Objective
Associate with a progressive firm, to insure growth and advancement of skills, technically, professionally and managerially.
Willing to undertake assignments, both domestically and internationally.
Experience
EMPLOYMENT HISTORY
Prosafe Productions Services October 2007 – July 2009
Project Interface Engineer / Site Representative
Interface between Prosafe (owner and operator) and Shipyard’s engineering, repairs and conversion departments
for all disciplines including budget control for the FPSO (Floating Production, Storage and Offloading) conversion
for Apache Energy - Perth Australia.
Site Representative for all Module fabrication and interface with Production, Operation Divisions, Client during fabrication including Topside Installation, Hook up Module to Module and Miscellaneous Associated Systems.
Location: Norway, Philippines and Singapore.
Anglo Coal –Lake Lindsay Coal Mine Project (Open Cut Mine) July 2007-September 2007
Project Engineer (2 Months Assignment)
Consultant for the Operational Readiness Study for a new coal mine (open cut) in central Queensland and
responsible for provision of services for the initial auditing, discovery and reviewing phase of the project, to
summerise the key criteria in an operation readiness checklist that must be met and to highlight gaps to
assist the client to formulate plans to rectify and integrate into the next phase of preparation for commissioning
and handover.
Location –Queensland Australia
Construction Superintendent – (Company Representative) January 2007 to June 2007
Sub-sea Pipeline installation c/w with Tie-in, Platform Top sides Modification/Upgrade and commissioning.
i. Star Energy
ii. CNOOC
Location Natuna Sea and South China Sea.
Talisman Energy Inc. April 2001 to January 2007
Technical Services & Construction Superintendent –Projects
New Development for Onshore Gas facilities c/w with all associated systems, Process equipment and construction including Piping, Machinery, Structural, Electrical, Instruments and Civil Disciplines. Other duties include, Facilities and operational improvement for existing equipment and piping systems, development of new well sites, civil works, water flood systems, gas compression and etc. Work force and Liaison with Operations, Production, Drilling , Engineering, Purchasing and Administration Departments.
Location: Indonesia-South Sumatra
Exxon-Mobil Oil Indonesia. Inc. May 2000 to April 2001
Facilities Engineer (Onshore/Offshore facilities)
Seconded to Exxon-Mobil Oil. Duties Include; upgrading and expansion development for their Onshore and Offshore facilities, including Structures, Piping Installation, Drilling Facilities (Onshore), Mechanical equipment and associated systems , Process equipment and systems. Overall field coordination and liaison with office base Project Coordinator.
Location : Indonesia- North Sumatra.
Zadco (Zakum Development Company) January 1999 to May 2000
Construction & Facilities Surveyor
Seconded to Zadco (Zakum Development Company) 2 month short term assignment to carry out Phase-2 upgrading and modification for structural , mechanical, piping and instrumentation systems – Onshore facilities Zirku Island . Other associated work included the safety and fire & gas detection and protection systems.
I) Zirku Plant process facilities ii) Stah plant H2S process Facilities
Location : Abu Dhabi- UAE.
Zadco (Zakum Development Company)
Offshore / Onshore Surveyor
Seconded to Zadco - UAE (Zakum Development Company) to identify the Upgrading and Modifications and repairs for their existing offshore and onshore Facilities.
i ) Formulation of Scope of Work for all engineering disciplines, such as, Steel Renewal / Repairs, Machinery, Electrical, Instrumentation, Piping, Process Systems and New Equipment.
ii) Fire and Gas protection and equipment functional test.
iii) SBM refurbishment:
iv) Safety Audit and Operations Zakum Field .
v) Fire and Gas Protection and Equipment Surveys and Recommendations.
vi) Piping and Structural Surveys and Recommendations
vii) Electrical and Instrumentation Surveys and Recommendations.
viii) Life saving and Fire fighting Surveys and Recommendations.
ix) Helideck Timber Surveys and Recommendations
Location: UAE (United Arab Emirates) – Abu Dhabi
Conoco Indonesia Inc. January 1998 to January 1999
Project Engineer/Coordinator
Seconded to Conoco Indonesia Inc. for the Upgrading and Modifications of the following Project Assignments (as Consultant).
FPSO ( Floating Production Off loading and Storage Vessel) Repairs and Modifications, Steel Renewal / Repairs, Machinery, Electrical, Piping, Instrumentation, Process Systems, New Equipment Installations, Pressure vessel Repairs and re-certification, Removal and Reinstallation of Mooring Systems, Removal and Reinstallation of Production Risers from Sub Sea Well heads to Manifolds complete with Commissioning.
Technical Evaluation of Bidders Capability and Site Visits.
Project Coordination, Planning, Engineering, Design, and Procedure Implementations with the NSOS Team. (Natuna Sea Offshore Support).
Response to all Technical Clarifications raised by the Bidders.
Offshore Production Platforms, Modifications and Up-Grading Program.
Coordination, Planning, Engineering, Design, and Procedure Implementations with the Engineering, construction, Production and Operations Divisions.
Recommendation and liaison with Vendors, Oil and Gas Contractors.
Manage and Detail Engineering Personnel.
Formulation of Scope of Work and Specifications for Bid - Tendering
Overall Project Coordination covering all duties as outlined below in Previous Employment.
Location: Indonesia
EngPac Pty Ltd. September 1996 – January 1998
Project and Construction Manager
Independent Coordination / Consultant for the following services; Oil & Gas, Industrial, Construction, Mechanical, Electrical, Instrument, Coal Mining Development, Marine Construction, Marine Supporting Vessels for Offshore Projects and Operations, EPC Projects, Project Management, Assist in Sourcing for Project Funding, Certification and Consulting.
Other Projects
i) Third Party Independent Surveys and Inspections for Oil and Gas and the Marine Industry.
ii) Field Service Representative (Company Authorized Representative - CAR) for Oil and Gas and Marine Industries.
iii) Project-Tender Bid Package for Sarawak Shell for the Fabrication and Erection of M1PQ-A (4 - Leg) Jacket, Pin Piles, Caissons (including Piping, Instrumentation and Electrical Systems) and all Appurtenances. Jacket – 183 meters at 18,000 tons.
Location: Vietnam, Thailand, Malaysia, Philippines and Singapore.
iv.) Seconded to Thiess Contractors to carry out a Due Diligence Condition Survey for 6 Coal Processing
facilities, which included all Steel Structures, Machinery, Piping and other general maintenance and
operational support back up. Survey included highlighting issues related to refurbishment of Equipment
and Structures etc., where necessary and make recommendations. Spare Parts, Ware Housing facilities
and the laboratory facilities were also included in the Condition
Survey. Location: Indonesia ( Senakin and Satui)
v.) Bid Preparations for Yamamitzu ( Japanese and Indonesian Joint Venture) Project. Expand Sumatra
Offshore and Onshore Facilities (Team of 8 Professionals)
i) Marine Terminal Operations and Maintenance
a) Operations Services. b) Logistics Services , c) Catering services
ii) Offshore support Vessels (Anchor Handling Tugs and Utility Vessels)
iii) Offshore Work
a) FSO Modifications. b) SPM Refurbishment, c) Installation of SPM & FSO
Location : Singapore
vi.) Bid Preparation For Hanwa/Daewoo (Korean and Indonesian Joint Venture) Project: Caltex Indonesia –
Steam Stimulation. (Team of 4 Professionals)
i) Built, Operate and Maintenance Services (3 years)
ii) Procurement of Metering Skids and Materials
Location : Indonesia
Tille Shipyards January 1995 - August 1996
Project Manager / Commissioning & Guarantee Engineer for a Water Injection Dredger
Duties Include: Project Manager Functions during the Construction Phase and Commissioning of all equipment and Systems installed on board. Guarantee Engineer Upon Completion and Delivery of Vessel.
Owners/Client : Ham Dredging / PT. Penkonindo.
Location: Holland, Singapore, Indonesia.
Atlantic Richfield Indonesia Inc. (ARCO) June 1993 – January 1995
Field Engineer.
Up-Grading and Modifications on numerous Offshore Platform Facilities. Overall Coordination for all Engineering Disciplines. Client: Atlantic Richfield Indonesia Inc. (ARCO)
Location: Indonesia.
Atlantic Richfield Inc.
Bali North Pagerungan Gas Project.
Commissioning Engineering Coordinator.
Overall Coordination for all Engineering Disciplines, for the Functional Check-Out, prior to the Overall Commissioning of the Gas processing Facilities. Other duties included: Verification of all pressure vessels internals and design against As-Builds. Walk through Mechanical Completion versus Flow sheets and Signed Off (Acceptance) all Functional - Test Sheets for the Electrical, Instruments, Mechanical, and all Associated systems and Equipment.
Location: Indonesia.
UNOCAL Indonesia Inc. November 1990 - May 1993
Fabrication Yard Consultant/Field Engineer /C.A.R.
Constructed, Installed and Commissioned Two 4 Pile, Twenty Well Slots, Oil and Gas Production Platforms c/w all associated equipment and systems and the construction of Jackets and Piles. Up-graded and Modified numerous Offshore Platform Facilities and Repaired numerous existing Sub-Sea Pipelines. Installation of Sub-Sea Pipe - Lines, Risers, Electrical Power Cables and Well head Umbilical Controls complete with Hook-up and commissioning .
Location: Indonesia.
Transport Pipe-Line Marine Services June 1990 - November 1990
(Marine Division)
Independent Consultant / Surveyor
Seconded to various Oil and Gas Companies as an Independent Consultant and Company Representative
for the Construction of Marine Vessels and Offshore Facilities.
Dry Docking and Upgrading for ULCC & VLCC, (Tankers) Pipe Lay/Construction Barges, etc.
Satmarindo Group June 1986 - June 1990
Engineering Superintendent/Fleet Manager/Offshore/Onshore Project Coordinator.
Company Fleet Manager for Marine offshore support Vessels for Offshore Work Over Barges, Offshore Construction/.Pipelay and Heavy Lift Barges. Project Coordinator for numerous offshore on shore projects.
Combustion Engineering (O.P.S. Division) June 1985 - June 1986
(Offshore Production Systems) QA/QC Superintendent
Seconded to Conoco for the building of the FPSO, Installation of equipment ,all associated process and piping
Systems. Commissioning and site installation.
Arabian Marine Co. Ltd. June 1983 - June 1985
Engineering Superintendent :
Seconded to Aramco for numerous offshore platform upgrades and sub sea pipe line installations c/w hook up
from well head to platform top sides.
Kenton Marine Pty. Ltd September 1980 -June 1983
Surveyor – Engineer
Seconded to Brunei Shell for the re-vamp and upgrade of two Construction Barges, Drilling Tender Barge and numerous Offshore Installations.
Seconded to Bougues Offshore for Upgrade Pipelay / Construction Barge including a 800 S.Ton Heavy Lift Revolving Crane Installation.
Construction for numerous ocean going vessels, tugs, Supply Vessels, Tankers, Offshore Structures, and Pipelay Barges c/w Heavy Lift Cranes etc.
Dry Docking & Upgrading for ULCC & VLCC, (Tankers) Pipe lay/Construction Barges, etc.
Vosper Thornycroft Pty. Ltd. January 1971 -August 1980
Service Engineer / Guarantee Engineer:
Ship Building, Repairs, Upgrading and Engineering.
Seconded to owners country and carried out Guarantee Functions
General Note:
Previous experience also includes a “Traditional” Shipyard Apprenticeship and seagoing experience before proceeding ashore to pursue a career in the various Management functions outlined above.
Education
High School Graduate. Bachelor of Science (Engineering).
First Class Certificate of Competency. Naval Architecture Certificate.
Heavy Duty Diesel Mechanics. Apprenticeship Certificate. (Ship
Building/Repairing & Engineering)
Certification
Skils
TYPES OF PROJECTS and KEY SKILLS
Fabrication of Process Modules and all appurtenances.
Interface Engineering for FPSO Conversion all disciplines.
Operational Readiness Study for a new coal mine (open cut) to rectify and integrate into
the next phase of preparation for commissioning and handover.
New Development for Onshore Gas facilities c/w with all associated systems, and equipment and engineering disciplines.
Projects: Upgrading, Repairs, Expansion for Oil and Gas Facilities Onshore/Offshore.
Survey and Recommendation for Repairs Onshore and Offshore Oil and Gas Facilities including Mechanical, Structures, Piping, Instrumentation, Fire Detection and Protection systems, Pressure Vessels, etc.
Condition Survey for 6 Coal processing facilities (Structural & Mechanical)
Upgrading and Modification for Offshore and Onshore Facilities & Associated equipment and process systems. FPSO Repairs and Modification; Steel, Machinery, Piping, and Instrumentation.
Independent Coordination/Consultant for numerous Projects with Various Oil Gas Companies and Contractors and other Industries.
Project Coordination for numerous Offshore & Onshore, Projects and Petrochemical Industries, Factories, Refineries and miscellaneous Industrial Development.
Construction and Commissioning - Water Injection Dredge (W.I.D.)
Third Party Independent Surveys & Inspections - Oil & Gas and Marine Industries.
Commissioning Onshore Gas Plant.
Construction of Offshore Platforms, c/w Jackets, Piles, Decks, Process Systems and other Associated Equipment.
Offshore Platform Facilities – Upgrades - c/w Offshore Pipeline Installations & Hook-up to Top-side Facilities and Sub-Sea Well-heads Sub-sea Oil Well Commissioning.
Preventative Maintenance Programs.
Floating Production Storage & Off loading Vessels (F.P.S.O.)
Managed & Detailed Engineering Personnel. -Offshore & Onshore.
Operations and Construction Coordination Project Bidding including Establishing contacts with Vendors for procurement and Quotations etc.
Dry Docking Coordinator (VLCC, FPSO, FSO, Tankers, Cargo Tugs, Barges). Degassing engineer prior to tanker dry dock repair. Ship Building and Repairing.
Barge Crane Load Test Certification.