Back to Resumes List

Mechanical Engineer

Objective


CAREEER OBJECTIVE



• Seeking a global challenging career in the field of engineering level to make effective use of skills for the development of the organization.

• To work in an environment where performance is rewarded with new responsibilities.


Experience


PROFESSIONAL EXPERIENCE



• 1 Year and 5 Months in production

From 2nd August 2004 – December - 2005

OSWAL INDUSTRIES LTD (One of the leading VALVE manufacturer in INDIA) As Production Officer (Shift Engineer)



• From January 2006 – December 2007

HILL ELCTRONICS, ELECTRICALS AND OIL FIELD SERVICES

(Authorized distributors of OSWAL Valves in U.A.E)

As Project Engineer



• From December 2007- Till date

DUBAI SHIPBUILDING & ENGINEERING

(One of the leading Ship Building Company in U.A.E)

As Project Engineer


Education


Bachelor of Technology in Mechanical Engineering

From Cochin University of science and technology.


Certification


• Internal Audit training for ISO :9001:2000 Conducted by TUV Middle East in Abu Dhabi



• Quality System Awareness & Improvement Conducted by

ZANDIG TQM SOLUTIONS PRIVATE LIMITED


Skils


ROLLS AND RESPONSIBILITIES HANDLED



• Prepare daily production plan according to production schedule

• Allocation of man power according to daily production plan

• Ensure the machine setting in case of fresh product

• Arrangement of raw material for current shift and next shift

• Monitoring of out put

• Monitoring the quality of the product

• Observe the running condition of the machines

• Take corrective actions according to out put as well as specification

• Preparing shift reports

• Monitoring of Material loss

• Make production report through ERP system

• Put identification mark on the semi finished product



CURRENT ROLLS AND RESPONSIBILITIES



• Preparation of work plan according to repair list ( From Project Manager)

• Work distribution to different teams according to their ability

• Collect feed back from the work site and submit the work trend to Project Manager

• Check the work progress and arrange over times and holiday works

• Verifying the work done reports submitted by foreman

• Audit the cleanliness of Yard

• Weight calculation of plate renewal

• Preparation of Plate renewal Drawings ( Repair) In Auto Cad format with exact frame Numbers (Using Auto –Cad 2007)

• Preparation of schematic drawings for modified pipeline systems (for class approval)

o Fire system with new and old fire hydrants

o Bilge system and its connection with IOPP

o Fuel systems form Day tank to Engines and return lines

• Prepare work done report with neat diagrams for client submission


 

Dubai, Dubai,
View Contact Information