Objective
work as a pipefitter or foreman
Experience
Becon Construction
Motiva Plant, Port Arthur, TX (Jacobs) Pipefitter Foreman 02/2011 - 02/2012
LNG Plant/Sabine Pass, Cameron, LA Pipefitter Foreman 11/2006 - 09/2007 Hurricane Katrina Disaster, Bay St Louis, MS Pipefitter/Inspector 10/2005 - 02/2006
• Read blueprints, ISO’s and P&ID’s to assure that all equipment is in place, all welds and joints were in accordance with specifications.
• Prepared time sheets and progress reports for employees.
• Submitted documentation for employee promotions and performance evaluations.
• Responsible for disciplinary action and terminations when required.
• Hydro/pneumatic testing of piping systems.
Department of Homeland Security/FEMA
Hurricane Katrina Disaster, Bay St. Louis, MS Pipe Inspector 09/2007 - 12/2008
Hurricane Katrina Disaster, Bay St. Louis, MS Pipe Inspector 02/2006 - 11/2006
H.B. Zachary
Florida Power & Light, West Palm Beach, FL GF/Planning Dept/Foreman 01/2009 - 12/2010
Shell Oil Refinery, Houston, TX Testing/Hydro (shutdown) 05/1995 - 09/1995
International Paper Mill, Pine Bluff, AR Maintenance 01/1990 - 05/1990
• Attended planning meetings. Studied blue prints to coordinate work schedules.
• Supervised the fabrication, installation of piping systems and equipment.
• Instructed foreman on safety and work activities for each crew.
• Reviewed and implemented disciplinary action for excessive absence and job performance.
• Prepared performance evaluations.
• Prepared time sheets and progress reports for employees.
Assists the planner by providing input to identify key success factors for Pipefitting crew. Provides leadership to cause the creation of organizational structure and processes required to fully execute the requirements of services and is responsible for the execution of Pipefitting services, quality, subcontractor performance, and construction cost. Evaluates Pipefitting service execution for compliance to contract, design data, schedule, cost budgets, and quality, advising the project team of status, issues, impacts, risk, and cost influence factors on to go scope. Maintains the short range look ahead plans and discusses all deviations with the General Foreman. Reviews and monitors cost and man-hour budget for installation process develops an equipment and tool requirement plan and reviews it with the General Foreman.
Sunshine Pipe
Fab Shop, Panama City, FL Pipefitter 02/2000 – 07/2002
• Fabricated and installed carbon and stainless steel pipe spools and small pressure vessels.
BE&K Construction
Gas Power Plant, Louisa, KY Pipefitter/Lead 10/1999 - 02/2000
Stone Container Paper Mill, Panama City, FL NCCER Trainer/Foreman 06/1999 - 10/1999
International Paper Mill, Moss Point, MS Pipefitter (shutdown) 03/1993 - 04/1993
Stone Container Paper Mill, Hopewell, VA Pipefitter (shutdown) 02/1993 - 03/1993
Meade Paper Company, Chillcothe, OH Pipefitter (shutdown) 09/1992 - 10/1992
Champion Paper Mill, Canton, NC Pipefitter (shutdown) 04/1992 - 06/1992
• Implemented safety program for team members.
• Prepared time sheets and productivity reports.
• Reviewed blueprints, ISO’s and P&ID’s to maintain production schedule.
• Executed NCCER hands on testing for pipe certification.
• Ordered and coordinated vendor delivery of material.
• Conducted safety meetings with pipe crew.
Brown & Root
Chemical Plant, Theodore, AL Pipefitter 03/1999 - 06/1999
Champion Paper Mill, Courtland, AL Pipefitter 06/1998 - 02/1999
Polymer Chemical Plant,West Lake, LA Pipefitter 01/1998 - 06/1998
Shell Oil Refinery, Houston, TX Pipefitter 01/1995 - 05/1995
Stone Container Paper Mill, Panama City, FL Pipefitter (shutdown) 07/1994 - 09/1994
Phillips Petroleum, Old Ocean, TX Pipefitter 04/1991 - 07/1991
Nutra Sweet Chemical Plant, Augusta, GA Pipefitter 07/1990 - 02/1991
Champion Paper Mill, Sheldon, TX Pipefitter (shutdown) 05/1990 - 07/1990
Amoco Oil Refinery, Texas City, TX Pipefitter (shutdown) 10/1989 - 12/1989
Steel Mill Electro Plant, Ridgeville, SC Instrumentation Helper 05/1983 - 11/1983
Chevron Oil Refinery, Pascagoula, MS Helper, 2nd Class 04/1982 - 04/1983
Spartan/Jacobs/Day & Zimmerman
Oil Refinery, Shreveport, LA Quality Control 10/1996 - 02/1997
Philadelphia Quartz Chemical Plant, Augusta, GA Pipefitter 12/1991 - 03/1992
• Inspected piping systems in preparation of hydro-testing.
• Instructed employees on correct procedure for quality improvement.
Watkins Engineering Pipefitter/Maintenance 04/1993 - 07/1994
Proctor and Gamble, Augusta, GA
• Maintained equipment and piping systems for chemical plant.
Education
Certification
• NCCER Pipe Certification
• NCCER Pipe Certification Instructor
• TWIC Card (Special badge for International Trade Zone)
• OSHA Safety Certification (10 hr)
• OSHA Standards for the Construction Industry Certification (29 CFR Part 1926)
• Becon and Zachry Construction: Material Data Safety Sheet (MSDS), Rigging, Supervisory, Lockout/Tagout, Small Tools, Fork Lift, Inventory Control,Warehouse/Lay-down yard, Sky Lift, Hydraulic Man Lift and Safety
• Department of Homeland Security: Government Ethics, Equal Rights Organization Trilogy, Safety Briefing, Joint Field Office Orientation, Travel Rules and Regulations, Security Awareness, QuickTime, Violence in the Workplace, Sexual Harassment, Defense Driving, Customer Service, Valuing Diversity, Quality Assurance, Continuity of Operations Awareness, Incident Command System, Occupational Safety Hazard Agency and Material Safety Data Sheets
Skils