Back to Resumes List

Marine/Process/Mechanical Engineer

Engineer  / Naval Architect

Personal Information

Citizenship         : Korea

                            My immigrant petition based on National Interest Waiver (NIW) was approved.

                            Thereby, I will be eligible for the permanent residence and working in USA from the middle of March, 2017.

Education

   
Mar. 5, 1983 –
Feb. 24, 1990
Bachelor of Engineering   in Mechanical Engineering
College of   Engineering, Dong-A University
 
 
Professional Experience
 
Jan.   1, 1990 –
Present
Part Leader, Ship Marketing   Engineering Dept. 1
Daewoo Shipbuilding & Marie   Engineering Co., Ltd.
 
Marketing engineering leader of Engine room   system/machinery part in Marketing engineering department for Commercial ship   (January 2007 ~ Present)

Shipbuilding   specification control and development of Engine room system and machinery:
- Design philosophy and standard specification   control
- Machinery and equipment configuration and   dimensioning
- Process and system flow diagram
- Control logic and system design
- Machinery arrangement in engine room
- Cooling water, steam and electric load balance
- Rules and Regulations analysis
- Interface and coordination engineering of ship   design
- Technical meeting and clarification with Client
- Quality control of shipbuilding specifications
 
Cost and   material estimation and management:
- Project budget estimation
- Material and weight control
- Technical evaluation of machinery and equipment
- Cost and quality control of machinery and   equipment
- Cost estimation program control
 
Greenship   technology & design development:
- Energy efficient design and solution
. Hull form optimization and   machinery arrangement
. Propulsion and auxiliary   engine system optimization
. Energy recovery system
. Energy efficient machinery   and system design
- NOx, SOx emission control
.   Design development upon NOx, SOx emission regulations
.   SCR and EGR solution and evaluation
.   SOx scrubbing solution and evaluation
.   System configuration and application engineering
- LNG fuelled ship development
. Dual fuelled engine system   design
. Dual fuelled steam boiler   system design
. Fuel gas supply system and   safety design technology
. LNG fuelled system   configuration and application engineering
- CAPEX and OPEX evaluation
 
Arctic   technology & design development:
- POD propulsion system design and application for   Arc7 ice breaker
- Winterization solution up to -52 C
- Air heat balance and Heating/insulation   solutions
- Cooling water system configuration and design
- Machinery arrangement for Arctic hull form and   POD propulsion
- Project engineering for Yamal Arc7 LNG Carrier   and Block carrier
 
Project Performed:
All kinds of commercial ships such as LNG carrier,   Containership, Crude oil tanker, Shuttle tanker, LPG carrier, Bulk carrier,   etc.
 
Project   engineering leader for Bidding project
- Evaluation of ITT document package
- Project engineering strategy and management
- Schedule and progress control
- Technical and commercial proposal package
- Technical meeting and   clarification with Client
- Rules and Regulations analysis
- Shipbuilding Contract evaluation
- Working group leader of Project engineering   leaders from 2012 to 2014
 
Outstanding   Project contracted as Project engineering leader:
- Maersk Line 18,270 TEU Containership (Triple-E   1st Generation)
. 20 ships, Contract price of 3.8 bn$,   2 world highest contract price
. World best efficient ship
. Gold prize of Korea Technology Award
. Korea 10 Best New Technology Award
- Maersk Line 19,630 TEU Containership
. 11 ships, Contract price 1.8 bn$
. Improved 2nd Generation project of   Triple-E Containership
- Yamal 172,600 m ARC7 LNG Carrier
. 15 Vessels, Contract price of 4.6   bn$, world highest contract price
. World first ice breaker applied to   very large LNG carrier
.   Minister prize of Science, ICT and Future Planning Ministry
 
Marketing engineer in Marketing engineering   department for Commercial ship (June 2005 to December 2006 and October 1999   to June 2002)
 
Marketing   engineer of Engine room system and machinery:
- Shipbuilding specification
- Propulsion system, electric power and steam   generation system
- Process and system flow diagram
- Control logic and system design
- Energy efficient design and solution
- Machinery arrangement in engine room
- Cooling water and steam balance
- Procurement engineering: Specification,   evaluation and documentation
- Cost and material budget estimation
- Technical meeting and clarification with Client
- Rules and Regulations analysis
 
Project   Performed:
All kinds of commercial ships such as LNG carrier,   Containership, Crude oil tanker, Shuttle tanker, Bulk carrier, etc.
 
Marketing engineer in Marketing engineering   department for Offshore floating unit (July 2002 to May 2005)

Marketing   engineer of Hull/marine system and machinery:
- Evaluation of technical contract specification   package
- Detail engineering and material evaluation of   hull/marine system
- Process and system flow diagram
- Control logic and system design
- Machinery arrangement in machinery space
- Cooling water and steam balance
- Procurement specification and engineering of   machinery package
- Cost and material budget estimation
- Technical meeting and clarification with Client
- Rules and Regulations analysis
- Interface engineering for technical package
 
Project   Performed : FPSO, FSO, FSRU, FLNG
-   Terra-Nova FPSO : 1998~1999 as Document coordinator
-   Shell LNG FSRU : Feed engineering & documentation
-   Agbami FPSO Hull : Contracted.
- Sanha LPG FPSO, BP Angola B18 FPSO, BHP LNG   FPSO, SBM FSRU, etc.
 
Marine system and machinery engineer in Engine   room piping design department for Commercial ship (May 1994 to September 1999)
- Piping and instrument diagram in Engine room
- Control logic and system design
- Piping specification
- Cooling water heat balance and steam balance
- Procurement engineering: Specification,   evaluation and documentation
- Technical meeting and clarification with Client,   Class and Supplier
- Construction engineering : Commissioning,   Mooring/Sea trials
- As-built drawing and documentation for Vessel   delivery
 
Marine piping engineer in Engine room piping   design department for Commercial ship (January 1990 to April 1994)
- Routing of piping, cabling, traffic in engine   room
- Composite installation arrangement of machinery   and piping
- Manufacturing drawing of piping and support
- Material control and procurement of piping
- Piping practice control and development
- Technical clarification with Client, Class and   Supplier
- Construction support
 
 

Conducted Projects

Jun.   2012 –
Dec.   29, 2019
 
H2418/21~34 Yamal   172,600m Arc7 Ice Breaking LNG Carrier 
Client: Sovcomflot /   Teekay / Mitsui / O.S.K. Line Ltd. / Dynagas Ltd.
Role: Project   Engineering Leader
Amount: US $4.65   Billion
  
Sep.   5, 2014 –
May   31, 2019
 
H2441~46 BP Shipping 173,400m LNG   Carrier
Client: BP Shipping   Ltd.
Role: Part Leader
Amount: US $ 1.25   Billion
  
Nov   14, 2014 –
May   31, 2018
 
H4302~12 MAERSK Line   19,630 TEU Containership
Client: MAERSK Line
Role: Project   engineering leader
Amount: US $1.8   Billion
 
Jun. 19, 2013   –
Sep.   2017
 
H5010~18 Tsakos-Statoil   112,800 DWT Crude Oil Tanker
Client: Tsakos Energy   Navigation Ltd.
Role: Part leader
Amount: US $463   Million
 
Aug. 2012 –
Feb. 5, 2017
H4277~82, H4296~301   Olympic/Pegasus 10,600 TEU Containership 
Client: Mediterranean   Shipping Company S.A. (MSC)
Role: Project   engineering leader
Amount: US $1.8   Billion
  
Jul. 1, 2010 –  
Jun. 30, 2015
H4250~59, H4262~71   MAERSK Line 18,330 TEU Containership 
Client: MAERSK Line
Role: Project   engineering leader
Amount: US $3.82   Billion
 
Feb. 1, 2013 –
Apr. 30, 2015
H5394/95/98/99 Scorpio   114,900 DWT Product Carrier
Client: Scorpio   Tankers Inc.
Role: Project engineering   leader
Amount: US $194   Million
 
Nov. 2007 –
Sep. 2013
Standard shipbuilding   specifications for a vessel machinery space 
Role: Development   and management of technology standards
 
May 23, 2008 –
Nov. 13, 2011
H1198/208 TCC 180,000 DWT Bulk Carrier
Client: Tai Chong   Cheang Steamship Co., Ltd. (Hong Kong)
Role: Project   engineering leader
Amount: US $180   Million
 
May 22, 2009 –  
Sep. 30, 2011
H3303/04 RWEI Wind   Turbine Installation Vessel
Client: RWE Innogy   GmbH
Role: Part leader
Amount: US $240   Million
 
Jun. 2006 –
Jul. 2008
H5902 Agbami FPSO Hull
Client: Star Deep   Water Petroleum Ltd. (Chevron Texaco)
Role: Marine   Machinery and System Engineering
Amount: US   $1.1Billion
  

Award

Dec.   6, 20122012 Korea Technology Award (Company)   - for: development of   high-efficiency eco-friendly container vessel
Prime Minister / Ministry of Public   Administration and Security

Nov.4,   20112014 IR52 Jang Young-shil Award   (Individual)
Ministry of Science, ICT and Future   Planning

Nov.4,   20112014 IR52 Jang Young-shil Award   (Company)
Ministry of Science, ICT and Future   Planning

*******

View Contact Information