Draft Surveyor
- Marine
-
DRAFT SURVEYOR (PROJECT BASED)
Carson Shipping and Port Terminal Services Inc.
May 2012 – October 30, 2012
June 2013 – October 30,2013
July 2014 – October 30,2014
June 2015 – October 30, 2015
May 13, 2016 – October 30, 2016
April 7, 2017 – October 30, 2017
April 2018 – October 30, 2018
May 2019 – October 30, 2019
Job Responsibilities:
- Undertaking draft survey services up to two (2) assigned vessels simultaneously loading/unloading in the same pier/anchorage
- Submitting daily report of vessel/s and feeder fleet activity following the format and frequency required by CARSON cc to named parties to be sent by text daily before 0900H with cut off time of 0700H for the 24-hours operation. After the final draft survey, the reports, samples attached shall be submitted to the office immediately by courier or hand carried, whichever will be the fastest.
-
Las Pinas City,