Back to Resumes List

Electrician

Objective


- read and lay out electrical diagrams

-troubleshoot and check-up programmable logic control with hydraulic or pneumatic control

-troubleshoot and repair electrical process equipment

-knowledge in lay out of water treatment plant and waste water treament plant installation

-installs instrument and check process flow

-knowledge in installation of electrical equipment,fixtures and repair of devices

-operate stand by generator and assist on repair and maintenance

-assist on repair of refrigeration plant and equipment


Experience


- SWIFT FOODS INC.

- Plant Electrician

-Feb 1987-Nov. 2001

-repair electrical equipment,instrument ,fixtures,devices and apparatus of the company

-repair and troubleshoot any abnormal or reoccuring trouble on electrical related works

-electrical layout and installation of equipment

-conduct preventive maintenance on electrical equipmentinstrument ,fixtures devices and apparatus of the company

-operate standby generator in case of power failure and during warm up period

-assist in troubleshooting of refrigeration plant

-assist in troubleshooting and repair of power generating sets ,substation and switch gear



NIEGET'z TRADING

Dialysis Technician

April 2002 -Aug 2002

-refurbishing of dialysis machine

-repair and check-up of dialysis machine(electrical and electronic component)

-cleaning then test run of dialysis machine

-servicing on dilaysis center regarding machine trouble



LAN ENGINEERING SERVICES

(DIAGEO Phillipines )

Facility Electrician

Oct 2002-Aug. 2004

-repair all elelctrical facility equipment andair conditioning equipment

-preventive maintenance on all facility pumps and motor

-preventive maintenance on switchgears,substation and electrical panels

-electrical layout and installation of electrical facilty equipment

-repair electrical equipment,instrument,fixtures,devices and apparatus of the company



REEL WATER TREATMENT SERVICES (Nidec Electronics Phillipines Inc.)

Electrical Technician

-Feb 2004 -May 2004

-Supervise and lead installation in lay out of electrical for R/O water treatment plant

- work and check-up of electrical instrument and installation

-termination of all R/O water treament plant motors and pumps

-termination of electrical wirings on main and sub panels

-assist on commissioning and testing



REEL WATER TREATMENT SEVICES

(CIRTEK ELECTRONIC PHILLIPINES INC. )

Electrical Technician

June 2004-Aug 2004

-supervise and lead on electrical rehabilitation of waste water treatment

-supervise and work on electrical arrangement and repair then replacement of wiring installation

-work and check of electical and instrument installation

work on electrical plan and lay out diagram for waste water treatment plant

-assist on commsioning and testing



CHEMSTANDARD SCIENTIFIC CORP.(PEPSI COLA PHILLIPINES)

-Electrical Technician

-Sept 2004-Oct. 2004

-Supervise and lead installation and lay out e;ectrical of R/O water treatment plant

-work and check up of electrical and instrument installation

-work on termination of all R/O water treatment plant motors and pumps

-assist on commissioning and testing



SOCIEDADE MINEIRA DO CUANGO under ITM PROJECT Cuango,Lunda Norte , Angola,West Africa

INDUSTRIAL ELECTRICIAN

March 2005-June 2009

- Work on electrical layout of camp buildings and and camp electrical facilties and apparatus problem

- lay out and installation of electrical for pre treament plants ,density medium seperator plants ,Central Recovery plant and grease plant

layout and installation of power generating sets and supply line termination for every plants and camp power house

-trouble shooting,maintenace and repair of plants trouble

-preparation ,lay out of distribution line on 4 units substaion of 6.6kv transmission line with transformer installation and termination (h.t cable splicing)

-REPLACED AND INSTALLED ANTENNA ON 75 METERS HIGH MAST ANTENNA for project communication and replaced warning lights

-work on troubleshooting of GROVE crane electrical problem

-attend central recovery plant training and relieve technician

-work on installation of variable frequency drives on cyclone pump and pan feder of density medium seperator

- assemble soft starter controllers for flygt pumps

-attend weekly revision of plants then initiating lock out/tagged out procedure

-assembling of main diistribution panel,motor control center panel,and modification of control panel,also mounting ,installation ,termination and commissioning

-work on modification of old 900 kva power generating set then test run , load test then installed at plant for commsioning


Education


1997-International Correspondence School

Electronic Instrumentation and Control

1989-Dualtech Training Center

Upgrdaing on Electromechanic

1985-86-Don Bosco College -Canlubang

Electromechanics

1983-85 Southern Luzon Polytechnic college

Basic Engineering

1980-83 Southern Luzon polytechnic College

High School(secondary education )


Certification


Oct 1993 passed on board of Master Electrician



Nov. 2004 Basic Safety Training with

Personal Survival Techniques

Fire Prevention and Fire Fighting

Elementary First Aid

Personal Safety and Social Responsibility


Skils


with knowlege on trouble shooting of programmable logic control (plc) with pneumatics and hydraulics


 


with passport and seaman book

Sta. Rosa City, Laguna,
View Contact Information