Back to Resumes List

Project Engineer / SHE Advisor

Objective


I would like to be Trained and Certified as a Marine Surveyor. I'm willing to go for a "Work as I Learn" programme. Salary is negotiable and could be discussed. I'm a Mechanical Engineering, diploma holder from Singapore. I have 15 yrs of Construction Experience in Oil and Gas.


Experience


SKILLS



Computer Literacy : Familiar with MS Project, Word, Excel.

Autocad 2000



Language Spoken : Fluent in English, Malay

Basic Arabic



WORKING EXPERIENCE



Nov 2007 to current : ExxonMobil, Chemicals



SHE Advisor, Singapore Parallel Train Project



- Take charge of Safety Health and Environment for IC&T

(Inter-Connecting & Tankage) Works



• To Monitor and Upgrade Contractor’s Performance thru “Intervention”.



• Reviewing of Method of Statements and JSA.



• Sharing of all contractor’s Safety Violations, Unsafe Acts and Conditions for sharing and learning.



• To attend daily co-ordination meetings with Main Contractors and its sub-contractors.



• Provide Safety Performance Report to Project Manager.



Mar 2006 to Oct 2007 : UTOC ENGINEERING Pte Ltd



Senior Project Engineer



- Erection Engineer for The Giant Observation Wheel Project (G.O.W) Singapore Flyer’- The Biggest Flyer Wheel in the World



• Erection of Temporary and Permanent Structures



• Scheduled and Supervise daily site activities.



• Planned and to Mobilise Construction Equipments, like Cranes, Transportations, Welding Machines and other tools.



• Mobilisation and Monitoring of Manpower needed on site



• To attend daily co-ordination meetings with other sub-contractors, clients and owners. Provide daily reports to Project Manager.



Jan 2004 to Mar 2006 : UTOC ENGINEERING Pte Ltd



Senior Project Engineer



- Equipment Co-Ordinator for Mechanical Equipments for Chiyoda International Indonesia (CII) in Jabung, Jambi, Sumatra Indonesia.



• Works closely with the client for the arrangement of transportation to receive equipments from Jetty, scheduling acitivities of Equipments with Client’s Planning Engineer.



• To monitor, update and schedule Equipments Installation.



• To monitor , update and schedule Equipments for Testing and Comissioning.



• To seek continuously to improve the quality of service provided and to participate in company wide quality initiatives.



Aug 2000 - Jan 2004 : UTOC ENGINEERING Pte Ltd



Project Engineer



- Maintenance Activities for ISK PetroChemical Plant (S) Pte Ltd



• To execute scheduled and un-scheduled Maintenance Work and provides progress reports to GM



• To provide Lifting Plans and Procedures in heavy lifting jobs and mobilization of cranes and transportation.



• Preparation of quotations, claims for additional & modification works that are not in the actual contractual scope



• Produce work sketch / designs, schedules and as-built drawings in Auto-Cad format for submission to client



• Expediting of materials and mobilization of consumables, manpower and equipments to site



• Attend Client’s meeting (Maintenance & Operations) to co-ordinate and decide project execution and highlight project interferences



• Handles, delegates and co-ordinate with sub-contractors for job execution



• Providing manpower and labours to Clients (as and when required)



• Co-ordinate the Works of replacement of pipes, platform repairs, servicing of Heat Exchangers through lifting and pressure testing, modification of pipes and structures. Erection of scaffoldings at various designations involving boiler repairs and servicing.



Feb 1997 - Aug 2000 : ROTARY ENGINEERING LTD



- Field Project Engineer for Tankage and Piping



• Assist Construction Supt for monitoring of status and provide reports and advices to meet report



• Prepare claims to additional & modification works



• Attend client’s meetings to highlight project / trade interferences.



• Take over the project in the absence of Construction Supts.



- Projects Involvement :-

o Mitsui Engineering & Shipbuilding – Poval Asia, 1997, Pulau Sakra, Jurong Island.



? Transportation and Installation of prefabricated shop tanks on site



? Fabrication works and site erection of tanks inclusive of pressure testing and commissioning works.



o Oiltanking Singapore Ltd – Pulau Seraya, 1998



? Floating tank repair and replacement of seals



o Bechtel International – Exxon Complex, Pulau Sakra, 1999



? Fabrication and Installation of Underground FireWater pipes, inclusive of pipe wrappings and commissioning test upon completion.



o Foster Wheeler Eastern Pte Ltd – Celanese Singapore, Pulau Sakra, 1999



? Transportation and Installation of prefabricated shop tanks on site



? Fabrication works and site erection of tanks inclusive of pressure testing and commissioning works.



Oct 1994 – Jan 1997 : FAR EAST LEVINGSTON SHIPBUILDING



- Piping Foreman



• Responsible for the monitoring of fabrication works and installation of piping system on – board ships.



• Prepare claims to additional & modification works



• Attend client’s meetings to highlight project / trade interferences.



• To ensure that raw materials purchased are delivered timely prior to fabrication works.



• Resolve all interferences with other trades during installation.



- Assistant Piping Superintendent



• Assist Superintendent to monitor and propose methods to meet schedule and datelines.



• Attends project meetings on behalf of superintendent to highlights problems encountered and to propose solutions.



• Be involved in worker’s welfare and provides assistant to worker’s problems.



- Projects Involvement :-



o B231, Floating Dock – Hong Kong Client.



o B233, SHU Project, Hydrogen and Gofiner Unit – Foster Wheeler Pte Ltd



o B236, Rig Module & Sub Structure – Santa Fe



o B241, Floating Production Storage and Offloading, FPSO – Norway.



Mar 1992 – Sept 1994 : DU PONT (LYCRA) S’PORE PTE LTD



- Process Technician



– Inspection & Packaging Dept / Warehousing



• Perform Quality Checks, by tracing and retrieving products that were reported bad and of failed quality test.



• Liasing with suppliers to stock-up raw materials.



• Provide Production Report to Team Leader’s.



- Documentation Controller – Expansion Phase I



• Filing and retrieving of Construction Drawings.



• Line tracing work.


Education


- DIPLOMA IN MECHANICAL ENGINEERING

Majoring in Plant Maintenance

Ngee Ann Polytechnic, Singapore



- DEGREE IN AEROSPACE OPERATIONS

ATTC, Singapore



- UNDERGRADUATE, BeENVOHS, BACHELOR DEGREE PROGRAMME



(To be Graduated in June 2011)


Certification


: Effective Supervisory Development Programme

: Shipyard Hot Work Assessor,

: Confine Space Assessor

: Building Construction Safety Certificate

: Lifting Supervisor Safety Certificate

: Possess Forklift Driving Licence

: Possess Class 2B/2A/3/4 Driving License & Vocational Taxi Licence


Skils


- Provide Quotation after view on site.. for Mechanical, Structure Works either lump sum pricing or labour supply.


 

Sinagpore, Singapore,
View Contact Information