electrical engineer
- Project Engineering / Project Management
-
CURRICULUM VITAE
Ø WORKING EXPERIENCE:
(1) TECHNO POWER ENTERPRISE (P) LTD, (RAUSHEENA GROUP)
- Designation: SEINER. ENGINEER (Electrical)
- Duration: 20 JUNE 2016 to Till Date.
Present Project: - RURALELECTRIFICATION WORK UNDER RGGVY12thSCHIEME & DDUGJY,
Functional Area: - Erection & commissioning of 33/11kv Substation.
Key Role 1) Testing for all Equipment.
2) Erection Steel Structure,HT TRFO, HT & LT Outdoor Indoors CB & Control
Panel, Power & control cable lying. Battery & Battery Charger Panels,
Capacitor bank.Earthig work,
3) Control & Power cable Schedule pepper,
4) Sub-Station Illumination work,
5) All Equipment Civil Foundation work.
6). Daily supervision of work progress of Sub-Contractor.
7). Sub-Contractor bill checking.
8) Site jmc
.Project Details;-
SUBSTATION & RURAL ELECTRIFICATION OF 33/11K V SHEOHAR & MUZAFFAR PUE DISTRICT. (BIHAR),
CLINT:-NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED,
CLINT:- Jharkhand Bijli Vitran Nigam Limited ( Ramgarh,Jharkhand)
(2) ElectricalManufacturing Company (EMC) LTD.
- Designation:- ASST. ENGINEER (Electrical)
- Duration:- 15 November 2010 to 10 JUNE 2016
(A) PreviousProject: - 765/400KV SALEM POOLING (NEW) (AIS) S/S
* Functional Area: - Testing& commissioning of 765/400kv Substation.
Key Role 1) Testing for all Equipment.
2), HT Cable, LT Cable (Power, Control) Laying,
. 3). Daily supervision of work progress of Sub-Contractor.
4). Site problem solving.
5). Sub-Contractor bill checking.
6) Sub-Station Illumination work,
.Project Details;-
SUBSTATION PACKAGE B239FOR CONSTRUCTION OF 765/400kV DHARMAPURI, INDUR. (TAMIL NADU),
CLINT:-POWER GRID CORPORATIONOF INDIA LIMITED,
(A GOVERNMENT OF INDIA ENTERPRIS),
- (B) Previous Project: 400/220KV CHAIBASA (NEW) (AIS) S/S
* Functional Area: -Testing& Commissioning of 400/220kv Substation.
- Key Role: 1). 400KV 8 NOS BAY & 220KV 8 NOS BAY, 315MVA AUTO
- TRFO-2 NOS ,80 MVAR REACTOR-1 NOS,
2) Testing for all Equipment.
3), HT Cable, LT Cable (Power, Control) Laying,
. 4). Daily supervision of work progress of Sub-Contractor.
5). Sub-Contractor bill checking.
6) Sub-Station Illumination work,
.Project Details;-
SUBSTATION PACKAGE B2 FOR CONSTRUCTION OF400/220kV CHAIBASA (NEW) S/S ASSOCIATED WITHEASTERN REGION STRENGTHENING SCHEME III (JHARKHAND),
CLINT:POWER GRID CORPORATIONOF INDIA LIMITED,
(A GOVERNMENT OF INDIA ENTERPRIS),
(C)Previous Project: 132/33KV GIS SUBSTATION,
Functional Area: - Erection & Commissioning of 132/33KV GIS Substation.
Key Role 1) Erection for all Equipment.
- 2) Testing for all Equipment.
3), HT Cable, LT Cable (Power, Control) Laying,
4) Sub-Station Illumination work,
. 5). Daily supervision of work progress of Sub-Contractor.
6). Sub-Contractor bill checking.
Project Details; - 132/33 KV GIS SUBSTATION MATHABHANGA COOCHBEHAR.
(WEST BENGAL),
132/33 KV GIS SUBSTATION NAZIR PUR NADIA. (WEST BENGAL),
CLINT:West Bengal State Electricity Distribution Company Limited,
- (D) Previous Project: - 33/6.6 KV (VCB) Substation.
- Functional Area: - Erection & Commissioning of 33/6.6KV Substation.
- Key Role: 1). Erection Planning as per Drawing.
2).Erection of HT Transformers, LT Transformers, HT Panels,
LT Panels, HT Cable, LT Cable (Power, Control) Laying,
Battery & Battery Charger Panels, SCADA Panels, Capacitor
Bank, Air Core Reactors, Lightning Arrestors, HT & LT Bus Duct.
3). Daily supervision of work progress of Sub-Contractor.
4). Scads control system checking,
5). Site problem solving.
6). Sub-Contractor bill checking.
7). Consult with Client (ISP), Consultant (MECON LTD),
Equipment Supplier (AREVA, PCC, ECC Engineering)
.Project Details;-
Power Distribution Package-22 in Extension of 2.5 MT Production unit IISCO Steel Plant, Burnpur under Steel Authority of India Ltd. (WEST BENGAL)
(3) AREVA T&D INDIA LTD,(SALT LAKE .KOLKATA) ,
- Designation: SUPERVISOR (Electrical)
- Duration: 19 November 2006 to 10November2010.
*Functional Area:PIX 33 KV& HWX 11 KVVacuum circuit breaker assembly & site servicing,
33 KV & 6.6 KV Panel wiring & Testing,
Ø TECHNIQUAL QUALIFICATIONS:
Diploma (Electrical) from Central Calcutta Ploy technic. W.B
Government License (Electrical -1, 2, 11,6a.6b.7a.7b) W.B
Ø ACADEMIC QUALIFICATION
1. Passed Higher Secondary from (W.B.C.H.S.E),
2. Passed matriculation Examination from (W.B.B.S.E).
Ø PERSONAL INFORMATION:
- Date of Birth : 07/03/1982
- Father’s Name: FULCHAND SAROJ
- Marital status: Marred
- Language known: Bengali. Hindi. English,
DECLARATION
The above written statement is true and honest to the best of my knowledge. If the opportunity is given to me I will try my best under the rules and regulations of your organization.