civil/ structural engineer
- Engineer / Naval Architect
-
ARMADA TPCE (M) SDN BHD (January 2018 – present)
Menara Tan & Tan, Kuala Lumpur
- PROVISION OF FACILITIES IMPROVEMENT TECHNICAL SERVICES FOR PM8E FOR ENQUEST
- Responsible in preparing & completing PM8E ME-350 Crane preservation work structural integrity report.
- Updating SACS model for Seligi A Compression and prepare Inplace Analysis.
- PROVISION OF FCILITIES IMPROVEMENT PROPOSAL (FIP) ENGINEERING AND PROJECT INTERFACE SUPPORTS SERVICES FOR PETRONAS CARIGALI SARAWAK OPERATION (SKO)
- Responsible in preparing & completing Deck extension Lifting Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.
- Responsible in preparing & completing Topside Inplace Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.
RNZ INTEGRATED (M) SDN BHD (Nov 2010 – December 2017)
Menara Great Eastern, Kuala Lumpur
- PROVISION OF REVISIT DETAILED DESIGN ENGINEERING SERVICES FOR KINABALU NON ASSOCIATED GAS (NAG) PHASE II
- Responsible in preparing & completing Transportation Analysis for Module 6.
- PROVISION OF DETAILED DESIGN ENGINEERING SERVICES FOR SK310 B15 DEVELOPMENT
- Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
- Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
- Responsible in preparing & completing B11RD Substructure Miscellaneous Analysis and design report.
- Responsible in preparing & completing B11RD Topside Miscellaneous Analysis and design report.
- PROVISION OF FEED AND EPCIC OF WELLHEAD PLATFORMS (WHP) FOR BOKOR PHASE 3 RE-DEVELOPMENT PROJECT, ENHANCED OIL RECOVERY
- Responsible in preparing & completing Topside Weight Control Report for BODP-E & BODP-F Platform.
- Responsible in preparing & completing Topside Weight Control Report for BODP-D Platform.
- Responsible in preparing & completing Substructure Weight Control Report for BODP-E & BODP-F Platform.
- Responsible in preparing & completing Substructure Weight Control Report for BODP-D Platform.
- PROVISION OF STRUCTURAL INTEGRITY ASSESSMENT AND LOAD MONITORING FOR PETRONAS CARIGALI SDN. BHD. - SARAWAK OPERATIONS (PACKAGE 1)
- Responsible in preparing & completing Model Report for BEP-A Platform.
- Responsible in preparing & completing Static Inplace Analysis and Soft Mooring Assessment Report for BEP-A Platform.
- STRUCTURAL ENGINEERING REVERIFICATION FOR GARAGOL DENIZ WEST OFFSHORE FACILITIES OIL DEVELOPMENT PROJECT
- Responsible in preparing & completing the Pile Drivability Analysis Report
- Provision of FEED Services for SKR-A, Pipelines and HTI for KasaWARI GAS DEVELOPMENT PROJECT
- Responsible in preparing & completing the SKR-Topside Geometri Computer Model Analysis Report.
- Responsible in preparing & completing the SKR-Topside Load Formulation Report.
- Responsible in preparing & completing the SKR-Topside Inplace analysis Report.
- Responsible in preparing & completing the SKR-Topside Loadout analysis Report.
- SACS Model Updating & Integrity Assessment for 10 Platforms
- Responsible in preparing & completing the EWDP-B Structural Model Analysis Report.
- Responsible in preparing & completing the EWDP-B Structural Inplace Analysis Report.
- Provision of Front End Engineering Design (FEED) for MAGTYMGULY gas Recycling Development Project.
- Extract Support reaction under service condition from all building and pipe rack structural analysis output and subsequently applied into foundation design calculation accordingly.
- To perform Pipe rack analysis using STAAD PRO
- To perform structural and foundation analysis using STAAD PRO
- Provision of Engineering, Procurement, Construction, Hook Up and construction (EPCC) of Garagol Deniz West Offshore Facilities for Garagol Deniz West oil Development Project
- Responsible in preparing & completing the GDDP-A Boat landing and Boat Impact Analysis Report.
- Responsible in preparing & completing the GDDP-A Miscellaneous Report.
- Responsible in preparing and handling Structural Procurements for GDDP-A.
- Responsible in handling and reviewing Vendor documents during VDI/VDR Stage.
- Preparing & Updating Steel Specification for GDDP-A.
- Preparing & Updating Grout Seals Specification For GDDP-A
- Preparing & Updating Diaphragm Closure Specification for GDDP-A.
- Preparing & Updating Painting & Coating Specification for GDDP-A.
- Preparing & Updating Shock Cell Specification for GDDP-A.
- Preparing & Updating Pile Gripper Specification for GDDP-A.
- Preparing Technical Bid Evaluation for GDDP-A Elastomeric Pads.
- Preparing Technical Bid Evaluation for GDDP-A LMU’s.
- Preparing Technical Bid Evaluation for GDDP-A Grout Seals.
- Preparing Technical Bid Evaluation for GDDP-A Shock Cell.
- Preparing Technical Bid Evaluation for GDDP-A Boatlanding & Floatover Fender.
- Provision For Tukau Timur Shallow Front End Engineering Design (FEED) And Tukau Timur Deep Conceptual Engineering For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
- Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for TTJT-A Platform.
- Provision For Detailed Engineering (Phase 1) And Frond End Engineering Design (FEED) (Phase 2) For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
- Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for BNCPP-B Platform.
- Responsible in preparing & completing the Substructure Miscellaneous Report for BNCPP-B Platform.
- Responsible in preparing & completing the Substructure Launch Analysis & Report for BNCPP-B Platform.
- Responsible in preparing & completing the Substructure Flotation Analysis & Report for BNCPP-B Platform.
- Responsible in preparing & completing the Catholic Protection Analysis & Report for BNCPP-B Platform.
- Provision Of Engineering Services For FEED And Follow-On Engineering Of Phase-3 Development (Wellhead Platforms, Subsea Pipeline And Brownfield Works) for Carigali-PTTEPI Operating Company Sdn Bhd (CPOC)
- Responsible in preparing & completing the Jacket weight Control Report for TAPI-A and Melati (MTA) Platform.
- Responsible in preparing & completing the Topside weight Control Report for TAPI-A and Melati (MTA) Platform.
- Pipeline Detailed Engineering Design for Samarang Pipeline Replacement Project For Petronas Carigali Sdn Bhd (PCSB)
- Responsible in preparing & completing the Structural Assessment Analysis Design Report for SMJT-G platform.
- Responsible in Preparing & Completing The SMJT-E Miscellaneous Design Report and Analysis.
- Provision Of Engineering, Procurement, Construction And Commissioning (EPCC) Of For Central Diyarbekir Development Project Topsides And Jacket For Petronas Carigali (Turkmenistan) Sdn Bhd (PCTSB) / ILK INŞAAT
- Responsible in preparing & completing the Jacket Loadout analysis & report.
- Responsible in preparing & completing the Drilling Deck Lifting analysis & report.
- Responsible to perform Loadout analysis for Main Platform and prepare report.
- Responsible in preparing & completing the Topsides Inplace Design report.
- Provision of Front End Engineering Design (FEED) Services for Yetagun North Development Project for PC Myanmar (Hong Kong) Limited (PCML)
- Responsible in preparing & completing the YET-D Substructure Boat Impact analysis & report.
- Responsible to perform On-Bottom analysis for YET-D platform and prepare the report.
- Provision Of Engineering Design For PMO Pipeline Replacement Project (PPRP) For Petronas Carigali Sdn Bhd (PCSB)
- Responsible to perform lifting analysis for Bekok-A platform and prepare the report.
- Responsible to perform lifting analysis for Tiong-A platform and prepare the report.
- Provision Of Conceptual And Basic Engineering Services For Diamond Development Project, Blocks 01 & 02 Offshore Vietnam For PC Vietnam Limited (PCVL)
- Responsible to prepare and complete the DMDP-A Boat Impact analysis and report.
- Provision Of Detailed Design Services For Bekok-B Infill Project For Petronas Carigali Sdn Bhd (PCSB)
- Responsible to prepare and complete the new conductor boat impact analysis and report.
- Provision Of Engineering Support Services For Cendor Phase 2 Development Project, Block PM-304 for Petrofac (Malaysia-PM304) Limited (Early Production System Detail Design)
- Assigned to go for a site visit at Cendor MOPU in Terengganu.
- Responsible to check the location and the installation path for the new gangway.
- Responsible to check the new deck extension for drop object protection over the ESD valve.
- Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
- Responsible in preparing the KNPG-B Installation Bumper & Welding Check Analysis for Module 1,2,3,4,5, MSF North, MSF Drilling and MSF South.
- Detailed Design Engineering Of Mobile Offshore Production Unit (MOPU) Facility West Desaru Development Project, Block PM304 for Petrofac E&C Sdn Bhd
- Acting as a Structural Refurbishment Engineer.
- Responsible to prepare & completed Scope of Work for Structural Refurbishment.
- Has been assigned to site to identify the structural and architectural item/member for the refurbishment work.
- Responsible in preparing the structural MTO.
- Provision Of Basic Design, Front End Engineering Design (FEED) and Detailed Design Services For South Pars Gas Development Project Phases 22, 23 & 24 For Petroleum Investigation Research & Engineering Co. (PIRE Co.) / PARS Oil And Gas Company (POGC)
- Perform On-Bottom and Mudmat Design Analysis for the offshore pipeline crossing.
- Perform a jacket Pre-service analysis & report on the on-bottom analysis and mudmat design for four (4) platforms which is SPD22, SPD23, SPD24A and SPD24B.
- Perform boat impact analysis & report for two (2) different platform including SPD22 and SPD23.
- Perform a load out analysis for SPD24B.
- Perform Pile Driveability analysis & report for Flare tower including FSP22, FSP23, FSP24A, and FSP24B.
- Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
- Performed Topside’s In-Place Analysis for Service Platform (Module 6) including the Access Platform, Strainer Service Platform, FE-245B and FIA 2460A.
- Prepare KNPG-B Topside Miscellaneous Design Report for Module 6 (SOGT Compressor Train A & B).
- Prepare the barge bumper analysis for Module 6.
GEOLAB (M) SDN BHD (June 2010 – Nov 2010)
Position : Engineer
WORK DESCRIPTION:
Performed non-destructive test (NDT) for pile and concrete structure at site including the PDA test, SIT test and Windsor probe test.
- Pilling Work Fork The Proposed Construction Of Service Apartment Including
- Piling Work For The Proposed And Completion Of Temporary Logistic Road At Jalan Bukit Kuching For Medini Development Iskandar Malaysia, Johor Darul, Takzim
- Piling Work For The Proposed And Completion Of Petrol Station On PTD57015 H.S (D) 227378 Taman Setera Utama, Johor Bahru, Johor Darul, Takzim.
- Piling Work For The Proposed And Completion Of Senai-Desaru Expressway (TNB Substation Package 3A), Johor, Darul Takzim
- Piling Work For The Proposed And Completion Legoland, For Medini Development Iskandar Malaysia, Johor Darul, Takzim.
- Proposed And Completion Of 23 Storey Apartment At Nusajaya, Johor Darul, Takzim
- Piling Work For Proposed Construction Of Coastal Highway From Johor Bahru To Nusaya, Mukim Pulai, Daerah Johor Bahru, Johor Darul, Takzim
- Piling Work For The Proposed And Completion Smart School For Medini Development Iskandar Malaysia, Johor Darul, Takzim
EDUCATIONs
July 2007 – April 2010 Universiti Teknologi Malaysia (UTM) Bachelor in Engineering
(Hons.) Civil (CGPA:3.33)July 2004 – Apr 2007 Universiti Teknologi Malaysia (UTM) Diploma in Civil Engineering (Hons.) (CGPA:2.85) SKILLS
Familiar with a range of proprietary software including SACS, GRL Weap, Microsoft Office, AutoCAD, Microsoft Visual Basics, Microsoft Project , STAAD Pro and familiar with relevant international codes and standards including PTS, AISC and API.
REFEREES
Name : Helmy Hariri
Position : Lead/Senior Engineer
Contact No: 019-2290440
Name : Tasyriff Izzat
Position : Lead/Senior Engineer
Contact No: 012-23685205
Availability : Available in 1 week
- PROVISION OF FACILITIES IMPROVEMENT TECHNICAL SERVICES FOR PM8E FOR ENQUEST
- Skills
-
- sacs 7 years by 2018
- GRL weap 7 years by 2017
- PTS 7 years by 2018
- Employers
-
-
CIVIL/STRUCTURAL ENGINEER at RNZ INTEGRATED
2010 October - Dec 2017 -
CIVIL/STRUCTURAL ENGINEER at ARMADA TPCE
Jan 2018
-
- Educations
-
-
CIVIL ENGINEERING
CIVIL ENGINEERING at UNIVERSITI TEKNOLOGI MALAYSIA2007 - 2010
-
CIVIL ENGINEERING
-
SRI KEMBANGAN, SELANGOR,