Objective
To be an engineering protagonist for the successful technical field and broaden my scope for the successful enterprise notwithstanding for the community development at large
Experience
Dec 2007 – To date:
PRIMEFUELS KENYA LTD
Position: Fleet Systems Engineer
Responsibilities:
- Fleet tracking and management. { using Blue Trax software and FM Locator }
- Generating exceptional reports to check on driving violations i.e. over speeding, night driving, harsh acceleration, harsh braking, over revving and checking on No go zones.
- Handling fuel management and conducting fleet usage rate analyses
- Support and configuration of GPS based Automatic Vehicle location (AVL) devices.
- Analysis and development of trip/journey plans to simplify and improve fleet processes.
- Determining performance standards through induction and training of drivers.
Sep 2007:
MULTIPLE HAULIERS (E.A) LTD
Position: (Trainee)
Responsibilities:
- Networking, Hardware & Software installations and maintenance
- Fleet tracking using the VDO Fleet manager system using GPS and GPRS/GSM
May 2006– April 2007:
Total Kenya Limited
I.Total – kenGen Power Plant
Position: Depot assistant
Responsibilities:
- Handling receipts of LS/AGO (off-loading operation)
- Handling supplies to KenGen (AGGREKO facilities)
- Managing fuel stock levels
- Liaising with the Head off. on the progress of operations
II.LPG Plant
Responsibilities:
- Operating the carousel machine
- Cylinder inspection
- Off-loading of bulk LPG
III.Bitumen Plant
Responsibilities:
- Preparation of bitumen (Cutbacks and Emulsions)
- Managing bitumen product stocks using SAP system
IV.Head office
I.T Department
Responsibilities:
- Fleet tracking using the VDO Fleet manager system using GPS and GPRS
- Analyze and troubleshoot technical problems for established networks.
- Install, configure and maintain network components.
- Assist personnel of other departments as a computer resource
May – July 2005:
Ministry of Roads, Public Works and Housing
I.Emali – Loitokitok Road Project
II.Processional Way Construction Project
Responsibilities:
- Staking-out of the road alignment using a Total station
- Geo-referencing of Road Control points to the main network
- Land Acquisition exercise for the affected land parcels along the road
- Plotting of the parcels and road alignment in AutoCAD for compensation work
- Acreage computations for compensation using AutoCAD
- Land surveying; traversing, preparation of field notes and survey computations
- Cartography; preparation of cadastre plans and deed plans.
- Topographic surveying for trading canters along the road
May – August 2004:
Jomo Kenyatta University of Agriculture and Technology.
Undertook training in the following fields
- Land surveying
- Topographic surveying; leveling and trigonometric heighting
- Cartography; preparation of survey plans, road profiles
- Land Information Systems
Education
May 2008 – To date:
Management Institute of Canada (MIC)
Masters of Business Administration (MBA) Distance Learning Program – Operations & Supply Chain Management
April 2002- April 2007:
Jomo Kenyatta University of Agriculture and Technology (J.K.U.A.T)
Bsc. Geospatial Engineering
2nd Class Honors (Upper division)
Jan– Jun 2002:
Strathmore University
IMIS Higher Diploma
Associate Member of the Institute
Jan – Dec 2001:
Strathmore University
IMIS Diploma
Licentiate Member of the Institute
1997 – 2000:
Kangundo High School
Kenya Certificate of Secondary Education, (K.C.S.E)
Mean grade of B (72 points)
Certification
IMIS (Istitute for the Management of Information Systems)UK
- Licentiate member of the Institute
- Assoociate member of the institute
Skils
- I.T hardware and software knowledge; networking and software configuration
- Fleet management skills; tracking, monitoring and routing of fleet