Objective


Goltens are committed to being the prefered Global Service Provider in marine offshore and onshore induatries.


Experience


OFF-SHORE WORK EXPERIENCED



GOLTENS CO. LTD DUBAI BRANCH September 24, 2007- 2010

Dry dock World Al Jaddaf

P.O. Box 2811, Dubai U.A.E



Position : Diesel Engine Mechanic

Department : Diesel Engine 331 Depart.



Job Descriptions:



Chris-Marine Spindles Grinder, grinding all kinds of spindles for 4 stroke engine like Deutz, Mak, Pielstick, Yanmar, Wartsila, Hyundai, & Caterpillar.

? Dye check valve spindle, checking for crack, corroded parts and damaged area.

Cylinder Head and Cylinder Liner, Cleaning and dye check the surface of the cylinder head and checking the landing of the Cylinder head and Cylinder Liners may have crack or damaged part.

? Valve Cages, dye check for corroded parts, leaks, damage valve seat face and valve and valve guide round-

Out.

? Checking the Height and limit wear of the valve spring.

? Calibrate of Cylinder head, Cylinder liner, Valve guide clearance and limit wear that recommended by the

Manufacturer.

? Hydro-Testing of Cylinder head, Valve Cages for leaks and cracks.

? Specialized in Honing of Cylinder Liner.

? Assisting the turbocharger department to disassemble and assemble of turbocharger and checking the

compressor clearances.

? Cleaning, dye check, and also calibrate piston shirts clearance and clearance of piston ring groves

? Recondition of Cylinder head, Cylinder liner, Piston, Valve cages, Valve spindles, Roller bushing and damaged pins, Rocker arms bushing change new.

? Fitting of connecting rod new bearing, then calibrate for clearances.

? Engine block, crankshaft upper, lower bearing cap clean and dye check locate if any crack.

Refitting of lower bearing cap to the upper bearing with new bearing fitted and also crankshaft already fitted in the engine block. Check for contact to the crank pin. And

Start tightening by torque wrench and last is angle.

? Recondition and Repair Anchor winch gearbox replacing new bearing.

? And reconditioning all kinds of Engine to Auxiliary Engine.

? Calibration of Piston Ring groves, shirts, pins groves.

? Working in MV Vasco Da Gama Vessel a dredger ship, we assist all the engine crew. To repair a lube oil pipeline, water pump remove and replace new bushing and Seals.

? Dismantle and Clean Rocker Arm, Calibrated, then assembled for delivery.

? Blue Fitting of Counter weight to the Crankshaft landing of counter weight. If have both contact to

The counter weight landing and crankshaft. Then final torque it in 800 Nm. It depends in the Manufacturer

of the Engine and also we depend by the manufacturer Manual.

? Chris-Marine ( Valve Spindle Grinder)

Malmo Sweden

Type: BSP3

No : 648 / 605

Data: 3PH2 220 / 240V 50-60 Hz



Job Description:



? Grinding of Valve Spindle Face an Angle of 30 deg. (intake valve) – 45 deg. (Exhaust valve).



MV Napoleon onboard.



? Deutz Auxiliary Engine, checking of Deflection of crankpin & web

Clearance of both sides using special Gauge Deflection.

?Adjusting of clearance of rocker arm tappet.

? Check and re-fill turbocharger oil and re-filling of Lube oil in Oil sump.

? Cleaning and checking of secondary filter.

? Checking of Cooler water flow, Sea Water, Fresh Water, Lube oil pressure

Exhaust temperature, main bearing crankpin running to 5, 30, 1 hrs testing.

? Checking of Main Bearing and Crankpin Temperature using Laser Temperature Device.

To check the temperature to 5,30,1 hours running.

? Checking all parts of the Auxiliary Engine for leakage from top to bottom, line of fuel,

Flow of water thru cooling manifold to cooler.



HONING SPECIALIST



Chris-Marine (Honing Machine for Cylinder Liner)

Type : HON

Data : 6 – 9 Bar

Speed UB : 34 rpm

Speed UB-E : 24 rpm



Job Description:

? Honing the Cylinder Liner, then the Standard roughness given by the

Manufacturer that built the Engine. And it depend of the manufacturer how much

The degrees or angle of the crosshatch to the liner.

? Honing of Cylinder Liner to reduce the Ovality of the Cylinder Liner and make good

Lubrication to the piston ring.



Chris- Marine

Valve Seat Grinder (VSG) type: Pneumatic

? Grinding the Old valve seat, then check the contact of width of the

Spindle face to valve seat face.



COOLER & HEAT EXCHANGER

? Dismantle of Lube oil Cooler and Fresh water cooler for Recondition and repair.

? Hand taps all thread of the cooler.





TWAIK COMPANY LTD. March 2005 – March 2007

P.O Box 461 Saihat 31972

Dammam, Kingdom of Saudi Arab (K.S.A)

Position : Hydraulic Mechanic



Job Description:

? Preventive maintenance, repair, replace defective parts of hydraulic cylinder, and hydraulic pumps

? All heavy equipment must be check properly after going to the working site

? All defective parts of cylinder much be replace in complete kits of oil seal and

Check the cylinder shaft for groves or damage.

? Monthly checking of lifting cylinder, refuse cylinder, swing cylinder hydraulic pumps, Vain pump, Power

take Off (P.T.O) shaft. Hydraulic vacuum motor pump, gear box

? Transfer to Jubail Royal Commission, as a Hydraulic Mechanic for their heavy equipments and compactor

With hydraulic system

? All Vehicles of Jubail Royal Commission to UD Nissan Diesel, Mercedes Benz (Dump Truck), Scania Compactor

waster truck, Mitsubishi Compactor waste truck, Bobcat/ Thomas (Uni – loader), Man Diesel, Water

Tanker w/ pressurized water used for cleaning all heavy equipment in Land fill working area.

? Heavy equipment’s to (3) Kawasaki loader, (2) Bomag Dozer, (2) Caterpillar Dozer, (2) John Deere.

? Caterpillar Dozer, remove hydraulic supply findings have leaks. Remove and Clean for repair, and change

new hydraulic hose.

? Bomag Dozer, main hydraulic pump leakage, removes and opens for repair.

? Bomag Dozer needs to change new complete oil seal, O- ring.



QATAR NATIONAL CEMENT COMPANY June 2002 – June 2004

Ummbab P.O. Box 1333 Doha, State of Qatar

2000 TPD Commissned by M/s FCB

Groupe – Five Lille, France

Position : Senior Lubricator



Job description:

VERTICAL RAW MILL SECTION:

? Checking oil level of the Main gear box, Auxiliary gear box, Hydraulic oil tank of the triple flap valve.

? Greasing the triple flap bearing, check all the grease level of the centralize Grease pump.

? Greasing every day the Dynamic Separator bottom bearing, Top bearing, an Axial bearing.

? Greasing the Bucket elevator bearing, Damper bearing, Chain , by- bearing, Roller kilns traveling device and

pinion.



PRE- HEATER SECTION:

? Greasing Damper bearing, Bag filter fan bearing, Screw conveyor, Chain Conveyor, Electrostatic Preceptor

(E.P), Hammering system bearing, Rotary bearing

? Greasing the Cross rod of the Rotary Kiln and checking the oil level of the Air path filter.

? Checking the oil level of the hydraulic cylinder, Distribution gate gear box and



ROTARY KILN SECTION:

? Checking every day the Rotary kiln supporting roller bearing oil level, Hydraulic Thrust bearing, Main reducer

Auxiliary reducer, and Gerth gear oil level.

? Putting special grease in the Downstream seal (Pulley, wearing segment, Cable Path)

? Greasing the baggle, jack, and slide by special grease.

? Greasing the Gypsum Crusher (Apron Feeder) bearing.

? Change oil Air path filter oil tank vacuum blower, gear box.



GIRTH COOLER SECTION

? Checking all the fans and checking all the temperature, then put grease.

? Checking the temperature hydraulic oil levels , and greasing hydraulic cylinder Grease pins.

? Checking the Electrostatic Preceptor (E.P) Screw conveyor gear box No.1 and No. 2

? Greasing the hydraulic cylinder of Bag filter and checking the oil level.

? All small to big motor fans checking all the temperature and vibration.

? Greasing (E.P) Hammering system bearing (Only for Shut Down).



CLINKER SILO NO.1 & NO.2 SECTION:

? Checking the centralized grease pump and the Bucket conveyor and bearing.

? Checking and greasing the fan blower and bag filter.

? Checking the temperature of fan blower and the put grease.



BALL MILL SECTION:

? Greasing the Upstream bearing Seal, Downstream bearing Seal, Water spray System bearings.

? Check oil level and pressure of the hydraulic tank, Upstream and oil tank Downstream, Main gear box and

Auxiliary gear box.

? Greasing the Weigh feeder roller bearing the Separator flap valve bearing, Vibration Screen bearing.

? Greasing Cement Silo No.1 & NO. 2 Air vents bearing.



PACKING PLANT SECTION:

? Greasing the (2) Bucket elevators (Ground floor) and greasing all parts of the Gear box.

? Greasing all bearing of the Belt conveyor, Chain, to loading machine bearings.

? Checking the oil level of (4) hydraulic tanks.

? Greasing the (2) Packing Machine, Checking all gear box and Hydraulic Lubricator.

? Greasing and checking the Up side bucket elevator oil level, and check the Motor belt.



SEA WORK EXPERIENCED



M/V Sarangani Bay – I January 2001 – April 2002

Gross Tonnage: 2,833.77

Hp (Kw) : 2,088



OCEANIC CONTAINER LINES, INC.

511 H. Lopez, Balut Tondo, Manila. Philippines

Route: Manila – Davao – Manila. Philippines

Type of Ship: Container Ship

Position : Oiler

Duties and Responsibilities:



Duty for Forenoon watch: 0800 to 1200 am – pm:

? Before taking the watch or turn over the watch. Check the temperature by sight and by feel all

machinery onboard the ship. Checking all the machineries for 15 minutes after taking or turn over the

watch.

? Check the fuel oil and lubrication oil tanks and check the starting Air tank.

? Feel the accessible parts of the oiling system

? Monitored the operation of all machinery in the engine room at all times, and pay attention to the

abnormal sound, and vibration.

? While in Port in North Harbor R-2, Engine Warm –up before starting to continue for voyage.

? Check the turbocharger temperature, Air filter, Main Engine exhaust Temperature, cooling water jacket

temperature.

? Check and monitored the Main engine R.P.M temperature, oil, water, Air Pressure, level of expansion

tank, settling tank and Tween tank.

? Check Air pressure in the Air starting tank No.1 and No.2 and lube oil sounding on the auxiliary engine

crankcase.

? We repair injection system and re-conditioning cylinder heads, repairing & cleaning the turbocharger.

? We do preventive maintenance, repair, replace defective parts adjust engine component.

? While on Port, we start No. 1 auxiliary generator for re-calibration of fuel injector.



SEA WORK EXPERIENCED



M/V North Bay – I Nov. 2000 – Dec. 2000



OCEANIC CONTAINER LINES, INC.

511 H. Lopez, Blvd, Balut Tondo, Manila. Philippines

Route: Manila – Davao – Manila. Philippines

Type of Ship : Container Ship

Position : Senior Oiler



M/V North Bay – I

Dry Dock in Keppel Shipyard, Inc.

Bauan, Batangas City. For (2) Months



Duties and Responsibilities:

? All crew are busy checking all the machinery onboard ship.

? Checking the (2) auxiliary generator all injector for re-calibration, checking Battery for starting the Main

engine or power generator.

? Checking the injection pump fuel supply and oil supply and radiator cooling water



? All valve checking and removing all rust found need to replace new valve.

? Main engine, change new engine we found that that the crankshaft is not in balance. Cylinder heads

pistons w. connecting rods, cylinder liner remove. Injection system assembly, rocker arm assembly,

Crankshaft bearing, Camshaft Bearing, Thrust bearing remove from the shaft, and intake and exhaust

Valve assembly.

? Overhauling of the Main engine by removing all the main parts of the engine.

? Start water pump remove the water from the Main Engine.

? Old purifier damage due too old and also covered w/ rust.

? Remove all valve replace new.



SEA WORK EXPERIENCED



M/V PREMIER – I April 2000 – August 2000

Gross Tonnage: 1.340

Hp (Kw) : 1.450



PREMIER SHIPPING LINES, INC.

Address : 109 A. Bonifacio St. Cebu City. Philippines

Route : Any point of Luzon, Visayas, and Mindanao. Philippines

Type of Ship : General Cargo Ship

Position : Oiler



Duties and Responsibilities:

Duty on watch: 0400 – 0800 am – pm:

? After taking or turn over the watch, much be check all the machinery onboard ship.

? 15 minutes checking all the machinery onboard ship. Checking the (2) Auxiliary Generator sump oil

level, cooling water of radiator, marine diesel fuel level, Main engine parts to Turbocharger oil level and

temperature.

? Air starting motor, checking the (2) Air tank (1) Supply Air Tank for starting the main engine.

? Take Engine warm – up before starting to continue for voyage.

? Loading of provision for 1 or 2 months voyage to any point of Luzon, Visayas, and Mindanao, and

Loading of drinking water onboard ship.

? After ending the watch, checking the R.P.M of the Main engine, Temperature of Turbo0charger oil

level, cooling water manifold temperature, exhaust Manifold temperature, Air pressure of Air tanks,

leakage of the body the Main engine, Auxiliary generator sump oil level, cooling water radiator,

Marine diesel fuel level, Storage tank, Settling tank, Tween tank.

? Ship stop for emergency repair of Windlass gear damage, and has to be replace new.

? Crane No.1 removed gear and chain replace new.

? Main engine stop, due to overheat of cooling manifold, stop in the center of the sea.

? Stop in Cebu city port for replacing the discharging pump due to short circuit.

? Remove piston No3 for changing new piston rings, piston ring leaking (Blow-by).

? Stop in Port of Mariveles, Bataan City for loading for Soya beans and start cleaning Main engine.

? Cleaning the 1st and Secondary fuel filter, re-calibrate the injector of Auxiliary Generator No.1.



OFFSHORE WORK EXPERIENCED



INDOPHIL TEXTILE MILLS, INC. April 1993 – April 1995

INDOPHIL POWER PLANT DEPARTMENT

Lambakin, Marilao, Bulacan. Philippines



Type of Engine : WARTSILA Vasa 18V32, V – TYPE Engine



Position : Assistant Mechanic

Duties and Responsibilities:

? Maintain the cleanliness of the entire Power Plant’s Area and Engine Room.

? The Mechanical Maintenance, remove the Disc inside the Alpha Laval Purifier.

? Help clean the disc and bowl cover of Alpha Laval purifier.

? Overhauling and cleaning all parts of the Alpha Laval purifier.

? Overhauling No. 1 Engine for repair, change oil change new parts.

a) Removing the cylinder heads by using special hydraulic tools, for removing the cylinder head bolt.

b) Removing rocker arms assembly, piston w/ connecting rods to cylinder bore for checking and

cleaning.

c) Remove the Intake and Exhaust valve for re- grind.

d) Remove the fuel injector for re-calibrate.

e) Remove connecting rods bearing cap to replace new cap bearing.

f) Cleaning & change the fuel filter cartridges regularly. And cleaning the centrifugal filter.

? Checking the oil level of the Turbocharger and temperature, cooling water Temperature.

? Cleaning the Water – Tube boiler by removing all burn carbons inside the boiler.

? Multi-task worker by Land or Sea.


Education


? Bachelor of Science in Marine Engineering March 25, 2000

Philippine Merchant Marine School (Manila Branch

Course : B. S. MARINE ENGINEERING



? Basic Seaman Training Course (BSTC) April 16, 1993

Dr. Yanga’s Francisco Balagtas College, Bocaue, Bulacan, Phils.

Course : Messman



? Computer System Operation (CSO) March 18,1992

AMA Computer Learning Center (Caloocan Branch)

Course : Computer Secretarial Operation


Certification


EUROLINK SAFETY SERVICES June 1, 2009

P.O Box 60767, Dubai United Arabs Emirates U.A.E

Course: Rigging, Lifting and Slinging (BANKSMAN COURSE)



PHILIPPINE SEAFARERS TRAINING CENTER (PSTC) June 19, 2004

938 Arlegue St. cor Aguila St. Quiapo, Manila. Philippines

course: Proficiency in Survival Craft and Rescue Boat (PSC-RB)



PHILIPPINE SEAFARERS TRAINING CENTER (PSTC) May 09, 2001

938 Arlegue St. cor. Aguila St. Quiapo, Manila. Philippines

Course: Prevention of Alcohol & Drugs Abuse in the Maritime

Sector (PADAMS)



PHILIPPINE SEAFARERS TRAINING CENTER (PSTC) May 03, 2001

938 Arlegue St. cor. Aguila St. Quiapo, Manila. Philippines

Course: MARPOL 73/ 78 ANNEX I



PHILIPPINE NAUTICAL TRAINING INSTITUTE (PNTI) May 13, 2000

4th floor Isabel Bldg. 370 Espana St. Sampaloc, Manila. Philippines

Course: BASIC SAFETY COURSE (Solas Course)



Personal Survival Techniques

Fire Prevention and Firefighting

Elementary Safety and Social Responsibilities (PSSR)



PHILIPPINE SEAFARERS TRAINING CENTER (PSTC) August 22, 2000

938 Arlegue St.cor. Aguila St. Quiapo, Manila. Philippines

Course: Ratings Forming Parts of Engineering Watch keeping (E.W.K)


Skils


In Goltens Co. my work is calibration of parts of Diesel Engines.Chris-Marine ( Valve Spindle Grinder)Malmo,Sweden Type:BSP3.Spindle grinding face it defend in angles.Chris-Marine Honing machine: Honing the Cylinder Liner, then the Standard roughness given by the

Manufacturer that built the Engine. And it depend of the manufacturer how much

The degrees or angle of the crosshatch to the liner.

3)Chris- Marine

Valve Seat Grinder (VSG) type: Pneumatic

Job description:



? Grinding the Old valve seat, then check the contact of width of the

Spindle face to valve seat face.

HYDRAULIC MECHANIC:

Job description:

? Preventive maintenance, repair, replace defective parts of hydraulic cylinder, and hydraulic pumps

? All heavy equipment must be check properly after going to the working site

? All defective parts of cylinder much be replace in complete kits of oil seal and

Check the cylinder shaft for groves or damage.


 

Manila, Manila,