Commissioning Engineer

Objective


Would like to work for a company that stands by on whats they say.


Experience


Building and a review of the overall energy strategies for the Center South Master Plan. The Building 3-61 and 3-62 projects will renovate the existing 200,000-square-foot Chinook Helicopter Facility, Assembly Line, Shop Facility and Mezzanine Office Space in two phased projects. Renovations include new HVAC systems and controls, new lighting and day lighting controls, domestic hot water system improvements and connections to new central utilities (hot water and chilled water loops). The Building 4-14 project will construct a new 14,000-square-foot central utility building including fit out of the new chilled water system for the center south campus with a future project planned to provide dual-fuel fired boilers. The total construction value was $0.



Boeing H47, Building 3-62 Shop/Office, Ridley Park, PA: Electrical Commissioning Agent Provide LEED Enhanced Commissioning Services for the ongoing projects to renovate Boeing's Center South Campus in Prospect Park, PA. The center south campus includes the factory/assembly building, central utility plants, maintenance shops, testing facilities and office space supporting the production of the Chinook Helicopter. Commissioning services to be provided include: provision of the commissioning plan; design review; drafting of commissioning specifications; shop drawing and construction submittal review; provision of prefunctional checklists; site observations during construction and equipment start-up; administering of TAB verification and functional performance testing; review of O&M manuals, as-built drawings, and other record documentation; 10-month warranty visit with O&M personnel; and provision of the commissioning record and systems manual. Commissioning services are being provided for the initial projects planned by Boeing to renovate the Center South Campus of their facility in Prospect Park, PA and will include: Building 3-61 H-47 Focus Factory Renovation, Building 3-62 H-47 Focus Factory Renovation (Pre-flight/Shop/Office Building), Building 4-14 New Central Utilities Building and a review of the overall energy strategies for the Center South Master Plan. The Building 3-61 and 3-62 projects will renovate the existing 200,000-square-foot Chinook Helicopter Facility, Assembly Line, Shop Facility and Mezzanine Office Space in two phased projects. Renovations include new HVAC systems and controls, new lighting and day lighting controls, domestic hot water system improvements and connections to new central utilities (hot water and chilled water loops). The Building 4-14 project will construct a new 14,000-square-foot central utility building including fit out of the new chilled water system for the center south campus with a future project planned to provide dual-fuel fired boilers. The total construction value was $0.



Boeing H47, Building 4-14 Central Utility Plant, Ridley Park, PA: Electrical Commissioning Agent Provide LEED Enhanced Commissioning Services for the ongoing projects to renovate Boeing's Center South Campus in Prospect Park, PA. The center south campus includes the factory/assembly building, central utility plants, maintenance shops, testing facilities and office space supporting the production of the Chinook Helicopter. Commissioning services to be provided include: provision of the commissioning plan; design review; drafting of commissioning specifications; shop drawing and construction submittal review; provision of prefunctional checklists; site observations during construction and equipment start-up; administering of TAB verification and functional performance testing; review of O&M manuals, as-built drawings, and other record documentation; 10-month warranty visit with O&M personnel; and provision of the commissioning record and systems manual. Commissioning services are being provided for the initial projects planned by Boeing to renovate the Center South Campus of their facility in Prospect Park, PA and will include: Building 3-61 H-47 Focus Factory Renovation, Building 3-62 H-47 Focus Factory Renovation (Pre-flight/Shop/Office Building), Building 4-14 New Central Utilities Building and a review of the overall energy strategies for the Center South Master Plan. The Building 3-61 and 3-62 projects will renovate the existing 200,000-square-foot Chinook Helicopter Facility, Assembly Line, Shop Facility and Mezzanine Office Space in two phased projects. Renovations include new HVAC systems and controls, new lighting and day lighting controls, domestic hot water system improvements and connections to new central utilities (hot water and chilled water loops). The Building 4-14 project will construct a new 14,000-square-foot central utility building including fit out of the new chilled water system for the center south campus with a future project planned to provide dual-fuel fired boilers. The total construction value was $0.



Bush Tabernacle Skating Rink, Purcellville, VA: As Commissioning Specialist, preformed constructibility review of electrical plans to ensure proper installation of all electrical components and systems to meet outlined specifications. Verified if change orders would be needed for project. Performed commissioning of all electrical systems during installation to ensure all electrical power, lighting, and emergency power were installed according to specifications. MBP provided project and construction management support to the owner's staff responsible for the repairs and alterations of the town's skating rink building. The project involved the timber structure, originally constructed in 1903, in recent years it has been run by the local fire department who rented the space for public and private use. In the process of planning some repairs and alterations to the building, a structural engineer involved in a study of the building questioned the structural soundness of the building in its existing condition. Upon identification of structural integrity issues, the Town immediately began the process of repairing the structure with the intent of resuming use of the facility as soon as possible. Of additional importance was the Town's intent to have the structure added to the Historic Registry. The total construction value was $1,597,400.



Eastern Montgomery Elementary School Commissioning Services, Elliston, VA: As Commissioning Specialist, provided pre-construction and construction phase construction management and building commissioning services. MBP provided pre-construction and construction phase construction management and building commissioning services to Montgomery County Public Schools. The project involved the construction of two new Montgomery County Public elementary schools. Both schools are approximately 106,000-square feet on approximately 20 acres of land. This project is for the first of the two schools, Elliston Elementary School. The project includes K-5 classrooms, cafeteria, gymnasium, library, and associated spaces. The total construction value was $18,600,000.



Fauquier County High School, Warrenton, VA: Commissioning Agent MBP provided LEED enhanced commissioning services including design review, as prescribed in LEED 2009 for Schools New Construction and Major Renovations by the U.S. Green Building Council. Fauquier County Public Schools constructed a new 89,700-square-foot addition to Fauquier High School, demolished two wings totaling 50,000 square feet, and renovated additional existing space totaling 7,000 square feet in three continuous phases. The project was designed to achieve LEED Gold certification and included features such as: geothermal HVAC, a reflective roof, "dark skies" exterior lighting, heat recovery air units, indoor lighting controls, and an energy management system. The total construction value was $25,000,000.



Krasnow Institute Phase II, Fairfax, VA: As Electrical Commissioning Agent, provided shop drawing review, performed site observation, and oversaw emergency power system installation and testing. Commissioning Services - 100% design CD phase through occupancy phase. MBP provided commissioning services for George Mason University Krasnow Institute II Addition. The building is a 15,000 square foot vivarium and laboratory addition to the existing building. The total construction value was $8,800,000.



Petworth Branch Library, District of Columbia Public Libraries, Washington, DC: As Commissioning Specialist, performed commissioning of electrical systems to meet National Electrical Code (NEC) and job specifications. MBP provided commissioning services for design, construction and post-construction phases for the library renovation project. Services included preparation of commissioning plan, submittal review, development of pre-functional checklists, construction visits and reports, development and execution of functional performance tests, review of O&M Manuals, preparation of commissioning record and post-construction warranty review. The design-build project is to modernize the Petworth Library to LEED Silver certification. Project included a complete renovation of and modernization of building systems. Overall project size of Petworth Library is 21,266 gross square feet. The total construction value was $10,000,000.



Price's Fork Elementary School, Blacksburg, VA: As Commissioning Specialist, reviewed and verified change orders and the cost associated. MBP provided construction management services including change order review and evaluation, CPM scheduling analysis, project management support, program budget controls, and on site construction project inspection. The Project involves a one-story, 106,000-square-foot elementary school on approximately 20 acres of land. The school provides pre-K through fifth grade classrooms, cafeteria, a full size gymnasium, library, and alternate learning and support spaces. The project features pitched aluminum roofs, curved aluminum roofs, and is designed with key green features to reduce energy costs. The total construction value was $15,600,000.



Project Infinity: Provided design development and 50% construction document constructibility review services on the project. Project Infinity is a 2-story, 169,280-gross-square-foot administrative and clinical laboratory facility located in Burlington, NC. The total construction value was $0.



Project Infinity: Provided design development and 90% construction document constructibility review services on the project. Project Infinity is a 2-story, 169,280-gross-square-foot administrative and clinical laboratory facility located in Burlington, NC. The total construction value was $0.



PTN 19609 Renovation of 2C145/2C 153 at Ft Meade, Fort Meade, MD: As Commissioning Specialist, performed constructibility review of electrical plans to ensure proper installation of all electrical components and systems to meet outlined specifications. Performed commissioning of all electrical systems during installation ensuring all electrical power, lighting, and emergency power was installed according to LEED specifications. Provided commissioning services for the acceptance testing of new electrical systems for a renovation project at Fort Meade, MD. Project provided for the renovation of 5,600 square feet of office space in Building 2C Suites 2C145 and 2 C153 at Fort Meade, MD. The total construction value was $0.



Purcellville Town Hall, Purcellville, VA: Provide project management services for the Purcellville New Town Hall renovations. The Town of Purcellville purchased an unused Baptist Church to convert it into the Purcellville New Town Hall. This is the third task for MBP with the first task being a property condition assessment and the second task being project management of hazardous material removals. The total construction value was $1,650,000.



St. Albans Athletic Field, Washington, DC: As Commissioning Specialist, performed constructibility review of electrical plans to ensure proper installation of all electrical components and systems to meet outlined specifications. Verified if change orders would be needed for the project. MBP provided a constructibility (peer) review of the 100% CDs for phase one of a two phase project: demolition and construction. Follow on tasks included constructibility review for phase two and pre-construction, construction, and post-construction construction management services. The project involved a two-phased demolition and reconstruction of an existing athletic field complex on an 11-acre site. The new complex consisted of a new outdoor swimming pool, track and field facility, baseball field, and seven tennis courts incorporating a mile of cast-in-place retaining walls. The project included the relocation of an underground primary electrical feed, 60,000-cubic-yards of (earthwork) cut, and 40,000-cubic-yards of fill. The total construction value was $1,650,000.



Student Union Building, George Mason University, Fairfax, VA: As Commissioning Specialist, performed commissioning services during the design, construction, acceptance, and occupancy phases of the project. MBP performed commissioning services during the design, construction, acceptance, and occupancy phases of the project. The project involved a new, four-story, 65,000-square-foot addition for an existing Student Union Building. During construction, renovations within the existing facility were performed in three phases. Approximately 30,000-square feet of the existing building was renovated. The total construction value was $17,550,000.



Walter Reed Hospital, Washington DC: As a Lead Electrician performed design and installation of new main 13,800 volt switch gear system feeding base. Performed commissioning on a new $110 million electrical system including 13,800 volt switch gear and secondary gear. Provided quality control of work being performed on all switch gear installation. Insured all work was done in accordance with OSHA and military guide lines.



Los Angeles International Airport, Los Angeles, CA: As Lead Tester and commissioning specialist. Performed installation and lay out of $210 million electrical systems, which included CCTV, data, and security systems. In addition, created as-built drawings and maintained daily reports.


Education


Education

BSEE, Electrical Engineering, University of California-Davis, 2007



AS, Science in Environmental and Occupational Health, Allen Hancock College, 2005



AS, Science in Emergency Management, Allen Hancock College, 2005


Certification


Professional Certifications/Registrations

Certified Energy Manager (CEM)



OSHA 10-Hour Course Construction Safety & Health, Virginia



Professional Associations

Member, Building Commissioning Association



Member, National Fire Protection Association



Member, USGBC