Objective
• To find a challenging position to meet my competencies, capabilities, skills, education and experience.
• To apply my knowledge and skills in Electrical Engineering field.
Experience
June 26, 2007 – Dec. 31, 2008 Chief Engineer
Casino Español de Cebu, Inc.
Ranudo St., Cebu City
1) Manage and monitor the operation of the club.
2) Conduct designs, sizing, load calculations, costing and estimates in the expansion of electrical systems of the club.
3) Designs automatic / manual system controls on some equipments ( Reverse Osmosis System, Cold Breeze, Water Pumps, etc.)
4) Conduct troubleshooting and repairs of air conditioning units, mini-vertical boilers, water pumps, reverse osmosis system and some kitchen equipments.
5) Establish some counter measures to control energy costs.
6) Delegate and supervise staffs.
7) Manage Engineering Department and apply the preventive maintenance program on all machines and equipment to minimize problems and shutdowns. Recommends machines modifications if needed.
8) Coordinate and supervise outside contractors.
9) Supervise the needs during functions, events and other activities of the club.
10) Prepares and implement standard operating procedures in engineering department.
11) Evaluate performance of staffs, recommends promotion, additional training or termination.
12) Prepares employees safety procedures and makes sure that these procedures are implemented.
Oct. 20, 2004 – June 25, 2007 Maintenance Technician (Electrical) / Substation Engineer
Waterfront Airport Hotel and Casino Mactan
Airport Rd.,Pusok, Lapu-Lapu City
1) Responsible in the operation and maintenance of High Voltage Substation (69KV/13.8KV).
2) Conduct load calculations, sizing and designs, costing and estimates of electrical projects of the hotel and submit it to chief engineer.
3) Conduct repairs and maintenance on boiler systems, refrigeration and airconditioning units, control panels and modules, sewage treatment plant equipments (pumps and controls).
4) Designs, repairs and maintenance of motor controllers.
5) Conduct periodic equipment check, install, calibrate and effect appropriate and proper adjustments and replacements.
6) Provide feedback, prepare accurate reports, updates records and coordinate with departments and suppliers with the objective of achieving operational efficiency by providing support in ensuring immediate, cost-effective and on-time delivery of services related to maintenance procedures on electrical equipment and facilities in accordance with established guidelines, standards and procedures of the hotel.
7) Perform electrical related tasks to address the electrical requirements of special projects and other engineering jobs.
8) Provide support in rendering technical and administrative services in any given area of engineering shift operations.
9) Take prompt corrective, control and safety measures and observe appropriate procedures of hotel operations to achieve customer satisfaction.
10) Assist guest requests and complaints.
.
May 16, 2002 – Oct. 25, 2003 Maitenance Crew
Maintenance staff 2 (promoted)
Maintenance In-Charge (promoted)
Yamashin Cebu Filter Manufacturing Corporation
MEPZ 2, Lapu-Lapu City
1) Responsible for the operation and maintenance of company building facilities ( generators, screw type air compressors, water pumps ).
2) Implements and conducts repairs, predictive and preventive maintenance activity on electro-pneumatics and electro-mechanical machineries and equipment.
3) Executes fabrications and overhauling requirements of machineries essential to production.
4) Responsible in updating machine history records, machine installation, machine preventive maintenance program and checksheets, inventory of engineering stocks, and cares existing ISO documents.
5) Delegates and supervises staffs.
6) Manage and monitor the operation of the plant.
7) Coordinates and supervise outside contractors.
8) Prepares standard operating procedures.
9) Evaluate performance of staffs, recommends promotion, additional training or termination.
10) Prepares employees safety procedures and makes sure that these procedures are implemented.
Sept. 18, 2000 – April 11, 2001 Electrician
Sulpicio Lines Inc. ( Under Fratris Agency )
Don Sulpicio Rd., Cebu City
1) Responsible for the installation and troubleshooting of ship lightings and alarm systems.
2) Responsible for the operation and designing of controls for several machines such as hydraulic pumps and servo motors of the ship.
3) Responsible for the installation and troubleshooting of inter-communication facilities of the ship.
4) Assist Chief Electrician for some electronics and electrical works.
Nov. 1999 – March 2000 On The Job Trainee
Mactan Electric Company
Sangi, Lapu-Lapu City
Assigned in:
Meter Installation Section
1) Installation of kilowatt-hour meters for residential houses, commercial and industrial establishments.
Complaints and Response Team
1) Take actions to customers requests and complaints.
2) Troubleshooting and repair loose/poor electrical connections.
Technical Services Department:
1) Installation and troubleshooting of high voltage transformers.
2) Installation of different types of transformer banking connections
3) Kilowatt-hour meter calibration.
4) Calibration of different types of high voltage insulators particularly (spool, strain, suspension and pin insulators).
5) Transformer and high voltage substation monitoring particularly its efficiency, percent overloading and its capacity.
Project and Maintenance Section
1) Upgrading of poor primary and secondary lines using different types and sizes of electrical conductors ( Aluminum and copper ).
2) installation of new transmission lines.
Aug. 1997 – Oct. 1999 Electrician
Pacific Villa I – Housing
Pajac, Lapu-Lapu City
1) Responsible for the installation of electrical wirings as per specified in electrical plan.
2) Implements electrical standards as provided in Philippine Electrical Code concerning
electrical wirings.
Education
June 1995- March 2000 : Cebu State College of Science and Technology – Main Campus
R. Palma St., Cebu City
Course : Bachelor of Science in Electrical Engineering (BSEE)
- April 2002, Registered Electrical Engineer (REE)
PRC license number 30003
- October 2000, Registered Master Electrician (RME)
PRC license number 24074
Certification
BST,BST-NAC,PSCRB,PSCRB-NAC,GTF,GTF-NAC, SBFF,SSA, RFPEW(ENGINEERING WATCH),YF,SRC,SIRB,PASSPORT
Skils
Computer :
1) MS Word, MS Excel, Power Point
2) Set-up, program installation,
troubleshoot and repair
of computer hardwares
3) Autocad
4) Webpage Designing
Electronics :
1) Troubleshooting and repair of
common electronics equipment