Back to Resumes List

Facilities Maintenance

Objective


A Position where I can utilize my technical skills combined with my experience to be a Facilities Maintenance

Technician.


Experience


2010 to current Jobs since leaving Lee Technologies

10/2010 to 11/2010 Mt Sinai Hospital

Temporary job performed maintenance of the facilities of the hospital.

03/2011 to 07/2011 Norfolk Southern Rail Road

Carman

Repaired freight cars in need of repair.

2009 to 2010 Lee Technologies

Facilities Resource Technician

• Respond to SCADA alarms when generated.

• Monitored 9 4000HP MTU generators when online along with fuel usage and temperature.

• Monitored 12 1260 ton York Chillers while running.

• Transferred loads from preferred to alternate and back.

• Write MOPs (Method of Procedure) for the facility.

• Checked Liebert UPS models 6500.

• Filled out reports on the condition of the facility and forwarded to the critical environment group.

2007 to 2009 Union Pacific Railroad, Omaha, Nebraska

Signal Maintainer

• Performed Monthly, Quarterly, Biannual, and Annual FRA Test

• Maintained signal system.

• Completed FRA required reports.

• Be on-call for trouble calls.

2004 to 2007 ITT Industries, Fort Irwin, California

Controls Technician

• Monitored and serviced Pyrotronix Fire control system.

• Substation maintenance of high voltage lines.

• Maintain thirteen caterpillar engines to be within +/-2% of their amplitude and frequency outputs across the complex.

• Power Plant start up, shut down, monitoring, record keeping and maintenance for

peak demand and missions.

• Facilities maintenance of Reverse Osmosis water system.

• Maintained Antennas.

2003 to 2004 Yamas Controls of Southern California, Anaheim, California

Technician

• Performed preventative maintenance and service of HVAC controls.

• Checked out and started up controls with a Niagara front end in a construction environment.

1993 to 2003 Siemens Building Technologies, Cypress, California

Service Technician

• Checked out and start up HVAC controls with Insight front end in a construction environment.

• Worked in PLC research and development group for three years.

• Tested Firmware for the new Staefa product line.

• Wrote, edited, corrected, and executed test procedures.



Continued

• Performed UL compliance testing on the new product line.

• Entered Firmware defects and procedural defects into Tracker database.

• Developed analog input board for developers to use in writing and testing code.

1989 -1993 Sencon Electronics, Bedford Park, Illinois

Test Engineering Technician

• Tested and troubleshot printed circuit boards to the component level.

• Repaired units returned from the field.



1988 to 1989 ESAB Welding Products, Chicago, Illinois

Quality Control Inspector

• Inspected all welding products for correct electrical and mechanical assembly comparing

them to blueprints.

• Tested the products for proper operation with electronic test fixtures and troubleshot and

repaired all defective products.

• Hi-pot tested transformers for internal shorts.

• Read blue prints and compared to manufactured products.


Education


1986 -1988 Devry Institute of Technology, Chicago, Illinois

Electronics Technician’s Diploma

Presidential Honor Society, GPA 3.68/4.00



1997 -2000 McHenry County College, Crystal Lake, Illinois

Over Thirty Credit Hours General Education


Certification

Skils

 

Evergreen Park, IL,
View Contact Information