Objective
I am looking for an organization that lends me a supportive and operative learning environment with ample chances to contribute and diversify my knowledge and skills. Challenges me intellectually and offers me a good potential for future growth
Experience
Working with “SHELL PEARL GTL PROJECT ”
Ras laffan, QATAR.(CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY)
This world-scale project allows the State of Qatar and Shell to work together
to build a new industry, which will provide an alternative way to utilize Qatar’s enormous gas resources in an economically robust and environmentally constructive way.
The Pearl GTL project comprises the development of upstream gas production facilities as well as an onshore GTL plant that will produce
140,000 barrels per day (bpd) of GTL products as well as approximately 120,000 bpd of associated condensate and liquefied petroleum gas.
The project will be developed in two phases with the first phase operational around the end of the decade.
The second phase will be completed around one year later. The project includes the development of a block within Qatar's vast North Field gas reserves, which will produce 1.6 billion cubic feet per day of natural gas.
Piping Engineer (Site)
Department : Mechanical & Process
From 22/7/2008-till date
Ø Project co-ordinator
Ø. Awareness of various inspection procedure used during the piping fabrication.
Ø Knowledge about Welding Procedure Specification.
Ø Pipe rack & material execution at site .
Ø Raised an documents for inspection request.
Ø To establish the procedures & systems at site in the area of piping supports fabrication.
Ø Ability to use the resources effectively i.e. man, machine etc.
Ø Maintain documentation for support release.
Ø Preparation of Bill of material from structural drawings.
Ø Responsible for Field Warehouse requisition support/spools.
Ø To support the existing Project team actively.
Ø Ensuring the procedures are implemented & followed.
Ø To check & deliver the first quality jobs within the stipulated time frame & within the budgeted cost as per shell standard and as per
the requirements of the customer.
Ø To deliver the first quality jobs within the stipulated time frame & within the budgeted cost. Ensure the good housekeeping at the site.
Ø Flawless start initiative co-0rdinator.
Ø Minimize the scrap and avoid rework.
Ø Promote the concept of ‘Safety First ‘ Safety Always ‘
Ø Identify & solve on a daily basis the problems and bottle necks to ensure smooth work progress at site.
Ø Inventory Management.
Ø Coordination with contractors & vendors/suppliers.
Ø Support to establish the TPM/ Kaizen/ERP systems etc. in the organization.
Ø Minimize the scrap and avoid rework.
Ø Coordination with contractors & vendors/suppliers.
Education
EDUCATIONAL
QUALIFICATION
POST GRADUATION
Year Of Passing – 2008
Autonomous Post graduate Diploma in “PIPING DESIGN ENGG. &CONSTRUCTION” from Trinity Academy of Professional Training, Pune With First Class.
BACHELOR OF ENGINEERING_- Mechanical.
Year Of Passing – 2007
Completed graduation in Mechanical Engineering from Sinhgad Collage of Engineering, Pune University in Higher Second Class.
DIPLOMA_- Mechanical.
Year Of Passing – 2003
Completed Diploma in Mechanical Engineering from Eklavya Polytechnic, MSBTE University in Distinction Class.
S.S.C. –
Year Of Passing – 2000
Completed S.S.C. f rom V.I.T. School, Maharashtra Board in First class.
Certification
Certification of International Institute of Leadership Management
(BRONZE WINNER)
Skils
(Starting from the most recent skills acquired)
Piping Egg. Skills including
v Sound knowledge of piping material, layout, stress analysis.
v Conversant with international codes and standards like B31.1, B31.3
v Preparation of P&ID, Plot Plan, Plant layout etc.
v Piping layout skills like piping isometrics, MTO.
v Stress analysis skills.
Skills learnt during diploma course.
v C.N.C Part Programming
Personal Characteristics
Positive attitude.
Ability to work on one’s own initiative .
Ability to work independently.
Good communication skills .
Customer orientation.
Ability to work in a team .
Flexibility
Ability to work under pressure (time / work load) .
Willing to familiarize with production flow of large brewery plants .
Ability to comprehend complex factors influencing the plant and to take measures accordingly.
environment
Ability to guide and instruct team members and members of other teams according to their level of qualification .