Marine/Process/Mechanical Engineer
- Engineer / Naval Architect
-
Personal Information
Citizenship : Korea
My immigrant petition based on National Interest Waiver (NIW) was approved.
Thereby, I will be eligible for the permanent residence and working in USA from the middle of March, 2017.
Education
Mar. 5, 1983 –
Feb. 24, 1990Bachelor of Engineering in Mechanical Engineering
College of Engineering, Dong-A University
Professional Experience
Jan. 1, 1990 –
PresentPart Leader, Ship Marketing Engineering Dept. 1
Daewoo Shipbuilding & Marie Engineering Co., Ltd.
Marketing engineering leader of Engine room system/machinery part in Marketing engineering department for Commercial ship (January 2007 ~ Present)
Shipbuilding specification control and development of Engine room system and machinery:
- Design philosophy and standard specification control
- Machinery and equipment configuration and dimensioning
- Process and system flow diagram
- Control logic and system design
- Machinery arrangement in engine room
- Cooling water, steam and electric load balance
- Rules and Regulations analysis
- Interface and coordination engineering of ship design
- Technical meeting and clarification with Client
- Quality control of shipbuilding specifications
Cost and material estimation and management:
- Project budget estimation
- Material and weight control
- Technical evaluation of machinery and equipment
- Cost and quality control of machinery and equipment
- Cost estimation program control
Greenship technology & design development:
- Energy efficient design and solution
. Hull form optimization and machinery arrangement
. Propulsion and auxiliary engine system optimization
. Energy recovery system
. Energy efficient machinery and system design
- NOx, SOx emission control
. Design development upon NOx, SOx emission regulations
. SCR and EGR solution and evaluation
. SOx scrubbing solution and evaluation
. System configuration and application engineering
- LNG fuelled ship development
. Dual fuelled engine system design
. Dual fuelled steam boiler system design
. Fuel gas supply system and safety design technology
. LNG fuelled system configuration and application engineering
- CAPEX and OPEX evaluation
Arctic technology & design development:
- POD propulsion system design and application for Arc7 ice breaker
- Winterization solution up to -52 C
- Air heat balance and Heating/insulation solutions
- Cooling water system configuration and design
- Machinery arrangement for Arctic hull form and POD propulsion
- Project engineering for Yamal Arc7 LNG Carrier and Block carrier
Project Performed:
All kinds of commercial ships such as LNG carrier, Containership, Crude oil tanker, Shuttle tanker, LPG carrier, Bulk carrier, etc.
Project engineering leader for Bidding project
- Evaluation of ITT document package
- Project engineering strategy and management
- Schedule and progress control
- Technical and commercial proposal package
- Technical meeting and clarification with Client
- Rules and Regulations analysis
- Shipbuilding Contract evaluation
- Working group leader of Project engineering leaders from 2012 to 2014
Outstanding Project contracted as Project engineering leader:
- Maersk Line 18,270 TEU Containership (Triple-E 1st Generation)
. 20 ships, Contract price of 3.8 bn$, 2 world highest contract price
. World best efficient ship
. Gold prize of Korea Technology Award
. Korea 10 Best New Technology Award
- Maersk Line 19,630 TEU Containership
. 11 ships, Contract price 1.8 bn$
. Improved 2nd Generation project of Triple-E Containership
- Yamal 172,600 m ARC7 LNG Carrier
. 15 Vessels, Contract price of 4.6 bn$, world highest contract price
. World first ice breaker applied to very large LNG carrier
. Minister prize of Science, ICT and Future Planning Ministry
Marketing engineer in Marketing engineering department for Commercial ship (June 2005 to December 2006 and October 1999 to June 2002)
Marketing engineer of Engine room system and machinery:
- Shipbuilding specification
- Propulsion system, electric power and steam generation system
- Process and system flow diagram
- Control logic and system design
- Energy efficient design and solution
- Machinery arrangement in engine room
- Cooling water and steam balance
- Procurement engineering: Specification, evaluation and documentation
- Cost and material budget estimation
- Technical meeting and clarification with Client
- Rules and Regulations analysis
Project Performed:
All kinds of commercial ships such as LNG carrier, Containership, Crude oil tanker, Shuttle tanker, Bulk carrier, etc.
Marketing engineer in Marketing engineering department for Offshore floating unit (July 2002 to May 2005)
Marketing engineer of Hull/marine system and machinery:
- Evaluation of technical contract specification package
- Detail engineering and material evaluation of hull/marine system
- Process and system flow diagram
- Control logic and system design
- Machinery arrangement in machinery space
- Cooling water and steam balance
- Procurement specification and engineering of machinery package
- Cost and material budget estimation
- Technical meeting and clarification with Client
- Rules and Regulations analysis
- Interface engineering for technical package
Project Performed : FPSO, FSO, FSRU, FLNG
- Terra-Nova FPSO : 1998~1999 as Document coordinator
- Shell LNG FSRU : Feed engineering & documentation
- Agbami FPSO Hull : Contracted.
- Sanha LPG FPSO, BP Angola B18 FPSO, BHP LNG FPSO, SBM FSRU, etc.
Marine system and machinery engineer in Engine room piping design department for Commercial ship (May 1994 to September 1999)
- Piping and instrument diagram in Engine room
- Control logic and system design
- Piping specification
- Cooling water heat balance and steam balance
- Procurement engineering: Specification, evaluation and documentation
- Technical meeting and clarification with Client, Class and Supplier
- Construction engineering : Commissioning, Mooring/Sea trials
- As-built drawing and documentation for Vessel delivery
Marine piping engineer in Engine room piping design department for Commercial ship (January 1990 to April 1994)
- Routing of piping, cabling, traffic in engine room
- Composite installation arrangement of machinery and piping
- Manufacturing drawing of piping and support
- Material control and procurement of piping
- Piping practice control and development
- Technical clarification with Client, Class and Supplier
- Construction supportConducted Projects
Jun. 2012 –
Dec. 29, 2019
H2418/21~34 Yamal 172,600m Arc7 Ice Breaking LNG Carrier
Client: Sovcomflot / Teekay / Mitsui / O.S.K. Line Ltd. / Dynagas Ltd.
Role: Project Engineering Leader
Amount: US $4.65 BillionSep. 5, 2014 –
May 31, 2019
H2441~46 BP Shipping 173,400m LNG Carrier
Client: BP Shipping Ltd.
Role: Part Leader
Amount: US $ 1.25 BillionNov 14, 2014 –
May 31, 2018
H4302~12 MAERSK Line 19,630 TEU Containership
Client: MAERSK Line
Role: Project engineering leader
Amount: US $1.8 Billion
Jun. 19, 2013 –
Sep. 2017
H5010~18 Tsakos-Statoil 112,800 DWT Crude Oil Tanker
Client: Tsakos Energy Navigation Ltd.
Role: Part leader
Amount: US $463 Million
Aug. 2012 –
Feb. 5, 2017H4277~82, H4296~301 Olympic/Pegasus 10,600 TEU Containership
Client: Mediterranean Shipping Company S.A. (MSC)
Role: Project engineering leader
Amount: US $1.8 BillionJul. 1, 2010 –
Jun. 30, 2015H4250~59, H4262~71 MAERSK Line 18,330 TEU Containership
Client: MAERSK Line
Role: Project engineering leader
Amount: US $3.82 Billion
Feb. 1, 2013 –
Apr. 30, 2015H5394/95/98/99 Scorpio 114,900 DWT Product Carrier
Client: Scorpio Tankers Inc.
Role: Project engineering leader
Amount: US $194 Million
Nov. 2007 –
Sep. 2013Standard shipbuilding specifications for a vessel machinery space
Role: Development and management of technology standards
May 23, 2008 –
Nov. 13, 2011H1198/208 TCC 180,000 DWT Bulk Carrier
Client: Tai Chong Cheang Steamship Co., Ltd. (Hong Kong)
Role: Project engineering leader
Amount: US $180 Million
May 22, 2009 –
Sep. 30, 2011H3303/04 RWEI Wind Turbine Installation Vessel
Client: RWE Innogy GmbH
Role: Part leader
Amount: US $240 Million
Jun. 2006 –
Jul. 2008H5902 Agbami FPSO Hull
Client: Star Deep Water Petroleum Ltd. (Chevron Texaco)
Role: Marine Machinery and System Engineering
Amount: US $1.1BillionAward
Dec. 6, 2012 2012 Korea Technology Award (Company) - for: development of high-efficiency eco-friendly container vessel
Prime Minister / Ministry of Public Administration and SecurityNov.4, 2011 2014 IR52 Jang Young-shil Award (Individual)
Ministry of Science, ICT and Future PlanningNov.4, 2011 2014 IR52 Jang Young-shil Award (Company)
Ministry of Science, ICT and Future Planning*******