation; 2) Material, Welding and NDT; 3) Architectural Work; 4) Protective Coating; 5) Fabrication and Fit Up; 6) Loadout, Sea-fastening and Transportation; and 7) Specification for Grout Work.
5. 4-Well-Head Platform Project (December 2005 to April 2006)
Owner: Oil & Natural Gas Corporation Limited (ONGC), India EPIC Contractor: Larsen & Toubro Limited (L&T), India Field: Bassein Oil Fields, Bombay High, India.
Project Details: Detail Engineering of one Topside (BF) and one Jacket (BF).
Responsibilities: Assistant Design Engineer for four legged BF jacket (Lift weight – 1502 MT, 9 conductor slots & water depth of 63m). Work included 3D modelling of jacket on SACS, analysis & design (including inplace, fatigue and on-bottom stability), preparation of MTO, WCR and design reports, and checking of drawings for the same.
With V. V. Sapre & Associates, Indore
1. Structural Engineer for Mid India Corporation Project. Involved in the analysis and design of roof sheds, and under ground water tanks.
2. Structural Engineer for ACME Laboratories Pharmaceutical Project. Involved in the analysis and design of RCC Pharmaceutical Industrial Building. The structure is analyzed for Indian seismic zone IV and designed as specially moment resisting frame.
Education
Certification
Skils