Objective
1. Seeking a position to gain further exposure and experience.
2. To be the very best in job performance by learning as much as could from the others in the company.
3. To make positive impact to organization through continuous development and professionals kills.
4. To give full commitment to the company and supporting the company’s objectives.
5. To be among the best employee in the company
Experience
Job Position: Electrical Engineer
Company / Sponsor: Link Projects & Resources Int'l, Doha-Qatar
Job Responsibility: Site Engineering/ Management, Material/ Labor control, Project planning, cost control etc
Duration of Job : 1 year (May 2007 – Apr. 2008)
Job Position: Electrical Engineer
Company: Bikash Floor Mill Pvt. Ltd, Nepal
Job Responsibity: To help Senior Engineer in Machine plant, Labor control, Inspection, Troubleshooting etc.
Duration of Job : 8month (Sep. 2006 – Apr. 2007)
Job Position: Apprentice
Company: Tandon Plastic Pvt. Ltd
Job Responsibility: To help Engineer in production Section, reports on Input/outputs etc.
Duration of Job : 8month (May’ 2003 – Dec’ 2003
Education
Bachelor's Degree
Field of Study : B. Engg. (Hons) -Electrical & Electronic Engineering
Major : Power
University : Linton College, Malaysia // Nottingham Trent University, United Kingdom
Graduation Date : Aug. 2006
Pre-Engineering
Field of Study : Science & Technology
Major : Technical & Science subjects
Institute/University : National Academy for Engineering Education (NAEE), Nepal
Graduation Date : March 2003
Higher Secondary/Pre-U/"A" Level
Field of Study : Science & Technology
Major : Math
Institute/University : S R J Inter College, U.P., India
Graduation Date : May 2002
School Leaving Certificate. (SLC)/"O" Level
Field of Study : Science & Technology
Major : Math, Science
Institute/University : Bright Land High School, NEPAL
Graduation Date : May 2000
Trainings
Certification
Training On : General Insurance Training Program for Surveyor
Awarding Body : Insurance Board of NEPAL
Awarding Date : 5th April 2007
Skils
Computer Skills : MS word, MS Excel, MS Power Point, MS Project
Software Skills : MATLAB, basic Knowledge of C, C++
PROJECT UNDERTAKEN
• Fuzzy Logic Based AC Servomotor (Speed Control)
Project summary:
The objective of this project was to design Fuzzy Logic Controller for controlling the Speed of AC servomotor. Here the fuzzy logic controller is been placed at a feedback path of the system, which provides additional control voltage to a servomotor in case speed of rotor (servomotor) changes due to change in flux linkage in rotor side.
Duration: Oct 2005 to May 2006
Role: Individual Project
Software and Platform: Borland Turbo C++, Visual C++, Mat lab
• PC based home Domestic Controller for Disabled Person.
Summary of Project:
To develop the home automation system, that provides automatic control over security and electronic system. This project was developed for Disabled person, who can control all the security system just via remote controller.
Duration: Oct 2004 to May 2005
Role: Programmer
Software and Platform: Visual Basic, Visual C++
• Traffic Light
Project summary:
To develop 2-way traffic light for controlling the traffic in the busy roads.
Duration: Jan 2004 to August 2004
Role: IC and chip combination work
Hardware: construction of circuit on B.Board and assembling it with switches with the external subway
Architecture.