Objective
Seeking a responsible and rewarding position in a dynamic, challenging and creative environment, this encourages creativity of ideas and approaches to utilize my acquired skill/knowledge in achieving organizational goals.
Experience
COMPANY - BHARATI SHIPYARD LIMITED, RATNAGIRI.
(Shipbuilder & Ship repairs-ISO 9001-2000 Certified)
POST - SENIOR ENGINEER. (TECHNICAL EXECUTIVE)
Department - ENGINEERING DEPARTMENT (Installation & Commissioning)
Date of Joining - 10th NOVEMBER 2006
End Date - Presently Working.
ACHIVEMENT: -
Handling PROPULSION LINE work (LASER Alignment for straight propulsion required for chock fasting/ boring) i.e. Stern tube alignment, underwater seal fitment single-handed for 4 vessels of Bourbon Supply Investments, France & one vessel of Rolls- Royce.
Letter of appreciation from YARD HEAD for completing above work in recorded time.
JOB PROFILE
*In charge of Alignment of Propulsion shafting comprising of Propeller, Propeller shaft, Intermediate shafts, Reduction gearbox, Marine engines, Alternator, Fire pump, Stub shaft, Cardan shaft etc.
*Alignment of propulsion line machinery using conventional methods as well as sophisticated methods like Laser equipment. Laser Alignment of stern tube for chock fasting & boring work.
*Installation of D.G. set (Aux. Engines), Bulk air compressors, various types of plants, auxiliary pumps, & heavy machinery in vessels. Also installation of deck machinery such as AHT winch, rope reels, capstan, tugger winch, anchor windlass, deck crane etc.
*HANDLING UNDER WATER WORK SUCH AS –
1.Fitment of the azimuth thruster & contra propulsion that rotates in 360 degree with propeller fan.
2.Fitment of the propeller fan, bow thruster & Stern thruster.
3.Fitment of the stern tube, which includes proper alignment of the forward & aft bush with bosses. As well as fitment of the forward, aft seal & fitment of rudder seals.
4.Installation of the Rudder, Actuator & Steering.
*JACK-UP LOAD & GAP/SAG measurement of the shaft especially in case of straight Propulsion system as well as checking radial & axial clearance of bearings, vibration measurement. Also fitment of OD Box & twin tube connection that passes through shaft.
*According to requirement fitment of vibracon, chocking, chock fasting, hot working, cold working, bedding work, Boring of stern tube.
1.Vibracon: - It is made up of stainless steel which having mirror finish surface that helps to adjust heights according to requirement.
2.Chocking: - Chocking is nothing but the one of the metal piece & chock fasting is the proxy resin compound that replaces the metal chock.
3.Chock Fasting: - Chock fast is the proxy resin compound that replaces the metal chock.
4.Bedding: - It is generally done for fitment of metal chock & Machine foundation for proper seating.
*Thoroughly involve in sea trial such as Endurance trial, Speed trial, vibration measurement, Maneuvering trial, Anchor handling trial, Compass trial, and Bollard pull trial as well as checking the performance of various machineries.
*Working with Root Cause Analysis Team.
RESPONSIBILITIES –
*According to requirement of the project prepare work scheduled for time management.
*Study the drawings & prepare material list for reduce wastage. Prioritize the task.
*Distribute the work among the group to achieve target. Take review of the work & implement best suitable method for maintain quality & to achieve productivity.
*Preparation of fortnightly schedule for reviewing the progress of work & revising the schedule.
*Consultant to Engineers & fitters for critical installation & alignment operations.
*Liaising & co-coordinating with Quality control & Class agencies as well as Owners representatives (OEM) for approval of installation & alignment jobs undertaken.
*Liaising with utility department for provision of utility equipment for installation operations.
PRESENT PROJECT –
1.Multi Purpose Supply Vessel with Dynamic positioning 2 facilities & 120 Ton Bollard pull for Bourbon Supply Investments, -France.
2.Platform Supply Vessel for Rolls-Royce Marine AS – Norway.
3.Platform Supply Vessel for UP OFFSHORE LTD -Bahamas.
Education
*BE IN MECHANICAL ENGINEERING
INSTITUTE - FINOLEX ACADEMY OF MANAGEMENT & TECHNOLOGY,
RATNAGIRI.
UNIVERSITY - MUMBAI UNIVERSITY
CLASS - FIRST CLASS WITH DISTINCTION (70%)
Year of passing - July 2006
*DIPLOMA IN MECHANICAL ENGINEERING
INSTITUTE - GOVERNMENT POLYTECHNIC RATNAGIRI.
CLASS - FIRST CLASS (71.81%)
Year of passing - June 2003
Certification
Skils
*In charge of Alignment of Propulsion shafting comprising of Propeller, Propeller shaft, Intermediate shafts, Reduction gearbox, Marine engines, Alternator, Fire pump, Stub shaft, Cardan shaft etc.
*Alignment of propulsion line machinery using conventional methods as well as sophisticated methods like Laser equipment. Laser Alignment of stern tube for chock fasting & boring work.
*Installation of D.G. set (Aux. Engines), Bulk air compressors, various types of plants, auxiliary pumps, & heavy machinery in vessels. Also installation of deck machinery such as AHT winch, rope reels, capstan, tugger winch, anchor windlass, deck crane etc.
*HANDLING UNDER WATER WORK SUCH AS –
1.Fitment of the azimuth thruster & contra propulsion that rotates in 360 degree with propeller fan.
2.Fitment of the propeller fan, bow thruster & Stern thruster.
3.Fitment of the stern tube, which includes proper alignment of the forward & aft bush with bosses. As well as fitment of the forward, aft seal & fitment of rudder seals.
4.Installation of the Rudder, Actuator & Steering.
*JACK-UP LOAD & GAP/SAG measurement of the shaft especially in case of straight Propulsion system as well as checking radial & axial clearance of bearings, vibration measurement. Also fitment of OD Box & twin tube connection that passes through shaft.
*According to requirement fitment of vibracon, chocking, chock fasting, hot working, cold working, bedding work, Boring of stern tube.
1.Vibracon: - It is made up of stainless steel which having mirror finish surface that helps to adjust heights according to requirement.
2.Chocking: - Chocking is nothing but the one of the metal piece & chock fasting is the proxy resin compound that replaces the metal chock.
3.Chock Fasting: - Chock fast is the proxy resin compound that replaces the metal chock.
4.Bedding: - It is generally done for fitment of metal chock & Machine foundation for proper seating.
*Thoroughly involve in sea trial such as Endurance trial, Speed trial, vibration measurement, Maneuvering trial, Anchor handling trial, Compass trial, and Bollard pull trial as well as checking the performance of various machineries.
*Working with Root Cause Analysis Team.
RESPONSIBILITIES –
*According to requirement of the project prepare work scheduled for time management.
*Study the drawings & prepare material list for reduce wastage. Prioritize the task.
*Distribute the work among the group to achieve target. Take review of the work & implement best suitable method for maintain quality & to achieve productivity.
*Preparation of fortnightly schedule for reviewing the progress of work & revising the schedule.
*Consultant to Engineers & fitters for critical installation & alignment operations.
*Liaising & co-coordinating with Quality control & Class agencies as well as Owners representatives (OEM) for approval of installation & alignment jobs undertaken.
*Liaising with utility department for provision of utility equipment for installation operations
PRESENT PROJECT –
1Multi Purpose Supply Vessel with Dynamic positioning 2 facilities & 120 Ton Bollard pull for Bourbon Supply Investments, -France.
2Platform Supply Vessel for Rolls-Royce Marine AS – Norway.
3Platform Supply Vessel for UP OFFSHORE LTD -Bahamas
COMPUTER LITERACY –
·MS OFFICE-XP (Microsoft word, Excel, PowerPoint etc.)
·AUTO CAD- 2D/3D