Objective
To work in the Marine industry and aquire the skills to Further my expertise and belong to the orginization and show my leadership and team Player attitude.
Experience
PROFESSIONAL EXPERIENCE
ARABTEC PAKISTAN (PRIVATE) LIMITED........ 5-B Executive Tower, Dolmen City, Block-4, Clifton, KARACHI
A high profiled Civil construction network for super structure Internationally famous network for Civil Engineering.
APRIL 2008 TO April 2009 --------------------------- SAFETY MANAGER
Being as a part of Arabtec Pakistan (Private) Limited management team was responsible to manage and monitor safe work practices and safe procedures during Heavy Civil Engineering Construction Works including Deep Pile drilling, Steel cage lowering work, Concrete pouring, Test Pile Load testing, Deep Excavation & spoil disposal, De-watering phases of Super Structure construction of Karachi Financial Towers Project. Monitor housekeeping of construction site. Developed Safety induction Training, Tool Box Talks, Security Plan, Emergencies Procedures, Site safety instructions and various training program in English & Urdu versions and Safety Posters.
GUANGDONG OVERSEAS CONSTRUCTION GROUP Co. LTD........ 28-Beach Street, Phase VII, DHA, KARACHI
A high profile worldwide overseas construction group for high rise Super structure
JUNE 2007 TO APRIL 2008 --------------------------- CHIEF SAFETY OFFICER
JOB DESCRIPTION
Being as a part of GOCG – Asia (Private) Limited management team was responsible to manage and monitor safe work practices and safe procedures during construction of temporary facilities and Heavy Civil Engineering Construction Works including Deep Pile drilling, Steel cage lowering work, Concrete pouring, Deep Excavation & spoil disposal, De-watering, , Pile Capping, Basement Form work, Retaining walls, Back filling, Compactioning, Utility services pipe lines layout Monitor Erection, Inspection, operation of Tower Cranes & Lifting equipment, Monitor Scaffold erection & stripping phases of Super Structure construction of Creek Marina Residential Development Project. Monitor housekeeping of construction site and camps areas. Developed Safety induction Training, Tool Box Talks, Site safety instructions and various training program in English & Urdu versions and Safety Posters.
MAZYOOD GIGA INTERNATIONALCONSTRUCTION Co .......... 39A Block-3 HCHS, Alamgir Road, KARACHI
A high profile worldwide builder and civil construction network for Super structure and Reclamation & Edge Protection
FEBRUARY 2006 TO JUNE 2007 --------------------------- SAFETY MANAGER
JOB DESCRIPTION
Being as part of MAZYOOD GIGA INTERNATIONAL Safety management team was responsible to develop, manage, control and co-ordinate all aspects of the safety requirements and safe work procedures for Reclamation and Edge Protection activities of the Project as per HALCROW Pakistan Safety standards and safe work procedures.
ASSOCIATED CONSTRUCTORS LIMITED ............... 1103-1104, MEHDI TOWER, S.M.C.H.S, KARACHI.
A high profiled Civil construction network for super structure International famous network for Civil Engineers, Contractors.
JULY 2004 TO SEPTEMBER 2005 --------------------------- SAFETY MANAGER
JOB DESCRIPTION
Being as a part of ACL management team was responsible to manage and monitor safe work practices and safe procedures during construction of temporary facilities and Heavy Civil Engineering Construction Works including Deep Pile drilling, Steel cage lowering work, Concrete pouring, Deep Excavation & spoil disposal, De-watering, , Pile Capping, Basement Form work, Retaining walls, Back filling, Compactioning, Utility services pipe lines layout Monitor Erection, Inspection, operation of Tower Cranes & Lifting equipment, Monitor stripping, inspection & erection of RMD quick Form work and Scaffold erection & stripping phases of Super Structure construction of DHA Creek Vistas City Project. Monitor proper housekeeping of construction site and camps areas. Developed Safety induction Training, Tool Box Talks, Site safety instructions and various training program in English & Urdu versions and Safety Posters.
DESCON ENGINEERING LIMITED ---------------- AKHWAN HOUSE, 38 Sir Agha Khan III Road, LAHORE
A world famous high profiled network for Petro / Chemical / Energy Processing Plants / Client / Consultant / Principal Contractor activities.
DECEMBER 2003 TO JANUARY 2004 --------------------------------- SAFETY MANAGER
JOB DESCRIPTION
Being as part of DESCON safety team was responsible to led, manage, control and co-ordinate all aspects of the safety requirements as per T-11 Pakistan PTA plant safety standards and safe work procedures.
TECHNO ENGINEERING SERVICES (PVT) LTD -------------------------- DAR UL AMAAN H S KARACHI
An Engineering Network for oil, gas, water pipelines and civil works.
JANUARY 2003 T0 AUGUST 2003 --------------------------------------------------- HSE INSPECTOR
JOB DESCRIPTION
Being as a part of TECHNO HSE management team led and coordinated Health, Safety and Environment Initiatives and implemented safety standards and safe working procedures as per PAPCO safety standards.
? Conducted safety and tool box talks training program
? Initiate / prepare Accident / Incident / Near Miss occurrence reports
? Monitor functioning of work permit system for preparation of ROW & excavation activities
? Monitor safe work practices for haulage of heavy equipment
? Developed warning & prohibition safety sign boards
? Monitor safe work practices for 26” ? pipe stringing, welding, lowering & backfilling activities.
SGS Pakistan (Private) Limited -------------------------------------------------- 24-D/6 P.C.H.S. KARACHI
The World’s Leading Verification, Testing & Certification Organization.
NOVEMBER 2002 DECEMBER 2002 ------------------------------------------- HSE TRAINER
Conducted Certification Training Program for BP Pakistan Exploration & Production Inc. Personnel at Khaskheli Oil Filed. For the following subjects;
? Permit to Work
? Lifting Operation & Material Handling
? Confined Space Entry
? Work at Heights
TEKFEN CONSTRUCTION & INSTALLATION CO. INC ……………. AL-KHOBAR – KSA
A continental Engineering Network for oil / gas plants, trunk water pipeline / civil construction activities.
JULY 2001 TO AUGUST 2002 ………………………………………………….. SAFETY MANAGER
JOB DESCRIPTION
Being as part of TEKFEN management team, led and coordinated contractor’s safety, health & environment initiatives and implemented safety standards and safe working procedures as per Saudi Aramco safety standards.
a) Monitor safe work practices as per Saudi Aramco standards at mentioned below project pipeline segments for the following activities.
• HDAK HCL-1---------- 18” ø – 110 KM
• HDAK HCL-1 ------------- 24” ø – 128 KM
• HDUG – 1 ------------- 48” ø – 140 KM
• UBTG – 4 -------------- 48” ø – 57KM
• SRG – 1 --------------- 56” ø – 150KM
• Right of way and site roads development
• Drilling and Explosive Blasting
• Trenching
• Pipe stringing
• Field pipe bending
• 18”, 24”, 48” and 56” ø pipe lines Auto-welding
• NDT
• Joints Sandblasting and coating
• Holiday test and Pipe lowering-in
• Sand back-filling & final backfilling
• Berm forming & Stabilization
b) Monitor independently SRG-1, 56” ø pipeline job site
c) Conducted safety induction training & tool box talks program
d) Initiate / prepare Accident / Incident / Near Miss occurrence reports
e) Monitor compliance of work permit system for hot, cold, excavation, confined space entry, radiography and electrical isolation works
f) Developed warning & prohibition safety sign boards
g) Developed / implemented color code system, for lifting equipment / fire prevention equipment inspection & record procedures.
h) Monitor safe work practices for joints sand blasting (surface preparation) and coating / painting activities.
i) Monitor House keeping, Material stacking, safe use of welding electrical appliances, Fire fighting
appliances, sand bedding, Stringing, lowering, laying back filling, Compactioning, berming and stabilization of 56” diameter pipeline.
SAMSUNG HEAVY INDUSTRIES ---------------------------C-78,Block-2,Scheme # 5, Clifton ,KARACHI
An International network for heavy machinery, power plants, tankage, commissioning, civil construction and development activities.
JUNE 1999 TO JULY 2001 ……………………………………………….. SAFETY OFFICER
JOB DESCRIPTION
Being as part of part of Samsung Heavy Industries management team led and coordinated contractor’s safety initiatives, assisted in development of safety standards and safe work procedure at PARCO’s 220x40 feet ø Floating Roof crude oil tanks and modifications of existing tanks for crude oil service.
a) Developed / conducted safety induction training & tool box talks program
b) Developed site security plan
c) Developed work permit system for hot, cold, excavation, confined space entry, radiography and electrical isolation works & site safety instruction for safe work practices.
d) Developed equipment inspection & certification criteria
e) Developed / implemented color code system, for lifting equipment / fire prevention equipment inspection & record procedures.
f) Developed safe work procedures for:
Man riding basket, gas cylinders handling, crane operation and portable electrical tools.
g) Monitor tanks peaking, bending, thickness gauging work practices at heights
h) Developed tool box talks topics and safety audit guidelines
i) Monitor excavation, re-bar, form work and concrete pouring activities.
k) Developed warning & prohibition slogan and safety publicity posters.
j) Monitor safe work practices for sand blasting (surface preparation) and coating / painting activities.
k) Monitor tanks cathodic protection for Anode, perma cell network laying and welding activities
l) Monitor safe work practices for tanks sand blasting (surface preparation) and painting activities.
m) Monitor safe work practices during the tanks steel plates sketching roll bending, fabrication, bottom / roof deck plates lying, shell erection, welding, tanks modification, excavation, process pipes lying and tie in Job activities.
n) Monitor safe work practices for 220 feet ø tanks Roof air raising activity ever in Pakistan
o) Monitor pipes coating and wrapping activities
p) Monitor safe work practices for Holiday test, Hydro testing and Air flushing of process pipelines
q) Monitor tanks water filling for hydro test & settlement checks
r) Monitor Fire / foam system pumps installation and safe operational activities.
s) Prepare monthly safety statistics
t) Monitor project site house keeping.
u) Initiate / prepare Accident / Incident / Near Miss occurrence reports.
ICI (PAKISTAN) PTA BUSINESS …………………………………………….. BIN QASIM - KARACHI
A science based chemical company with consistently outstanding performance; technological edged to produce a diversified range of products like Paints Polyester fiber, Chemicals, Agrochemical Pharmaceuticals, Animal Health products and Pure Terephthalic Acid
JANUARY 1998 TO DECEMBER 1998 ………………………………………. SAFETY OFFICER
JOB DESCRIPTION
Being as part of the ICI T-11 PAT PLANT Safety and process team led and coordinated safety initiatives, assisted in development of ICI safety standards and safe working procedures. Fronted Confined space entry, Fire fighting,
Rescue operation, Stand by man, Toxic gas release, Scaffold erection /inspection, tag system, Color code system, Site/ Plant safety induction training program.
(a) Monitored safety standards and safe working procedures for operational maintenance, scaffold and scaff- tag system, radiography and house keeping standard.
(b) Translation of—ICI Permit to work system, Confined space entry and Stand by man, Toxic gas release, Fire & emergency evacuation, Safety induction booklet, Site/ plant video script, Warning / prohibition safety slogans.
(c) Monitored Raw material (chemicals) off loading.
(d) Attended water jetting training and monitored water jetting operation of pre heaters/coolers.
(e) Qualified in First Aid training program.
(f) Conducted site/plant safety induction training program of 950 personnel assigned for the Major Shutdown (1998) of the PTA Plant.
(g) Controlled Slips/Trips hazards during Major Shutdown 1998.
(h) Qualified in Exotox training program.
(i) Conducted SUSA Audit and Permit to work system compliance.
(j) Participated and analysis of Emergency Evacuation Sanrio.
FOSTER WHEELER (PROCESS PLANTS) LTD ………………………………….. READING, BERKSHIRE RG1 ILX
A world famous high profiled network for Petro / Chemical / Energy Processing Plants/Client /Consultant/Principal contractor activities.
JANAUARY 1997 TO DECEMBER 1998 ………………………………………….. SAFETY OFFICER
JOB DESCRIPTION
(a) ICI T-11 PTA PLANT
As part of the Foster Wheeler’s Safety Group co-coordinated and led contractor’s safety initiatives. Developed and fronted training programs to the contractor’s personnel assigned for civil, mechanical, electrical construction / erection pre commissioning and commissioning phases of the Plant.
(a1) Monitor Safety Induction and Tool Box Talk program.
(a2) Monitor safe work practices to establish compliance in accordance with the Foster Wheeler standards for;
Scaffold erection and scaff tag system- Steel structure erection - Grating lay out - Work at heights & falling objects –
Hand tools - Ultra heavy vessels and silos erection – Hazardous Chemicals - Stringing and lay out of piping at levels –
cooling tower erection.
(a3) Follow up safety standards for;
Permit to work system - Entry into confined spaces - Personnel protective equipment - Color code system - Radiography hazards - Proper house keeping.
(a4) Carried out weekly safety audit to control and implement safety standards and safe work practices.
(a5) Monitor safe work practices at heights for cable and cable trays laying, deep shaft, effluent / buffer tanks civil works including buildings false ceiling, painting, vessel & piping insulation & cladding work activities in accordance with the safety parameters.
(a6) Conducted scaffold inspector, fire fighting, toxic gas release and breathing apparatus training programs.
(b) RAW WATER PIPE LINE
During laying 50 km 18”, 24”, 30” and 32” diameter raw water pipeline monitor safety procedures and safe work practices for;
Sand blasting - Wrapping and coating - Safe use of welding electrical appliances, Holiday testing - Stringing, lowering and lying of multi dia pipelines.
(b1) Monitor safe work practices at water in take, pump house, brake pressure tank and cement motor lining job as per method statement.
(b2) Conducted safety induction and tool box talks to the personnel assigned at R.W pipeline.
(b3) Carried out safety audit to control and implement safety standards and safe work practices.
ASSOCIATED CONSTRUCTORS LIMITED ............... KEHKASHAN, CLIFTON, KARACHI.
A well famous network for Civil Engineers, Contractors.
JANUARY 1996 TO JANUARY 1997 --------------------------- SAFETY OFFICER
JOB DESCRIPTION
During temporary facilities and Heavy Civil Engineering Works including g, Excavation, Steel / form work, Scaffolding, Concrete pouring, back filling, Compactioning GRE / GRP fire water and utility services pipe lines layout phases of T -II PTA PLANT Project.
T-11 PTA Plant ------------------Core Area.
1. Control the provision of safe hygienic work environment for all the company and sub contractor’s personnel assigned in plant area,
2. Carried out stringing, lowering and lying of different diameter GRE / GRP fire water and utility services pipelines
3. Attended GRE/GRP Fire water line fabrication / repair training program at FW (PP) L.
4. Monitor safe work practices for:
- Scaffold erection / dismantling with scaff tag system in accordance with Foster Wheeler requirement – Adhere to Foster Wheeler procedures e.g. Permits, color code, security, cranes, audits, PPE requirements,
5. Safety incentive scheme etc.
6. Safety Inspection of Heavy Earth moving Equipment and Vehicles assigned at Plant.
7. Developed safety induction / orientation training program, safety toolbox talk to promote / develop Safety
awareness of the work force.
8. Investigate and advise the on all the matters related accident / incidents and prepare appropriate recommendations to re occurrence.
9. Perform monthly serviceability inspection of all fire fighting appliances.
10. Monitor deep excavation, lining, and concrete pouring for heavy foundations at locations.
11. Display various types of safety posters & safety slogans related to job nature locations to develop / promote safety awareness of the work force.
12. Monitor safe operation and safe work practices at Batching Plant.
13. Monitor hygienic living environment at labor camp.
14. Carried out and maintain weekly Safety audit record in accordance with Foster Wheeler program.
15. Qualified Essentials of Supervising Safety course GSS Personnel Division (UK) at FW (PP) L.
SECURITY PACKERS ................................ DEAN ARCADE, CLIFTON, KARACHI.
A world famous network for removal exporters, transports, ship handlers and international forwarder
APRIL 1995 TO JANUARY 1996. ................................................. ASST. TRANSPORT MANAGER
JOB DESCRIPTION
? Preparation of transport plan & co-ordinate with the custom clearance operation
? Preparation of detailed road / survey and route selection plan
? Liaise with transporters for smooth, efficient & Safe transportation of equipment, machinery & bulk cargoes
? Physical survey / inspection of equipment, machinery & packages prior loading & transportation operation
? Monitor loading operation, keeping safety factors in view & proper distribution of weight / balance of the
packages
? Monitor proper documentation & maintain proper record of each vehicle transported with load details
? Follow up end to end transport operations.
SUEDROHRBAU S.A.LTD ……………………………………………………… AL-JUBAIL KSA
A world famous network for oil / gas, petrochemical pipelines, Hi-tension Power Cable & Civil Works.
MAY 1992 TO MAY 1994 …………………………………………………………….. SAFETY ENGINEER
JOB DESCRIPTION
During laying 65 km, 16" diameter JJMULT-1 Feed stock Gas Pipeline and in erection installation & commissioning phases of project for propane & butane gas plant within Saudi Armco ju'aymah Gas Plant for PETROKEMYA, JUBAIL.
SAUDI ARMCO JUAYAM’H GAS PLANT
1. Monitor safety procedures & safe work practices in plant for:
House keeping - Material stacking - Safe use of welding electrical appliances - Fire fighting appliances – sand
bedding - Stringing, lowering, laying back filling, Compactioning, berming of 16” diameter JJMULT-1 feedstock
pipeline.
2. Monitor safe work practices of pipeline work at overhead racks, tie-ink & erection of vessels.
3. Understand requirement and function of work permit system in accordance with Saudi Armco loss prevention
program.
4. Conducted safety orientation lectures & safety training program to develop / promote sound Safety awareness
5. Investigate & advise the supervisor on all matters related incidents / accident & prepare appropriate recommendation to prevent re-occurrence
6. Maintain monthly fire fighting equipment serviceability record
7. Monitor civil works including formwork, shoring, scaffolding, concrete pouring, and pre-cast foundations laying.
8. Attended Safety Orientation training program at JGP ARAMCO
9. 110 KV UNDER GROUND POWER CABLE & CIVIL WORK (MAKKAH & JEDDAH)
Carried out and monitor safety procedures & safe work practices for civil work & 110 KV power LOPF cables, Control cables laying, termination & testing. Sand bedding, sand covering tiling, backfilling, compactioning & asphalt works.
PAKISTAN AIR FORCE
JUNE 1966 TO JUNE 1991 .......................... CHIEF WARRANT OFFICER
Carried out & supervised the inspection, installation maintenance, repair, trouble shooting and modification activities related to wide range of modern aircraft fleet mechanical, hydro mechanical, Fuel, pneumatic, rotary equipment and field related activities on all levels assigned to optimize operations and achieve smooth & efficient function of the aircraft.
The under mentioned Engineering & Administrative courses qualified during the tenure of the service.
JOB DESCRIPTION
? Safety / Quality Inspection, maintenance & overhauling of aircraft flight controls, hydraulic, fuel & pneumatic
system and components.
? Inspection, maintenance & operation of low / high pressure compressor and hydraulic test bench/unit
? Scheduling & preparation of Instructional Training Program, both for the country and friendly countries trainees and for field safety practices.
? Performed Instructional Duties for 3 years at School of Aeronautics on various Engineering subjects.
? Preparation of Aircraft Maintenance & Operational Statistical Data, Usage of Coding language
? Forecast and prepare schedule for inspection & maintenance for aircraft / mechanical transport & staggering plans.
? Analysis and preparation of maintenance reports with explanation on safety / quality deviations in operation cost,
quality margins and performance control parameters.
? Administrate equipment / spares supply management & operate central tools store.
? Categorizing aircraft parts, spares, equipment and tools.
? Safety & Quality supervision of aircraft 2nd & 3rd inspection & maintenance.
? Plan Co-ordination & Safety meetings.
? Conduct Fire Fighting training program.
? Performed Administration, Planning, organizing, controlling and deployment on manpower on minor & major
projects with in parameter of Air force.
LANGUAGES : English, Urdu, Punjabi (RWS) Arabic (RS), Bengali (S)
Education
PROFESSIONAL Qualification:
? Associate Engineer in Aircraft Engineering Technology from School of Aeronautics, Pakistan Air Force in 1970.
? Professional Diploma - Industrial Modern Management from British Careers Training College – UK in 1981.
? Certificate Course of Information Technology from Baanhn Beli, Pakistan in 198.
Certification
Professional Training:
• Basic aircraft mechanic course• Mirage III EP/DP/RP aircraft familiarization course
• Mirage VPA aircraft familiarization course
• Aeronautical Inspection & Quality Control Service Course
• Instructional Technique Course
• Junior Commissioned Officer Course (Technical)
• Junior Commissioned Officer Course (Management, Organization, Administration, Leadership, PAF Law, English and Pakistan Studies).
• Falcon (VIP) Aircraft Familiarization Course
• Aircraft documentation course.
Skils
Safety Training:
• Qualified Essentials of Supervising Safety course GSS Personnel Division (UK) at FW (PP) L.
• Qualified in Exotox training program by International HQ Zellweger Analytics Ltd. – England.
• Permit to work system compliance by ICI Pakistan.
• Confined Space Training from Foster wheeler – Pakistan
• Rigging and Lifting Operation Supervisor from Foster Wheeler – Pakistan.
• Scaffolding and working at Height from Foster Wheeler – Pakistan.
• Participated and analysis of Emergency Evacuation Sanrio by ICI Pakistan.
• Fire Fighting and Prevention training course by ICI Pakistan.
• Site Supervisors Safety Awareness Program – Modules 1-10 from Marubeni Corporation – Pakistan.
• First Aid Course Program by Saudi Red Crescent Society – Kingdom of Saudi Arabia.
• DUPONT SUSA audit training program.
• Safety Orientation training program at JGP ARAMCO
Achievements:
• Awarded with 1 million Safe man-hours Safety Performance Shield form ICI Pakistan.
• Awarded with an Excellent Safety Performance Certificate upon successful completion of Major Shut Down - 1998.
• Awarded with 15.1 millions Safe man-hours Safety Performance Shield from ICI Pakistan.