Project- Survey Engineer.
- Project Engineering / Project Management
-
CAREER OBJECTIVE:-
To pursue a career in dynamic environment requiring initiative, drive and resourcefulness
To be flexible in learning new skills, transferring the knowledge and building confidence with my colleagues in confronting work related challenges.
To ensure that the design/ job execution procedure meet project requirements, applicable standards and engineering safety practices
PERSONAL/ EDUCATION DATA:-
• Nationality: Nigeria
• Date of Birth: - 15 July 1981
• Degree B.Tech (Electromechanical) 2005 Nnamdi Azikiwe University Awka
• NYSC NYSC Discharge Certificate 2008• Marital status: - Single
WORKING EXPERIENCE:-
Worked as a Survey Engineer in West African Ventures Nigeria Limited from 8 June 2009 to 30 April 2015. During my stay at, I was giving responsibilities such as Report Writing, Preparing of PROCEDURES and SCOPE OF WORKS for Geophysical and Geotechnical site surveys, PREQUALIFICATION OF SUBCONTRACTOR ,AUDIT OF SUBCONTRACTOR EQUIPMENT AND PERSONNEL, Review of SUBCONTRACTORS’ REPORTS AND WORK EXECUTION PLANS, I Serves as interface between SURVEY SUBCONTRACTORS AND PROJECT TEAM and QC roles to ensure that works are carried out in a professional, cost effective and timely manner while ensuring that survey contractors adhere strictly to client work specification and also meet or exceed client’s minimum requirement.
December 2009
Geophysical Survey from Okan NWP to shore for Chevron Nigeria EGP3A phase 1 Import-line
Surface Positioning for DSV during Engineering Jacket Dive Survey TIP project For Chevron Nigeria Limited
Pipelay, Surface Positioning of Jascon 30 for EGP3A Phase 1 import pipelay campaign for Chevron Nigeria Limited
Pipelay, Surface Positioning of Jascon 2 during TIP pipeline campaign for Chevron Nigeria Limited
As-laid survey of TIP/ EGP3A pipeline campaign FOR Chevron Nigeria Limited
December 2010- January 2011
pipeline pre-commission of EGP3A phase 1 Chevron Nigeria limited pipeline at Okan NWP Platform as Field Installation Engineer
installation of Spool piece and Topside tie-in to Okan NWP Platform as Field Installation Engineer
2012
Post- Trenching and Burial of 24 inches Import pipeline in Escravos Oil field from KP 14 to KP 7.9 for Chevron Nigeria Limited providing surface positioning for ‘Rossana’ Trenching Barge
Pipelay of 24” Export line in the ongoing Escravos Gas Pipeline Project (EGP3A Phase 2) from the shoreline to KP 16.8 (Shallow section) for Chevron Nigeria Limited utilizing the Jascon 2 PLB.
Pre-commissioning works of the 24 inch EGP 3A Export pipeline for Chevron Nigeria Limited offshore Escravos Field onboard the Jascon 30 DLB
2013
Prelay Survey for Okono-Okpoho 16" pipeline route for Nigeria Petroleum Development Company(NPDC)
Surface Positioning of Lewek Tucan DSV and Subsea Positioning of Divers/ assets during for Clamping of 6" & 8" leaking pipeline at Okono-Okpoho for NPDC
Surface positioning of Jascon 30 during installation of Okono -Okpoho 16" pipeline for NPDC
2014
Geotechnical Survey of Delta South Water Injection Platform (DSWIP), Delta south Production Platform (DSPP), to determine the load bearing capacity of the soil prior to the installation of Piles / living Quarters.
.
PLEM and CALM BUOY Installation works for the EGP 3A Export Gas Pipeline for Chevron Nigeria limited, Offshore Escravos Field utilizing the Jascon 30 DLB.
Installation of Living Quarters (Jackets) and Produced Water Disposal Platform in Delta south for Chevron Nigeria Limited utilizing the Jascon 2 and Jascon 25 DLB respectively.
2015 January - April 2015
Installation of Manifolds at Erha North Phase 2 green field development project at water depth of 1200m for Mobil Producing Nigeria providing surface position for the Construction Barge Jascon 31 and subsea position for ROV, ,AIWOCs LARS and Manifolds utilizing HiPAP and C-Nodes transponders
PROJECT ENGINEER EXPERIENCE
I also have professional experience in offshore installation engineering, procurement and construction involving complete life-cycle of projects. I also possess experience in execution and planning of Pipeline installation, offshore platforms installation, PLEM installation and heavy lifts among other key offshore activities. Besides excellent communication skills my strengths include
• Focus on quality processes, schedule of deliverables and involvement in the entire project life cycle.
• Establish and implement submittal handling procedure
• Establish & Update Project Schedules
• Hook up, installation of risers and spool connection, materials control.
• Structural detailing, Fabrication & Installation
• Laying and Commissioning of offshore Pipelines.
EHRA NORTH PHASE 2, Manifold Installation (Feb 2015 till Apr 2015)
Client: Mobil Nigeria
Description: This Project involves the transportation/installation of the following manifolds;
• Production Manifold – 6 Slot
• Production Manifold – 2 Slot
• Riser Base Gas Lift Module
Escravos Gas Project Phase 3A –CALM Buoy Installation / Flange Protector installation (Sept 2013 to Mar 2014)
Client: Chevron
Description: This Project involves two work scope ;
1. Installation of PLEM & CALM Buoy system installation including mooring chain, subsea hoses, floating hose and mooring hawser.
2. Installation of Subsea Flange protectors in 8 different location around Chevron field (Parabe, Meren, and
Transportation And Installation Of Pipelines And Risers {2010-2011}
Client: Chevron.
Description: This project involved the engineering, procurement, fabrication, installation, remedial painting and pre-commissioning of 5 nos. of 6”& 8” pipelines, as well as 10 nos. of platform stalk-on risers in various shallow water depths.
COMPUTER PROFICIENCY
• Microsoft Office package
• Quinsy 8.0 survey
• NAVIPAC software• AutoCAD
FAMILIAR TECHNOLGIES
DGPS, RADIO LINKS, Sub Bottom Profiler, USBL, SSS, SBES, MBES, Blue View, HiPAP , Magnetometer
CERTIFICATE AND DOCUMENTS :-
BOSIET: - Valid till 12 September 2017• Survival At Sea (SAS) Course
• Basic First Aid (BFA)
• Basic Fire Fighting (BFF)
• Helicopter Underwater Escape Technique(HUET)
Diploma in Navipac Tug Management System Course 2014
INTERNATIONAL PASSPORT:- Valid till June 2020
REFEREES To be presented On Request.
Referees