Objective
To attain a position so as to give the best of my abilities and skills to satisfy the company goals as well as my personal goals.
Experience
Professional Experience: More than 14 years in various Shipbuilding Industries.
1) ABG Shipyard Limited
i) Position held : Senior Manager (Outfit)
ii) Duration : August 2009 to till date
iii) Work Site: ABG Site office, Dahej.
Responsibilities
1. Looking after hull, accommodation outfitting and HVAC work of Bulk carries as a departmental head under guidance of VP (Production).
2. Planning and execution multi projects based on main schedule received from the Project Manager.
3. Scrutinising the drawings and materials.
4. Liaisoning Class and Owner.
5. Managing and selection of in house sub – contractors, vendors for materials supply.
6. Preparing Work Order of Contractors and certification of bill through SAP.
7. Developing and implementing ISO and OHSAS in the departmental system.
Project Handling
32k bulk carries, 54k bulk carries.
2) Modest Infrastructure Limited, Bhavnagar
i) Position held : Production Manager (Production)
ii) Duration : April 2009 to July 2009
iii) Work Site: MIL, Bhavnagar.
Responsibilities
1. Worked as a Project Manager for Product Carriers.
2. Scrutinised of drawings mainly Hull, Outfitting, HVAC, Structural Fire Protection Plan & Insulation Plan, Partially Piping based on the requirement of Owner Specification and Classification Regulation as well as production convenient.
3. Finalised the realistic Production Schedule based on availability of drawings, materials delivery schedule and in house capability.
4. Coordinated with owner and class to resolve drawing related issues, finding of solution for day to day production related problems rose during inspection.
5. Arranged weekly meeting with owner rep. to find the actual status of the project, resolved critical issues.
Project Handled
2 nos. of Product Carries.
3) Bernhard Schulte Ship Management
i) Position held : Owners Representative (Hull & Outfit)
ii) Duration : March 2008 to March 2009
iii) Work Site : BSL Site Office, Ghodbunder, Mumbai
Responsibilities
1. Work as a Production Supervisor (Hull & Hull Outfitting)
2. Scrutinised Drawings based on the requirement of Technical Specification and Classification Regulation.
3. Monitored daily progress based on the Yard submitted Production Schedule.
4. Looked over day to day inspection as per the Shipyard programme.
5. Visited work places in monitored the works.
6. Worked with the Shipyard Project Manager to meet the possible target and to resolve the production related issues.
7. Advised shipyard for best possible solution to meet the requirement of the Technical Specification.
8. Arranged meeting with Shipyard Representatives and Class representative to meet the requirement of Class rules.
9. Prepared monthly progress report for Project Manager.
Project Handled
2 nos. of Supply Vessels.
4) ABG Shipyard Limited
i) Position held : Manager (Hull & Outfit)
ii) Duration : May 2001 to March 2008
iii) Work Site: ABG Site Office, Surat.
Responsibilities
1. Started Carrier as Junior Engineer in Hull and Outfitting Dept. under guidance of Departmental Head and ended carrier as a Manager with in span of 7 & 1/2 years.
2. Planned day to day activities, issued of materials, supervised the work and work progress. 3. Arranged inspected by classification society and owner rep as per the approved drawings.
4. Certification of Bills.
5. Selection of in house contractors and vendor for material supply.
6. Prepared work order of the individual works.
7. Maintained safety requirement.
8. Coordinated to solve the inter department problems.
9. Selection of colleagues.
10. Arranged departmental meeting to meet the target, to find improvement for the departmental drawback.
11. Arranged meeting with the contractors to meet the target and to make the future planning to achieved the target.
Project Handled
Delivered more than 15 Vessels, Bollard Pull Tugs, Anchor Handling Vessels, and Supply Vessels. Name of some of the prominent vessels are Multiple Supply Vessels for Lamnalco Group, Anchor Handling Tug for Halul, Bollard Pull Tug for SCI, CCC Pioneer for CCC, Pollution Control Vessel for Indian Coast Guard.
5) Hooghly Dock & Port Engineers Limited
i) Position held : Trainee Engineer (Project, under Project Manager)
ii) Duration : November 1999 to April 2001
iii) Work Site: Hooghly Docks, Kolkata.
Responsibilities
1. Worked as a Graduate Engineer Trainee under the Project Manager for 500 Pass cum 100 T Cargo Vessel and 50T Bollard Pull Tug.
Project Handled
500 Passenger cum 100T Cargo Vessel and 50 T Bollard Pull Tug.
KEY FUNCTIONS:
1. Draw up a departmental plan to execute and monitor the project.
2. Assure the timely execution of the project activities with the desired quality, according to the timetable and within the budget.
3. Identify and report impending deviations and ensure that measures are taken on time.
4. Manage the project team, take measures to ensure and monitor correct implementation of instructions.
5. Coordinate internal project discussions with all the stakeholders in the implementation of the project.
6. Report the status of the project on a regular basis to the management.
7. Draw up the Outstanding item list for defects observed during construction, delegate and follow up of such items
8. Coordination with Classification society, contractors, and suppliers.
9. Responsible for liaison and coordination with regulatory bodies, clients, contractors, manufacturers, suppliers.
10. Prepare various project related documents.
11. Coordinate timely completion project to ensure customer satisfaction.
Education
BE (Production)
Certification
Skils
Shipbuilding