AL-Tawleed Energy & Power Co., Riyadh, K.S.A March 2008- Present (Joint Venture with Tata Projects Limited, India & Al-Mashrik Co.,K.S.A)

The most reputed construction company in India & Gulf region



PROJECT ENGINEER—ELECTRICAL



Project Description: The ShuaibahIII IWPP (Independent Water & Power Project) project comprises the planning, procurement, manufacturing, delivery, construction, erection & commissioning of a crude oil fired steam power plant consisting of 3 modules, which includes 3 steam turbine sets. The total ISO output of the plant is approximately 2400 MW heat power and 905 MW Electrical Power, the total cost of this project is around $2.5billion.The Company scope in this project is Erection of Mechanical, Electrical & Instrumentation works at 3 x 300MW ShuaibahIII IWPP power plant at Shuaibah,Kingdom of Saudi Arabia (K.S.A)



Client: SIEMENS AG, Power Generation, Germany, Consultant: Fichtner, Germany



Main Work Includes:



? Erection of 3 x 300MW Power Plant

? Planning & Involved in Site execution work

? Co-ordination with Client, Subcontractor & Project consultant

? Material Procurement as per the drawing requirement & checking our scope of work

? Supervision of the project at site to ensure good quality of material and workmanship

? Deputing Manpower as per Job requirement & Responsible for Project Management

? Erection of 220KV / 110KV Substations, EHV equipments, Generator (Rating:497MVA,Simens make), Power Transformers (Ratings:480,160,120,80,10 MVA etc.),IPBD (Isolated phase bus duct) incl.Alumunium Welding (Rating:12.5,25KV),Generator Circuit Breaker (ABB make), Excitation Transformers (1460KVA,2wdg), Emergency Diesel Generator Sets (Rating:1160KVA), Batteries (Rating:220V),DC-DC Convertors (Rating:220/26V),UPS (Rating:230VAC), Control & Protection Panels, MV Switchgears (Ratings:13.2KV,6.6KV ), LV Switchgears (415V),Different rating of Electrical motors , Overall Plant Cable Tray Erection, Cable Laying (M.V, L.V, I&C & Fiber Optics), Cable Terminations, Earthing,Lightning Arrestor Systems, & Flue gas desulphurization (FGD) plant Lighting for all the 3 units of 330MW Crude Oil Fired Steam Power Plant

? Erection of Instrument and Control (I&C) Equipment (Actuators, Transmitters, Transducers, Junction Boxes etc,Central Control system equipments, Steam turbine automation system equipments,Meterological measuring system station etc installed in all the 3 units of 330 MW Power Plant

? Executing the Electrical Activities related to FGD System, Cathodic Corrosion Protection Systems for Mechanical Equipment & Continuous Emission Monitoring System installed in all the 3 units of 330MW Power Plant.

? Co-ordination with PTW (Permit to Work ) officers, testing & commissioning team

? As built drawing preparation

? Preparing of Amendments, Progress reports (Daily, Weekly, Monthly etc.),Cash Flow Chart & Running Account (R.A) Bills

? Co-coordinating in Site Electrical Maintenance & Construction power works

? Inspection of Site Works (From Quality Assurance/Quality Control Side)

? Maintaining of Execution work related Documents, Test Reports, and Field Quality Plans etc.

? Back office Co-ordination with project & engineering department



ETA Engineering Private Limited, Mumbai, India Dec 2006- Feb 2008

ETA Ascon, Dubai Group of Companies, The largest and the most reputed Construction Company in India & Gulf region



PROJECT ENGINEER—ELECTRICAL



Project Description: Vardhman Fabrics, India (A Unit of Mahavir Spinning Mills Limited) is an integrated 3200 Crores Textile Project implemented, Independently handled Tender of Electrical Installation Work of 11KV/433V Transformer, Substation, & Internal LT Distribution, Plant Lighting, Street Lighting & Earthing for 24MW Captive Power Plant, Textile Plants (Weaving, Spinning & process ) unit at Budhni, Bhopal, M.P (India)



Client: Vardhman Fabrics, India, Consultant: Fichtner Consulting Engineers India Pvt.Ltd, India (For Power Plant) & Gherzi Eastern Limited, Mumbai, India (For Textile Plants)



Main Work Includes:



? Erection of 24MW Power Plant, Textile Units as Weaving, Spinning & Process Unit from green field stage.

? Planning & Involved in Site execution work

? Co-ordination with Client, Subcontractor & Project consultant

? Material Procurement as per the drawing requirement & checking our scope of work

? Supervision of the project at site to ensure good quality of material and workmanship

? Deputing Manpower as per Job requirement & Responsible for Project Management

? Independently done total billing of this project. Having thorough knowledge of site billings. (Total Contract value of this company was Rs.28.47 Crores including Material supply & Installation)

? Erection of HT-LT switchyards for 11KV network.

? Smooth availability of Construction power at Optimum Cost.

? Installation of HT & LT Panels, Power Transformers, Battery Chargers, PDBs, SLDBs & LDBs, Indoor Lighting (Production Plant, Offices, Canteen Toilets etc.) & Outdoor Lighting (Substation, Street Lighting etc.), Earthing Pits and Earthing Grid, Lightning Grid for all the Units.

? Having thorough knowledge of Ladder, Perforated & Control cable tray installation in cable racks, cable trenches, and cable cellar, Substations & below panels etc.

? All types of Electrical Fabrication works. (Supports Installation work for cable tray, panel base frame, lighting on truss etc)

? Preparation of Cable Schedule, cable laying work from 1.5 sq.mm size to 400 sq.mm size (Both Al & Cu) for PDBs, LDBs, Electrical Motors, Power Point, ETP plant, WTP plant, Textiles Machines (Looms, Warping, Sizing, Inspection M/C’s Blow room, Ring frame, Stenter M/C’s) etc.

? Installation, Testing & Commissioning of APFC Panels of Different ratings (50, 75,100,250 KVAR) for Power Factor Improvement

? Executing the Electrical Activities related to Baby Boiler, Propane Distribution System, ETP Plant, H-Plant, and HSD Tanks.

? Involve in the electrical works to Staff & Worker colonies as Substations, Concealed wiring installation, Lighting etc.

? Preparation the indent material & consumables and co-ordination approval from client, management as applicable.

? Co-ordination to obtain stage clearance from Quality Assurance (QA)/Quality Control (QC)

? Preparation of site amendment, bill of quantities, field quality plan, site documentation & progress reports.



Sunil Hi-Tech Engineers Limited, Nagpur, India an ISO 9001-2000 Certified Company July 2006- Dec 2006

The reputed Construction Company (Mainly for Power Plants) in Maharashtra State, India



MAINTENANCE ENGINEER—ELECTRICAL



Project Description: New Parli Thermal Power Plant (250 MW Unit -1), Parli-Vaijnath, Distt: Beed, Maharashtra, India is an integrated 2000 Crore power plant Project implemented, The Company scope in this project is Erection of Electro-Mechanical Works at 250MW,Unit-1 Thermal Power Plant at Parli Vaijnath,Maharastra,India



Client: Maharashtra State Power Generation Company Limited (MSPGCL), India



Main Work Includes:



? To provide Construction power & Maintenance work in construction of 250MW Thermal Power Plant

? Co-ordination with Department project manager, engineers regarding Construction power & Maintenance work

? Maintenance of Power plant Construction equipments like diesel generator sets (D.G), electrical motors, welding rectifiers, winch machines, motor windings,etc. in site

? Operation and maintenance of Induction Heating Machine (Make: BHEL). This Machine is mainly used for heavy piping work (P-91) in H.P.Boilers.

? Testing & Meggring of Electro static Precipitator (ESP)

? Cable tray laying, Cable laying, Earthing & Cable termination work for respective motors in Coal Handling Plant (CHP).

? Lighting works in CHP, STG Building, Bunker, and Boilers.

? Deputing manpower’s as per job requirement.

? Making accidental, work progress, factual reports as per site requirement.



FINAL YEAR PROJECT



Bharat Sanchar Nigam limited (B.S.N.L), Nagpur, India March 2005 –April 2006

The largest government telecom company in India



Project Description: The title of this project is Remote Monitoring & Control of Base Transreciever Station (BTS/Mobile Tower), BTS used, are very huge numbers in mobile communication require round the clock monitoring & uninterrupted power supply from three sources like Mains power supply, D.G.Set, Battery and need proper synchronization of these three to ensure smooth functioning of Telecom Network. It will be very difficult to man at each BTS location, therefore need of effective remote monitoring and control of BTS infrastructure is being felt.

The objective of this work is to design an Automation system and Remote Control of diesel generator (D.G) through mobile phone, which should be effective enough to ensure



? Smooth function of equipments through automation.

? To minimize network down time.

? To avoid any hazard.

? For energy conservation and cost cutting.



Client: Bharat Sanchar Nigam limited (B.S.N.L), India



Main Work Includes:



? Understand the whole process from B.S.N.L Engineers.

? Design and implement circuit, based on BTS Room Temperature.

? Design and implement Circuit for remote control of Diesel Generator (D.G) through mobile phone.

? Manpower & DG consumption reduced effectively

? On site presentation in the behalf of G.M (B.S.N.L), Nagpur

? Installation, tessting & commissioning of electronic circuits in BTS room.

? Successfully completed above mentioned project



VOCATIONAL TRAINING



1. Undergone Training from 11/12/04 to 05/1/05 in TATA MOTORS, Jamshedpur, India

Project Title: “System Development in Electrical Repairing Shop of High voltage Transmission Limited (HVTL)”



2. Undergone Training from 21/06/04 to 12/07/04 in TATA TINPLATE, Jamshedpur, India

Project Title: “Study of E.O.T Cranes” (Electrical overhead Traveling Cranes)


Education


BACHELOR OF ENGINEERING (ELECTRICAL ENGINEER)

Nagpur University, Nagpur, India, (2006)



SENIOR SECONDARY SCHOOL

Ranchi University, Ranchi, India (2001)



HIGH SCHOOL

Central Karimia High School, Jamshedpur, India (1999)


Certification


? President of Electrical Engineering Student Forum (EESF) during my Engineering.

? National Level Paper Presentation in IEEE, Hyderabad on “Energy Conservation in Electrical Drives.”

? National Level Paper Presentation in IEEE, Nagpur on “Automation in BTS Infrastructure”

? Certificate of merit for Poster Presentation in engineering level on “Polymer & Plastics.”

? Attended workshop on “power plant familiarization” conducted by National power thermal Institute (N.P.T.I), Nagpur

? Won the event manager prize for organizing the National level college technical project & paper presentation festival, Sanshodhan 2006


Skils


COMPUTER SKILLS



Programs Excellent with MS Office (Word, Excel & Power Point)

Languages

Others

C

AutoCAD (2d),Computer aided electrical engineering drawing, Visio 32,Unitool professional


 

Jamshedpur,
View Contact Information