Objective
Seeking a challenging environment that encourage learning and provides exposure to new ideas with which I can disclose my multifaceted technical and analytical capabilities backed by strong will there by stimulated personal and professional growth where I shall be a part of growth.
Experience
EXPERIENCE IN DETAIL
1. Presently working as COATING INSPECTOR with OVERSEAS TECHNICAL
COATINGS LLC, DAMMAM, involved in all type of critical & general
industrial coating and Insulation specially for SAUDI ARAMCO AND
SABIC PROJECTS
2. ENGINEER, AS A SHIFT INCHARGE In pipe coating division (3LPE, 3LPP, FBE, DFBE, POLYURETHANE, INTERNAL SOLVENT BASE AND SOLVENT FREE EPOXY COATING)at WELSPUN GUJRAT STAHL ROHREN LTD. ANJAR.(KUTCH), GUJRAT.
From 16th August 2005 to 15th October 2008
3. TRAINEE EXECUTIVE ENGINEER, at APOLLO TYRE LTD. VADODARA, GUJRAT. From 8th March2004-13August2005.
4. TRAINEE ENGINEER, As a Electrical Engineer, at BHILWARA SPINNERS LIMITED, BHILWARA, from August 2002-Februay 2004.
Major Projects Handled with in Saudi Arabia with O.T.C
1) KHURSHANIYA GAS PLANT from 24th JAN 2009-22nd FEB 2009.
2) JUYAMAH GAS PLANT from 23rd FEB 2009 - 21 MAR 2009.
3) RAS TANURA DIESEL HYDRO TREATOR PLANT
Well familiar with major SAUDI ARAMCO Engineering Standards,
Saudi Aramco Desktop (i.e SAES-H-series), Saudi Aramco Construction
Safety Manual(SACSM) ,NACE ,SSPC, DIN, NORD, AWWA, API, ASTM,
ISO, BRITISH , and CAN/CSA STANDARDS and related all documentation
and other rules and regulation.
Education
.Diploma in Electrical Engineering With Aggragate of 73.73% from Rajiv Gandhi Prodhoyogiki VishwaVidhyalaya, DAMOH.(Madhya Pradesh) in March-April 2002
Certification
1.Completed NACE Coating Inspection Level (CIP) LEVEL-I with an Aggregate of 90 %.
2. Completed NACE Coating Insppection Level (CIP) LEVEL-II with an Aggregate of 88%
3.Completed Non .Destructive.Testing. LEVEL-2 In,Ultrasonic testing, Radiograph Testing, Liquid Particle Testing., Magnetic Particle Testing With Aggregate of 90 %.
Skils
1) Site coordination with all the concernedcontractors sub-contractors.
2) Reviewing/ verifying the work procedures/ method statements submitted by the subcontractors.
3) Coordination with the QA/QC for raising RFIs and conducting inspection with client representative.
4) Monitoring the final holyday detection of under ground lines prior to burial.
5) Ensuring that all operating parameters and all working procedure is as per specification and follows standard.
6) Preparing NCRs for the coatings not conforming the specification and discussing with project/Q.C manager for the corrective or the preventive action to be taken.
1. Inspecting and documenting coating parameters at various stages are as per specifications.
2. Accepting approved coating material and material to be coated after release only.
3. Inspection of raw material, stage wise and final inspection of the product as per the
4. Ensuring that calibrated instruments are used for inspection and testing.
5. Data entry in SAP system for all activities and verification for correct entries
6. Monitoring and recording of process control parameters.
7. Maintaining of calibrations records.
8. Co-ordination with Third Party Inspection agency.
9. Implementation of Work Instruction for various inspection activities.