Back to Resumes List

Sr. Hydrographic Survey Engineer

Engineer  / Naval Architect

Curriculum Vitae

SENIOR SURVEY ENGINEER

PERSONAL INFORMATION:                 Date of Birth     :  02 Oct 1965  

                                                            Nationality         :  Indian           

                                                            Passport No     :  Z1728285 and valid upto 26 Jun 2018

                                                                  CDC No            :  MUM 101655 and  valid upto 19 Aug 2022

          

SAFETY CERTIFICATES:        

  • OPITO approved BOSIET valid till : -   22 Sep 2021
  • Norwegian Medical valid till : -           24 Sep 2019
  • UKOO Medical valid till : -                  24 Sep 2019

ACADEMIC & PROFESSIONAL QUALIFICATIONS

  • Diploma in Electronic Engineering from Indian Naval Electrical Engineering Institute INS Valsura,
  • 6 month Diploma in Computer Hardware from Institute of management and Engineering Technology,
  • Personnel Management & Industrial relations from Institute of Management & Engineering Technology.
  • 6 months Diploma in computer science from Indo-German

TRAINING                 

COURSES    

Behavioural Training
1 Personnel Effectiveness 18 Jul 03
2 Project Managers Overview - Logistic Support 29 Jul 03
HSE Training
1 Basic offshore safety induction & emergency Training
(Inluding HUET & EBS)  - OPITO Approved
26-28 Nov 07
2 HSE Management System 05-07 Jun 06
3 Internal Auditors Training for Occupational Health and Safety Management System (OHSAS 18001 : 1999) 27 Jun 06
Occupational Training
1 Fundamentals And Advance Techniques Of Gps
Positioning
7 Jul 03
2 Hardware And Instalation Of New Software 8 Jul 03
3 Tides And Its Importance On Bathymetry And Operation Of Starfix Mss 9 Jul 03
4 Installation And Operation Of Gps, Dgps Equipments (Starfix Plus, Hp) 10 Jul 03
5 Interfacing & Operation Of Starfix Seis, Pc Tug 11 Jul 03
6 Fundamentals, Planning & Execution Of Survey 14 Jul 03
7 Operation Of Echo Sounder & Heave Compensator 17 Jul 03
8 Operation & Deployment Of Sector Scan & Usbl 24 Jul 03
9 Deployment Of Current Meter 7 Aug 03
10 Installation And Configuration Of Starfix Nav And
Drone
20-21 Aug 03
11 Operation And Navigation On Pipelay Barge 30 Jul 04
12 Coda Re200 Data Processing 05-06 Jul 04
13 Starfix Seis And Wombat 05-06 Aug 04
14 Glog, Gplot, Mosaic & Interp 08-16 Mar 05
15 Basic Starfix Geophysical Sutie 25 Sep 03 Oct 06

EMPLOYMENT HISTORY:

WORKING AS FREELANCE SENIOR SURVEY ENGINEER

06 May  – 01 July 2015              Carried out Sea Bed Survey at offshore of Saudi Arabia in Red Sea for Saudi Aramco. FSME Project No. SAH-11 / MS29

MV AL Nehem

FSME                                       Equipment : Star Pack, Applanix POSMV, TSS Meridian Gyro, SBES ODOM Echotrac MK 3, MBES KongsBurg EM 2040/2040C, Motion Sensor- (TSS MRU, Seatex MRU5), SV profiler- (Valeport Mini-SVP & AML MINOSX)   SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Sonardyne USBL (NCU, Tx/Rx-8068, Beacon- WSM) Magnetometer- Geometrics G881, SBP EdgeTech X-Star, Applied acoustic CSP 300, Boomer, Geopulse Rx-5210A, Mini Hydrophone, Glog IV

                                                Softwere:- Starfix Suit 10.1, Qinsy 8.10, SIS 4.1.5,(Multibeam Data Aquisition)  EdgeTech Discover, Glog/gplot, Data Log Express, Sea Cast,

                                                Sonardyne Fusion, MS office,

Responsible For: Maintainance of Survey equipment and Leading/Online Sr.Engineer

07 Sep – 14 Dec 2014                Carried out Sea Bed Survey at offshore of Saudi Arabia in Red Sea for Saudi Aramco. FSME Project No. SAH-11 / MS29

MV AL Nehem

FSME                                       Equipment : Star Pack, Applanix POSMV, TSS Meridian Gyro, SBES ODOM Echotrac MK 3, MBES KongsBurg EM 2040/2040C, Motion Sensor- (TSS MRU, Seatex MRU5), SV profiler- (Valeport Mini-SVP & AML MINOSX)   SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Sonardyne USBL (NCU, Tx/Rx-8068, Beacon- WSM) Magnetometer- Geometrics G881, SBP EdgeTech X-Star, Applied acoustic CSP 300, Boomer, Geopulse Rx-5210A, Mini Hydrophone, Glog IV

                                                Softwere:- Starfix Suit 10.1, Qinsy 8.10, SIS 4.1.5,(Multibeam Data Aquisition)  EdgeTech Discover, Glog/gplot, Data Log Express, Sea Cast,

                                                Sonardyne Fusion, MS office,

Responsible For: Maintainance of Survey equipment and Leading/Online Sr.Engineer

25 Nov – 30 Dec 2013                Carried out Site/ Seabed Survey at Block Wall & Sparrowhawk UKCS for Nexen Petrolium UK Ltd. FSL Project No. 131228-22

Fugro Discovery

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320, Mini Air Gun, SVP Valepot MIDAS SVX2,

                                                Softwere:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office

Responsible For: Maintainance of Survey equipment and  12 hrs online Shift

11 Nov – 24 Nov 2013               Carried out Site Survey at Block Mallard UKCS for Centrica, FSL Project No. 131183-22

Fugro Discovery

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320, SVP Valepot MIDAS SVX2,

                                                Software:-  Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office

Responsible For: Maintainance of Survey equipment and 12 hrs online Shift

05 Nov – 10 Nov 2013               Carried out Site Survey at Block Elgin UKCS for Total E&P Ltd. FSL Project No. 131015-22

Fugro Discovery

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320,SVP Valepot MIDAS SVX2,                                       Software:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot,  Data Log Express, MS office

Responsible For: Maintainance of Survey equipment and 12 hrs online Shift

29 Aug – 16 Sep 2013               Carried out Geohazard Survey at Block 15/29a UKCS for Chevron North Sea Ltd. FSL Project No. 130715-24

Fugro Searcher

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), SBP 300 (KongsBerg ), 6 Gun Array, 96 Channel 600m Streamer,  SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab, Softwere:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Long Shot(V8.13)for Gun Control, NTRS2, Seisnet, Data Log Express, MS office

Responsible For: Maintainance of Survey equipment and  12 hrs online Shift

24July – 28 Aug 2013                Carried out Environmental / Site Survey at Central North Sea for Shell

                                                Ltd. FSL Project No. 130927-24

Fugro Searcher

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), SBP 300 (KongsBerg ), Magnetometer Geomatrics G881, 6 Gun Array, 48 Channel 600m Streamer,  SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab,

                                                Softwre:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Long Shot(V8.13)for Gun Control, NTRS2, Seisnet, Data Log Express, MS office

Responsible For: Maintainance of  Survey equipment and  12 hrs online Shift

09 Jun – 15 Jun 2013                Carried out Debris / Site Survey at for Maersk Oil Nort Sea Ltd. FSL Project No. 130715-24

Fugro Searcher

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (EdgeTech Tow fish 4200-FS, SCU 7010DL), SVP Valepot MIDAS SVX2, Starfix Suit 9.1, Discover 4200 FS, Glog/Gplot, Data Log Express, MS office                  

Responsible For: Maintainance of  Survey equipment and  12 hrs online Shift

12 May – 8 Jun 2013                 Carried out SNS decommissioning / Environmental / Site Survey at Southern North Nea (Block 48/49 UKCS) for ConocoPhilips UK Ltd. 

Fugro Searcher

Fugro Survey Ltd                      Equipment / Software Used: Star Pack, SSS (EdgeTech Tow fish 4200-FS, SCU 7010DL), SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab, Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office                

Responsible For: Maintainance of  Survey equipment and  12 hrs online Shift

30 March – 16 April 2013          Carried out Vessel Positioning of KL saltfjord at  Jasmine/Judy field in UKCS for ConocoPhilips UK Ltd.

 KL Saltfjord

Fugro Survey Ltd                      Equipment Used: Star Pack, 4100LRS, Hemisphere, Meridian Gyro,  HPR USBL system, Starfix suit 9.1 for Online Navigation MS Office             

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

29 Aug – 27 Sep 2012               Carried out Vessel Positioning of DSV Seawell at GGA field in UKCS for Well Ops UK Ltd.

DSV SEAWELL                        

Fugro Survey Ltd                      Equipment Used: Vessel Positioning System (GPS with Fugro Starfix Demodulator 3500LR), HPR USBL system, Starfix suit 9.1 for Online Navigation                       

                                                Responsible For: Maintaining 12 hrs online Shift as Second Surveyor 

EXPERIENCE:          

Dec 2007 – Till 21 Oct 2011       Worked as Sr. Survey Engineer and online Second Surveyor on 2 months on one month off rotation with Fugro Survey (Aberdeen) Ltd and executed the following jobs:

                                                In between the offshore worked in workshop on various survey equipment Specialy on LBL system

10 Oct 11 – 21 Oct 11                Carried out Rig Move support of Wilhunter from Kraken to Orlendo in UKCS for SPD UK Ltd.  Job No. 31_00697 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor   

14 Sep 11 – 03 Oct 11               Carried out Rig Move support of Rowan Gorila5 from Dundee Ship yard to Franklin in UKCS for Total E & P UK Ltd.  Job No. 31_00698 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

26 Aug 11 – 9 Sep 11                Carried out Rig Move support of Sedco714 from Dradour (west of Sethland) to Ardbeg (East of Sethland) in UKCS for Total E & P UK Ltd.  Job No. 31_00694 (PM – F )

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

17 Aug 11 – 22 Aug 11              Carried out Rig Move support of Swift10 from Block L13 to K08 in Dutch Water for Shell Netherland.  Job No. 32_00665 (PM – Dave Parson)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

22 July 11 – 29 July 11              Carried out Rig Move support of Galaxy2 from Invergordon Ship yard to Faraday UKCS for GL Noble Denton.  Job No. 31_00465 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

09 July 11 – 18 July 11              Carried out Rig Move support of Sedco 714 from Oban to Edradour for Total E & P UK Ltd.  Job No. 31_00558 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

02 May 11 – 06 May 11              Carried out Rig Move support of NTVL from Tullich to Courageous for Maersk Oil UK Ltd.  Job No. 31_00061 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

19 Apr 11 – 24 April 11              Carried out Rig Move support of NTVL from Goosander to Tullich UKCS for Maersk Oil .  Job No. 31_00299 (PM – D Allen)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

22 Dec10 – 10 Jan11                 Carried out Rig Move support of Ensco102 from Judy to Jade for ConocoPhilips UK Ltd.  Job No. 31_00332 (PM – C. Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

02 Oct 10 – 13 Oct 10                Carried out Rig Move support of PBLJ from Monan UKCS to (Holand) Ship yard for BP UK Ltd.  Job No. 31_00295 (PM – G Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

19 July 10 – 26 July 10              Carried out Rig Move support of NTVL from Dunglass to Dunbarton UKCS for Maersk oil UK     Job No. 31_00317 (PM – C.Moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

15 June 10 – 30 June 10            Carried out Rig Move support of Safe Caledonia from Dunbar to to for Total E & P UK Ltd.  Job No. 31_00260 (PM – G Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

16 Apr 10 – 24 April 10              Carried out Rig Move support of Rowan Gorilla 5 from Elgin UKCS to Dundee Prince dock for Total E & P UK Ltd.  Job No. 31_00087 (PM – G Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

26 Mar 10 – 12 Apr 10                Carried out Rig Move support of NTVL from D11 Dumbarton to G30 Gryphon         UKCS field – for Maersk oil UK  Job No. 31_00093 (PM – G Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

24 Dec 09 – 10 Jan 10              Carried out Rig Move support of Ensco102 from M9 Joanne to M3 Joanne        UKCS field – for ConocoPhilips Job No. 31_00014 (PM – C.moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

24 Oct 09 – 28 Oct 09                Carried out site Survey on board Geo Prospector of Bugle 15/23 UKCS for Nexen Petrolium.  Job No. 2800071/2

Responsible For: Senior Survey engineer            

16 Oct 09 – 23 Oct 09                Carried out site Survey on board Geo Prospector of Brand 35/8 & 9 at Norwagian continental service for Nexen Petrolium.  Job No. 2800071/3

Responsible For: Senior Survey engineer            

26 Sep 09 – 09 Oct 09               Carried out Rig Move support of PBLJ from D8 Magnus to WI/25 Machar  UKCS  field   – north sea for BP Marine  Job No. 31_00035  (PM – G Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

29 Aug 09 – 07 Sep 09              Carried out Rig Move support of NTVL in North sea for Maersk/ Venture Job No. 31_0033/34   (PM – Georgina Fuller)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

15 Aug 09 – 19 Aug 09              Carried out Rig Move support of JW Mclean in North Sea for Petro .  Job No. 31_0007   (PM – Criss moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

4 Jan 09 – 04 Feb 09                Carried out Rig Move support of Borgsten Dolphin in- for Maersk.       Job No. 31_9698   (PM – Criss moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

24 Nov 08 – 01 Dec 08              Carried out Rig Move support of Noble Lynda Bossler at Dutch field  – North Sea for Offshore marine conrator.   Job No. 32_9799   (PM – Dave Pasons)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

19 Sep 08 – 24 Oct 08               Carried out positioning support of Skandi carla during construction support at KG/D6 field – Way of bangal, for Allseas.           Job No. 34 - Dhirubhai

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

07 Aug 08 – 15 Aug 08              Carried out Rig Move support of Rowan Gorila 5 at Franklin UKCS field – for Total E & P Ltd.         Job No. 31_9689   (PM - Cris moris

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

15 May 08 – 22 May 08             Carried out Rig Move support of PBLJ at Rinnes UKCS field – for BP Marine.     Job No. 31_9507   (PM - Criss moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

28 Apr 08 – 05 May 08              Carried out Rig Move support of Ensco101 at for Transocan

                                                 (PM - Cris moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

30 Jan 08 – 15 Feb 08               Carried out Rig Move support of LEIV Erickson at south UIST field – for Transocean.  (PM - Cris moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

17 Jan 08 – 28 Jan 08               Carried out Rig Move support of GSF Arctic iii for Petro . Job No. 31_9512    (PM - Cris moris)

Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift   as Second Surveyor

07 Dec 07 – 12 Jan 08              Carried out positioning support of Barge Excalibour During Geotechnical investigation for array Ltd. Job No.  39_9413   (PM – Dave Parsons)

Responsible For: Senior Survey engineer and online Surveyor

01 Dec 07 – 05 Dec 07              Carried out Positioning support of NLV Pharos during Well head marker buoy relocation at Islay UKCS field  for Tatal E & P Ltd Job No. 31_9399

Responsible For: Senior Survey engineer and online Surveyor     

January 2006 – Nov 2007          Worked with Fugro Survey () Pvt. Ltd as Party Chief / Sr. Electronic Engineer.

01 Oct 07 – 04 Oct 07                Carried out Pre Engineering survey at Gangavaram port Vishakhapatnam east cost of India for Gangavaram port Ltd.           (PM – Sudip Roy)

30 July 07 – 27 Aug 07              Carried out Geotechnical investigation support of SVR Bavenit at KG-D6 field east cost of for Fugro Holand. (Akar offshore Industries Ltd)

 

26 Feb 07 – 31 Mar 07               Carried out Pre-Engineering Survey on board M.V. Flamboyan at Mumbai High, Neelam and Heera filed for L&T.  Job No. J_MAR_07-01 (PM – V.D. Khanduri)

06 Dec 06 – 10 Feb 06               Carried out Pipelay Support on board DLB 332 at Mumbai High for Global Offshore.  Job No. J_CON_06_06                (PM – Bibhu Nayak)

09 Jul 06 – 29 Aug 06                Carried out Pipelay Support on board SSLB Semac 1 at Piltun Filed – for Fugro OPCO –

25 Apr 06 – 02 May 06               Carried out Pre Rig Move Stie Survey for BG Exploration and Production India Pvt. Ltd.  Job No. J_2003_77  (PM – Bibhu Nayak)

06 Feb 06 – 31 Mar 06              Carried out Pipelay Support onboard DLB 264 for Global Industries Offshore.

                                                Job No. J_2005_51       (PM – Bibhu Nayak)

April 2000 – Dec 2005               Worked with Fugro Geonics Pvt. Ltd as Sr. Electronic Engineer.

23 Nov 05 – 14 Dec 05              Carried out CP Survey of MUT T/Lines in Mumbai high for Hyundai Heavy Industries Ltd.

25 Sept 05 – 26 Oct 05             Carried out site survey of harbour for RPTL.

05Sep 05 to 13 Sep 05             Carried out Pre Rig move site Survey for BG Exploration and Production India Pvt. Ltd

16 May 05 to 22 May 05            Carried out Post Trench Survey of New Laid 28” & 30” pipe in Mumbai High for Hyundai Heavy Industries using

18 Mar 05 to 23 Apr 05              Carried out postioning of Pipelay Barge HD-60 and Anchor Handling during Pipelay for Hyundai Heavy Industries Ltd at Mumbai High

24 Feb 05 to 09 May 05            Carried out as laid Survey of 28” & 30” newly laid pipeline from MNW to Uran for Hyundai Heavy Industries

09 Jan 05 to 17 Jan 05              Carried out Rig Move of Discoverer 534 for RIL in K-G block/Kakinada

01 Jan 05 to 08 Jan 05              Carried out Rig Move of Trident – 6 at for Reliance Industries Ltd.

                                               Installation of automatic tide guage on PQ Platform for BG Exploration and Production India Ltd at panna field

                                               Carried out site survey at proposed Rig Location in KG Block for GSPCL

                                               Carried out Rig Move of Perro Negro-3 at KG Block off for GSPCL

                                               Carried out Rig Move of D-534 at D6 Block, off for RIL

                                               Pre-Construction Survey for New MUT Pipeline prorject in mumbai high for Oil and Natural Gas Corporation Ltd

                                               Pipeline Survey at Hazira West coast of for Clough Offshore

                                               Pre Engineering Survey for proposed SPM and in west coast of for Kochi Refineries Ltd., .

    Pre-engineering Surveys of N-9 Well Platform Project in High for Larsen & Toubro Ltd.

                                       Carried out pre-engineering Survey for New MUT Pipeline Project in Mumbai high for Oil and Natural Gas Corporation Ltd.

     As-laid Survey for Newly Laid Pipelines in Mumbai High & Bassein Field for Hyundai Heavy Industries Co. Ltd.

    Side Scan Sonar Survey, Off Tuticorin, Of for OTEC Project, NIOT, Chennai

   Site Survey of Proposed Pd-3s Well Location in Py-3 Field, Off Pandicherry, East Coast Of for Hardy Exploration and Production            () Ltd.

                                               Carried out Current Observations in for 36” Pipeline Crossing (SBHT) off , West Coast of India for Adsun Offshore Diving                                                      Contractors Pvt. Ltd.

Carried out Sector Scan Sonar for proposed and Platform at Bombay High for Hyundai Heavy Industries Co. Ltd.

                                         Carried out Currentmeter Observations at CM2 and CM3 Locations for Cairn Energy India Pty Ltd., CB-OS/2 Block Development Project, Off                                          Hazira

                                             Carried out Currentmeter Observation at Hazira Platform Location to LBDP at Hazira, West Coast Of India for Niko Resources Limited, Hazira Offshore                                                      Development Project

                                             Carried out Hazard Clearance Survey in 3D Seismic Survey Area, C‑23 and North Tapti Block, , West Coast of India for Laboratory of                                                         Regional Geodynamics (Large)

Carried out Soil sampling along proposed pipeline routes at Lakshmi field under CB-OS/2 Development Project off Hazira West coast of for Niko Resources Ltd.

Carried out Soil sampling along proposed pipeline routes at Lakshmi field under CB-OS/2 Development Project off Hazira West coast of for Cairn Energy India Pty Ltd.

Pipeline inspection Survey for IPCL in Ulwa Channel in/Panvel Creek for Gujarat Ambuja Cement Ltd.

Carried out Back-fill survey at Lakshmi Field for Hyundai Heavy Industries Co. Ltd.

Carried out Dredger Positioning (Ave Caesar) at Lakshmi Field for Hyundai Heavy Industries Co. Ltd.

Carried out Post-trench survey in Lakshmi Field for HHI Ltd.

Carried out Geophysical Survey at Machhlipatnam, Vizag for RIL

Carried out Seabed hazard / Anchor Clearance survey at PY3 Field for Hardy Exploration & Production () Inc.

Carried out Pre-engineering Survey for Shell India at Hazira/India

Carry out pre-construction survey for Cairn Energy at Surat/India

 

 From February 1984 to February 1999:- Employed in Indian Navy as Electronic Engineer and work on different capacity

             Equipment used : 

Echosounder:                     Raytheon 719C/D, Hydrotrac, Deso 20, Deso 15, Echotrack DF 3200, Simrad EM 3002 Multi Beam Echosounder

Heave Compensators:         TSS 320B, HS 50, MRU 4/H, DMS 2.

Sub Bottom Profilers:         EG&G Uniboom/Catamaran/230 Plate/231 Capacitor Bank 232A Power supply.       Geo Pulse: Catamaran/5813B Plate/5210A Receiver/5420A Power Supply, Apllied Acoustic CSP 1000 /1500 Power Supply, Sparker Comb. 1000j, 8 elements Hydrophone, : 310, Seabed 3010, Transreceiver/2x2 Transducer Array

HUNTEC  : Huntec 70-Deep Tow Boomer

Recorders:                          EPC 3200, 1600, Ultra 3710, 200-135

Digital Recorder:                 CODA- DA200, GLog, GPlot, Ultra 120, EPC 1086 MP, Geo pinter 975.

Side Scan Sonar:                EG&G 260TH Recorder/272TD Towfish, Geo Acoustic Transceiver / Tow fish, Klein 3000.

Positioning Systems:         TRIMBLE: 4000RL/DL/SST/RS/Navtrack/NT200, DSM12/DSM132/ms750

                                           STARFIX: VBS/MRDGPS/RTCM Convertor Box, 3500LR,  3100LR, 3000LR Receiver, LICA 400, Starfix HP, Star Pack, Multi fix 5, Delta fix Rx, Euro Drone, OMINISTAR / Microdome / Mdome / Flat Plate, Patch Antenna,  MICRO FIX, Beacons

CTDS System:                    Valeport 200M, SVP, Valeport 600 & 602

Currentmeters:                    Valeport: BFM 008, 108 MkIII. Anderra RCM-9

Tide Gauges:                      Valeport: 700/710/ATG740.

Gyro:                                  KVH Fluxgate Compass, S G Brown (Meridian ), Sperry SR 220 Gyro, Lehnkhul Repeater

Radio Commn:                   UHF Reference Station Setup, Teledesign TSI 9600, UHF Amplifier, VHF Teledesign, Satel,

Sector Scan Sonar:             MS 1000, Tritech Seaking, Simrad Mesotech 940.

Magnetometer:                    Geometric 810, Elsec Model 7706 Recorder, Seaspy

USBL:                                 Track Link, Sonardyne 8080

LBL:                                   Mk4/MK5 EHF/MF Compatt, ROV Nav 4/5

Software:                            Starfix.Nav, Starfix.Sies 9.1, EIVA, Qinsy, Multifix5, Windos 2000/XP/Vista/Window7, MS Office, Glog / Gplot, Coda, Fusion/Starfix Acoustic.

View Contact Information