I'm interested on Engineering and Supervision of Oil and Gas Marine and Offshore projects


Experience


EMPLOYMENT HISTORY



November 2005 to the present, Sr. Electrical & Instrumentation Engineer Belanak LPG FSO Project; ConocoPhillips Indonesia; Singapore

Assist and advise the LPG FSO Engineering and Fabrication Manager in all aspects of

Project management as necessary.

Review and approve Contractor’s design, engineering documents and drawings of electrical

and instrumentation systems.

Interface with Operations for input into design and testing of all systems.

Provides support to QA/QC engineer during design, conversion and fabrication phases of

the LPG FSO.

Ensure proper resolution of interfaces between the LPG FSO electrical and instrumentation

systems and the FPSO and Mooring system, primarily related to LPG-FSO power supply

and power management, LPG FSO operations monitoring, safety and ESD systems

performance monitoring and communications.

Review and approve Contractor furnished drawings and specifications.

Review all procedures necessary to manage the electrical and instrumentation scope of

work both technically and contractually.

Interface with the other LPG FSO disciplines.

Review and approve Contractor “Approved for Construction” electrical drawings.

Review and approve vendor bids for “estimated sums” compiled by the Contractor.

Monitor and supervise the LPG-FSO fabrication activities by Contractor.

Follow-up and verify that the installation of electrical systems are in accordance with

engineering drawings and specifications and equipment manufacturer requirements.

Responsible for the testing of all electrical and instrumentation equipment. Attend vendors

technical meetings and equipment FAT’s.

Monitor and supervise the implementation of Contractor’s safety and quality control

systems during the fabrication, testing and commissioning activities as they relate to the

electrical and instrumentation systems.

Review material and equipment certification compiled by the Contractor.

Review change order requests.

Witness testing of systems and equipment.

Review and approve all documentation prepared by Contractor and required by the contract.

Review and approve all “As Built Drawings”.

Witness and approve the testing, commissioning and placing in service all of the electrical

equipment and instrumentation systems.

Assist with the delivery process of the LPG FSO facility to the Operations Group

Interim LPG FSO on place and Permanent LPG FSO in design Phase



NOTE*

December 2008 To March 2009 Temporary assignment in Qatar Gas LNG Project; DSME shipyard (Korea) as Lead Electrical Inspector

Primary functions and responsibilities:

Assist and Advice to the Project team on the Sea & Gas trial for equipment and system testing and commissioning

Responsible of testing all electrical systems, Power Generation, Power distribution (6.6KV, 440V, 220V and 24V). Instrumentation & Control, Power Management, El cargo equipment, Cargo control & monitoring systems, Cargo Gas Refrigeration and Reliquefaction Plant, Navigation & Communication equipment



August 2002 – November 2005 Lead Marine Electrical Specialist for Corocoro FSO Project; Marine; ConocoPhillips; Houston and Samsung shipyard (Korea)

Design Lead electrical engineer Corocoro FSO project.

Power system,

Power management System

Control & Monitoring system

Cargo & Ballast Control and Monitoring System

Refrigerating & air conditioning system,

Navigation system & Communication systems

Review of drawings contract and Specifications.

Inspect machinery at shipyard prior to installation onboard vessel

Inspection of electrical installation equipment and electrical cable, during shipbuilding at

shipyard

Attendance of Shop tests electrical equipment

Attendance of sea trial

Maintain high quality control during installation and commissioning

Deliver FSO on time and Budget



July 2001 – August 2002 Lead marine Electrical specialist Seahorse Shuttling & Technology; Marine; ConocoPhillps; Houston and Samsung (Korea)

Design Lead electrical engineer GOMAX project

Power system

Power management System

Control & Instrumentation system

Dynamically positioning system

Thrusters system

Cargo & Ballast Monitoring System

Refrigerating & air conditioning system

Navigation & Communication systems

Review of drawings, contract and Specifications.

Design the Engine room and equipment in Mega modules



April 1999 – July 2001 Electrical engineer advisor for Drillships Deepwater Pathfinder and Deepwater Frontier; Marine; ConocoPhillips;

Advises Chief Engineer on subjects related to vessel's electrical systems and vessel's

construction.

Assists Chief Engineer with the verification, lining and starting up of all main and auxiliary

drilling systems, in preparation to the first drilling operation in the GOM.

Assists Chief Engineer with the implementation of the Planned Maintenance Program,

Electrical part, on board.

Assists Chief Engineer with the installation and starting up of the vessel's Technical library

Electrical part, that consists in: Blue Prints, Technical Records, Manufacturers Instruction

Books and Files.

Consults with Chief Engineer and vessel's Chief electrician in order to conduct an analysis

for spare parts inventory levels for electrical equipment and makes recommendations

accordingly

Advises Chief Engineer on electrical matters as required.

Supports and participates actively in vessel's Safety and Environmental Programs.

Consults with OIM and Drilling operations personnel as required to become fully acquainted

with all drilling associated activities.

Review and modify preventive maintenance

Create procedures for HV system maintenance without operation down time



May 1996 – April 1999 Electrical Supervisor for DP3 D/El. Drillships; ConocoPhillips; Houston and Samsung Shipyard (Korea)

Advice to fabrication marine engineer on the design of :

Power generation and distribution system

Electrical Propulsion Azimuth Thrusters & control

Control, monitoring and power management system for DP 3 class

Design of agronomic and integrated bridge navigation system

Review drawings and contract specifications

Inspect machinery at shipyard prior to installation onboard vessel

Inspection of electrical equipment installation and electrical cable during shipbuilding at

shipyard. Attendance of Shop tests electrical equipment and sea trial

Maintain high quality control during installation and test

Deliver Drillships on time and budget



March 1994 – May 1996 Electrical supervisor for DP 2 type D/El. Shuttle Oil tanker Rangrid; Marine; ConocoPhillips; Houston and Samsung shipyard (Korea)

Review of drawings and contract specifications

Advice to fabrication marine engineer on the design of :

Power generation and distribution system

El. Propulsion and control

Tunnel Thrusters and control

Control, monitoring and power management system for DP 2 class

Design of agronomic and integrated bridge navigation system

Inspect machinery at shipyard prior to installation onboard vessel.

Inspection of installation of electrical equipment and electrical cable during shipbuilding at

shipyard.

Attendance of Shop tests electrical equipment and sea trial

Maintain high quality control during installation and test

Deliver ship on time and budget



September 1991 – March 1994 Electrical supervisor, Double Hull Oil Tankers Project; Marine; ConocoPhillips; Houston and Samsung shipyard (Korea)

Review of drawings and contract specifications

Advice to fabrication marine engineer on the design of:

Power generation and distribution system.

El. Propulsion and control. Tunnel Thrusters and control

Control, monitoring and power management system for DP 2 class

Navigation & Communication system

Inspect machinery at shipyard prior to installation onboard vessel.

Inspection of installation of electrical equipment and electrical cable during shipbuilding at

shipyard.

Attendance of Shop tests electrical equipment and sea trial

Maintain high quality control during installation and test

Deliver vessels on time and Budget



November 1989 – September /1991 Electrician Engineer Officer; Marine; ConocoPhillips; Onboard ship

Manage ship’s electrical plant operation.

Electrical Circuitry

Pneumatic & Hydraulic system maintenance

Control & Instrumentation maintenance

Navigation & Communication equipment maintenance

Responsible for safe and efficient operation of the above equipment, to ensure proper function

Maintain Ship at 100% Electrically operational



March 1973 – November 1989 Electrician Engineer Officer; Trinidad Corporation / Maritime Overseas / Total / Utha Shipping / Gotas Larsen

Manage ship’s electrical plant operation

Electrical Circuitry

Pneumatic & Hydraulic system maintenance

Control & Instrumentation maintenance

Navigation & Communication equipment maintenance

Responsible for safe and efficient operation of the above equipment to ensure proper function

Maintain ship at 100% electrically operational



1968 to 1973 Electrician Engineer: A.S.E.A. Astilleros Espanoles (Bilbao)

Primary functions and responsibilities:

Responsible for installation of electrical cables and Equipment

Responsible for installation of Navigation equipment and Radio communication system

Responsible for installation of Control systems

Testing and commissioning electrical power equipment

Testing and commissioning Control & instrumentation system, Navigation equipment and Radio Communication

Attendance of sea trials


Education


Electrician Engineer by Euskalduna shipyard (Astilleros Espanoles)Technical school

Different training curses as listed in Certifications

Lenguages

Spanish, English, French (elementary)


Certification


Certificate of Electrician Bilbao, Spain, December 27, 1968

Seminar of Electro technology Naval Portugalete, Spain, February 23, 1979

Certificate of Competence of Marine Merchant Bilbao, Spain, July 27, 1984

Seminar of Safety and Engineering Management. Gijon. Spain, July 20, 1990

ABS Certificate Qualified welding Inspector Houston, Texas January 22, 1994

Training Course of Cyclo driven diesel electric propulsion Helsinki, Finland, January 27, 1994

Seminar of Safety, Environmental and Quality Insurance Gijon, Spain, June16, 1995

Certificate of Sea Survival Level I Gijon, Spain, June 2, 1995

Certificate of Fire fighting Level I Gijon, Spain, June 2, 1995

Certificate of Sea Survival Level II Gijon, Spain, June 9, 1995

Certificate of Fire fighting Level II Gijon, Spain, June 9, 1995

Training Course of Power Generation and Distribution Sys Geoje, South Korea, August 31, 1998

Certificate of Helicopter Evacuation and Sea Survival. New Plymouth, New Zealand. May 3, 1999

Training Course of GE Toolbox for frequency drives Salem, Virginia, May 07, 2001

Seminar of Behavioral observation Geoje, South Korea, February 6, 2004

ABS LNG Carriers Training Course Geoje, South Korea, June 17, 2005

Basic Offshore Safety Induction and Emergency Training Singapore August 16, 2006

Gas Processing and Process control engineering Jakarta, Indonesia, September 5, 2008


Skils


Marine electrical specialist with 16 years (1973 to 1989) of sailing experience, in Oil tanker vessels, Chemical tanker vessels, Bulkarrier vessels, OBO vessels, LNG tanker vessels and LPG tanker vessels. In addition, 18 years (1991 to the present) of experience in Marine engineering and construction projects such as, Oil tanker vessels, Diesel electric DP 2 Oil shuttle tanker vessels, Diesel electric DP3 Deepwater drillships, FSO, LPG FSO.


 


Good and fluent communication with different cultures, having worked in countries like USA, South Korea, Indonesia and having traveled all around of Europe, USA, Canada, South Korea, for equipment FATs and supervision of equipment fabrication

Algorta, Vizcaya,