Objective
Having 7+ years of Experience in the field of Quality Assurance and Quality control Services Have performed inspection in the fields Oil and Gas Petrochemical Construction Project s, Fabrication Workshops Inspections of raw materials, piping related activates like spool orientation and dimension check, Punch list check, Test package Preparation and clearing, witness pressure test, NDT, PWHT, coordination, and interpretation of radiographs, Welder Qualification,
Experience
Company:M/s Mil Industries Ltd. Chennai. India.
Designation:Mechanical QA/QC Supervisor from 01-Jan-2010 to till date
Client:Reliance industries ltd, Indian petro products ltd, Coromandal fertilizers’ ltd,Southern petro products ltd, Chemplast, Tamilnadu petro products ltd, Gea Energy System ltd, Etc
Project : CO Project & VAM Project
Client: Saudi International Petrochemical Company
Name of the company: Eram Engineering Company
Position: Mechanical QA/QC Inspector
Duration: 5thJuly 2008 to Nov 2009
Name of the project: Qatar Gas QCS QG3 &4 LNG onshore projects
Name of the client : Chiyoda Technip joint venture (CTJV)
Name of the company: Gama Com W.L.L Qatar
Position:Mechanical QA/QC Inspector
Duration:7thJun 2007 to 11thMay 2008
Company:M/s Mil Industries Ltd. Chennai. India.
Designation:Mechanical QA/QC Supervisor from 06-May-2003 to 03-Jun-2007.
Client:Reliance industries ltd, Indian Oil Corporation ltd, Coromandal fertilizers’ ltd,Southern petro products ltd, Chemplast, Tamilnadu petro products ltd, Etc
? Inspection and erection of piping system as per approved isometric & PID drawing
? Inspection of Punch listing of piping prior to MC,RFC&RFSU
? PMI Checking in all Project raw material and all related documents
? Witnessed hydro test, pneumatic test, reinforcement pad leak test , flushing /air blowing
? Checked valve orientation on high pressure steam and other critical lines before erection / fit up
? Verification of field rectification report issued by construction
? Co ordination with construction Team for Re Instatement activities
? Line check before commissioning activities and assist in test pack preparation
? Verified subcontractor MC, RFC & RFSU,Hand over completion dossier
? Conducted material inspection and identification, Reviewed mill certificate/ material test certificate
? Ensure that installed piping components conform to isometric requirements & project specifications.
? Coordinate with contractor representative for as-built drawings, test reports, release notes, final acceptance certificates, etc.
? Conducted fit up and Erection inspection on Steel structural, pipe, critical installations like boiler, Steam drum, super heater, Turbine, Compressor, reactor, steam reformer, reformed gas separator, process condensate stripper, regenerator, Heat Exchangers, Pressure vessel, Tank, Air cooler, lube oil skid, in accordance with approved PID
? Coordinate with Contractor Representative to ensure that all construction procedures (WPSs, PQRs, Pressure Testing Procedure, Fabrication Procedure, Site Erection Procedure, NDT Procedures etc.) are in place prior to completing of jobs.
? Ensure that all construction activities conform to the governing construction codes / Specifications / Standards and drawings which entail piping welding inspection NDT reports, review final QA/QC dossiers.
? Maintaining Housekeeping at a high level within the department through the involvement of all team members.
? To carryout in stage inspection and final inspection fabrication and site erection.
? Spool released documents preparation and offering client inspection
? Ensure that installed piping components conform to approved isometric and project specification
? Witnessed hydro test, pneumatic test, reinforcement pad leak test , leak test
? Co ordination with the NDT/ PWHT crew
? Offering and coordinating the client inspection
? Preparing hydro and pneumatic test package
? Prepare RFI request and summit client
? Inspection of PMI and Material verification.
? Inspection of fit up, welding and consumables as per the client requirements
? Inspection of punch list of piping prior to hydro and pneumatic testing
? Conducting all calibration of all welding equipments and maintaining the data’s
? Conducting procedures and welder qualification test
? Inspection of material necessary for installation as per standards
? To supervise daily inspection of fabrication work shop and erection of the same at site
? Prepare and summit the work completion report to the SNR Engineer
? Maintaining the records such as WPS.PQR,NDT,PWHT,HT, inspection data’s & QC dossier
? Supervised radiograph as per acceptance standards ASME
? Ensure employees are trained to do their work and their training is documented.
Education
Diploma in Mechanical Engineering 2000 to 2003
Certification
ASNT Level II ( RT/MT/PT/UT)
MS Office (Word,Excel,Powerpoint)
Skils
Having 7+ years of Experience in the field of Quality Assurance and Quality control Services Have performed inspection in the fields Oil and Gas Petrochemical Construction Project s, Fabrication Workshops Inspections of raw materials, piping related activates like spool orientation and dimension check, Punch list check, Test package Preparation and clearing, witness pressure test, NDT, PWHT, coordination, and interpretation of radiographs, Welder Qualification,
I am Looking for jobs in overseas