CIVIL/STRUCTURAL DESIGNER
- Engineer / Naval Architect
-
Cover Letter
Respected Sir/Madam,
- Professional career as CIVIL/STRUCTURAL DESIGNER with 9 years with GCC Experience.
- Experience works on detailed drafting and 3D modelling activity of complete Refinery, Oil & Gas structures such as Pipe Rack, Pipe support, Platforms, and Decks etc.
- Software Proficiency: SM3D(SmartMarine 3D) For Offshore, SP3D,PDMS,MICROSTATION,AUTOCAD, SMART SKETCH
I'm seeking a challenging and rewarding work relationship where my abilities and potentials can be fully and effectively utilized. I will surely take the job with a great sense of responsibility and enjoy the challenge of new situations and expect to make a positive contribution.
DECLARATION
I hereby conform to the best of my knowledge for having furnished the genuine Details aboveThank you for your time and consideration. I look forward to speaking with you about this employment opportunity.
Curriculum vitae
Ramesh Sagar.N
Cell: +91 9884534689
E-Mail: ramesh16sagar@gmail.com
- Professional career as CIVIL/STRUCTURAL DESIGNER with 9 year’s
- Experience works on detailed drafting and 3D modelling activity of complete Refinery, Oil & Gas structures such as Pipe Rack, Pipe support, Platforms, etc.3d model of inside cable trey support and foundation & pipe sleepers & pipe supports.
KEY SKILLS
- SM3D(SmartMarine 3D) For Offshore
- Smart Plant 3D And Smart sketch 2D (Ver 2011 R1 And 2014 R1 )
- PDMS Design (Ver 11.5,11.6 SP4,12.0 SP6.9)
- Micro station Ver 8.
- AutoCAD all versions.
- Navisworks Freedom 2017
- Smart Plant Review (SPR)
- Microsoft Office XP: MS word, Excel, Access Power point
WORK EXPERIANCE
Projects Involved: J Ray Mcdermott Engineering Services Pvt. Ltd.(Chennai)
Project : Marjan package 1 Project
Client : Saudi Arabian Oil Company
Designation : Structural Designer
Duration : July 2016 to January 2017
Responsibility:
- Modeling All Primary members Steel for Main, Mid and Cellar Decks.
- Modeling Joints, Cans, Cone, Floor deck plate and elliptical.
- Modeling Handrail & Stair tower arrangement
- Coordinating with Design Lead and Project S3D Administrator to customize S3D as per project requirements.
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Extracted Smart sketch Drawings for all plans and elevations & Joint details.
Projects Involved: PETROFAC (Kuwait)
Project : Lower Fars Heavy Oil Development Program Phase-1
Client : KOC (Kuwait Oil Company)
Designation : Structural Designer
Duration : Oct 2018 to JUNE 2019.
Responsibility:
- Review and inspect the contractors work to ensure that both the design intent and the quality of workmanship and materials are achieved in accordance with the drawings and specifications.
- Prepare of progress reports based upon the findings during site visits.
- Provide recommendations to overcome deficiencies or potential problems observed on site related to the project design requirements.
- Coordinate with suppliers, site engineers and project managers for the resolution of problems.
- Red line marking related resolving and design preparation for project.
- Clarifying details with Engineering Departments for project.
- Follow up the detail especially during the construction phase.
- Provide supplementary design drawings and information as needed.
Projects Involved: FLUOR (Delhi)
Project : Future Growth Project
Client : TENGIZCHEVROIL (TCO)
Designation : Structural Designer
Duration : January 2017 to February 2018
The Future Growth Project (FGP) is planned as the next major expansion of company’s (Tengizchevroil) oil production capacity. The Capacity of the FGP process facilities is 12 MMTY of stabilized oil and 960 MMscfd of injected gas. Modularization of the FGP facilities considers the design of plant using equipment modules and pre-assembled pipe rack sections (PARs) – collectively termed “Modules”.
Worked as a Structural Designer, Modeling of Steel Structures Using SP3D and preparation of GA Drawing’s And Standard Drawings Using Micro-Station and Auto-Cad as per Client requirements. Model Self Checking and Preparation of Design drawings for Oil & Gas Industry.
Responsibility:- Modeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
- Modeling for Steel Ladders, Steel Hand railings, Gratings.
- Clearing Inter Discipline Checking (IDC).
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Preparation of Model locking reports.
- Support structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
- Preparation of GA drawing.
Projects Involved: PETROFAC (Chennai)
Project :Jazan Refinery Project
Client : Saudi Arabian Oil Company
Designation : Structural Designer
Duration : July 2016 to January 2017
Responsibility:
- Modeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
- Modeling for Pipe Support foundation.
- Modeling for Steel Ladders, Steel Hand railings, Gratings.
- Clearing Inter Discipline Checking (IDC).
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Preparation of Model locking reports.
- Support structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
- Preparation of GA drawing.
Projects Involved: PETROFAC (Mumbai)
Project : Fadhili Gas Plant Project
Client : Saudi Arabian Oil Company
Organization : PETROFAC (Mumbai)
Designation : Structural Designer
Duration : June 201 6 to July 2016
Fadhili Gas Plant (FGP) is a grassroots gas processing facility with a total capacity of 2,500 MMSCFD located approximately 30 Kms North West of Khursaniyah Gas Plant and 80 Kms West of Jubail.
Responsibility:
- Modeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
- Modeling for Structure foundation, Equipment foundation, Roads, paving, Trenches Etc.
- Modeling for Steel Ladders, Steel Hand railings, Gratings.
- Clearing Inter Discipline Checking (IDC).
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Preparation of Model locking reports.
- Support structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
- Preparation of GA drawing.
Projects Involved: PETROFAC (Chennai)
Project : ZADCO
Client : Zakum Development Company
Designation : Structural Designer
Duration : March 2014 to March2016
- Install on-Island facilities for production capacity of 750,000 BOPD for Production Build-Up (PBU) Phase. Phased completion/handover: PBU-1, PBU-2A & PBU-2B.
- Leaving provisions for future Sustainable Production (SP) Phase.
- Install Initial Production (IP) facilities with temp facilities on West Island (optional scope).
- Demolition of IP facilities upon completion of PBU-1, PBU-2A & PBU-2B on all Islands (optional scope).
- Four new artificial islands (Central, North, South and West) and subsea pipelines, cables, risers and flares being constructed by others. Each Island to have Drilling Area, Oil Producing/Injection Wells, Processing Area, Utilities Area, Accommodation.
Responsibility:
- Modeling for Steel Structures, Pipe racks, Pipe supports, Platform Supports.
- Modeling for Steel Ladders, Steel Hand railings, Gratings.
- Clearing Inter Discipline Checking (IDC).
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Preparation of Model locking reports.
- Support structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
- Preparation of GA drawing.
- Modeling for Pipe Support foundation.
Projects Involved: CGC CONVERSE TECHNOLOGIES (Hyderabad)
Project : KNPC (Kuwait National Petroleum Company)
Client : Kuwait National Petroleum Company
Designation : Structural Designer
Duration : JULY 2012 TO FEB 2014
Mina Al Ahmadi (MAA), one of the largest refineries in the region, was established in 1944 and since then has undergone several modifications/upgrades.
Responsibility:
- Modeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
- Modeling for Structure foundation, Equipment foundation, Roads, paving, Trenches Etc.
- Modeling for Steel Ladders, Steel Hand railings, Gratings.
- Clearing Inter Discipline Checking (IDC).
- Resolving Clash in Model.
- Preparation of MTO for Structures using sp3d reports.
- Preparation of Model locking reports.
- Support structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
- Preparation of GA drawing.
Projects Involved: CGC CONVERSE TECHNOLOGIES (Hyderabad)
Project : NGL
Client : QATAR PETROLIUM
Designation : Structural Designer
Duration : JAN 2011 to JULY 2012
NGL It’s the 1976’s Existing plant of Natural Gas to Liquid like NGL our scope is to remodeling for the documentation and expansion of the plant
Responsibility:
- PDMS 3D Modeling of primary and secondary structures, stiffeners plates, gratings, platforms,
- Modeling of equipment racks, pipe racks, staircase, ladders, and stiffener plates.
- Extraction of Auto Cad 2D drawings and updating as per drafting requirements.
SUMMARY
- 3d Modeling on Smart Plant.
- Coordinating with other discipline.
- Preparation of general arrangement & foundation layout drawings.
- Preparing Structural Steel General Arrangement & detail Drawings for on Smart Sketch, Micro station & AutoCAD.
- Preparation of Structural steel drawing on Smart sketch.
- Preparing Structural Steel standard Drawings on AutoCAD.
- Preparing Structural Steel General Arrangement Drawing for pipe rack, equipment platform, technological structure, Shelters, circular platforms with Smart Sketch, Microstation & AutoCAD.
- Preparation of Pipe supports detail drawings.
- Bill of material from 3D model (SP3D).
EDUCATION
- Secondary School Certificate
- Diploma in CIVIL
- Steel Structural in Oil & Gas from IPEBS
PERSONAL DETAILS
- Name :N.Rameshsagar
- Fathers Name :N. kondalaRao
- Sex :Male
- Marital Status :Married
- Languages Known :English, Telugu and Hindi
- Nationality :INDIA
Thanks & Best Regards RameshSagar.N