Objective
A Professional Civil Engineer with around 10 years of work experience in the construction industry, such as Power Plants / Industrial projects, Oil Refinery, Residential High Rise Towers and Buildings. Worked in the positions as Construction Manager, Project Engineer, Civil/ Structural Engineer and Estimator.
Experience
Aug 2006- present
Saudi Consulting Services Riyadh, Saudi Arabia
Civil / Structural Engineer
Presently working on the project, Construction & Reinforcement of Power Plant P.P-9 extension (Gas turbine GE frame 7EA, 60×32=1920 MW) blocks C, D & F for SEC (Saudi Electric Company), located at central Riyadh, Kingdom of Saudi Arabia.
•Responsible for supervision of all construction activities as per requirements of contract, design codes & specifications. The project includes 32 Gas turbine units, Allied structures, 132 k.v Sub-station building, 10 Electrical buildings, 06 Administration buildings, Security building and Main control building for three blocks, Electrical cable tunnel (2.25 km long) and Mechanical pipe trench (3.3 km long) etc.
Dec’ 04 - July’06
Associated Constructors Ltd. Karachi, Pakistan
Construction Manager
Construction of six high rise towers “Creek vistas city” (Basement + Ground + 16 floors) for D.H.A (Defense Housing Authority) under consultancy of international consultants “MEINHARD” Singapore, located at D.H.A Phase-VIII Karachi.
• Remained responsible for the civil activities of two towers. Managing / Planning and Execution of construction work, assigning the responsibilities to site engineers & supervisors, complete coordination with other services including dealing with client, consultant & sub-contractors).
Feb’03 - Nov’04 METAC General Contract. Co. Abu-Dhabi, U.A.E
Project Engineer
Construction of 208 Public Houses (03 storey) including 04 Mosque for 1000 worshipers for Abu-Dhabi Municipality, located at Shahama, 30 km away from the capital city.
•Remained responsible for construction work of 52 houses and a mosque, right from starting till handing over the project. Remained in charge of all the office and field operations. Preparation of daily/weekly & monthly progress reports, monthly payment certificate, attend weekly minutes of meeting with client. Co-ordination with others services including dealing with consultants, sub-contractors, and suppliers.
Sep’01 – Jan’03
Misurata General Contracting
Misurata, Libya
Project Engineer
Construction of synthetic detergent factory (Ground + 12 floors) for Ministry of Industries & Commerce Libya, under consultancy of “Turkish consultants”.
•Responsible for factory building works from foundation till completion of project. The work includes main machinery / equipment building, loading and un-loading platform, Treatment plant, Boiler room, cooling towers and allied structures, also includes activities related to infrastructures of above building i.e. rigid / flexible payments and storm water drainage system.
Apr’99 - Aug’01
Attock Refinery Ltd. Rawalpindi, Pakistan
Civil Engineer
Construction of 750 MW Power plant building, Oil storage tanks foundation, Reservoirs, Allied structures, rigid & flexible pavements for heavy boozers.
•Top supervision of the construction activities as a client civil works in charge for main plant building, Tanks foundation and storm water drainage system.
•Planning and managing of civil works with strict observation on working in accordance with schedule program.
Feb’92 - Sep’93
RPS Construction Co. Sukkur, Pakistan
Site Engineer
Construction of institutional building and basic health unit for ministry of works provincial government.
•Remained responsible for execution / supervision of all construction activities.
•Well handled with survey instruments like Total station, Digital theodolite and level machine.
Education
Aug. 93 - Feb.99
Q.U.E.S.T University Nawabshah, Pakistan
Bachelor of Engineering (B.E) in Civil Engineering.
Silver Medalist, Stood 2nd with percentage 93.28%.
Certification
Sept. 89 - May 92 Sind Board of Technical Education Karachi, Pakistan
Diploma of Associate Engineer in Civil Engineering,
Stood 3rd in entire board with percentage 85.38%.
Skils
Ms Word, Excel : Advance
Ms Project : Advance
Primavera P3, Auto Cad : Intermediate
Prof. Membership: Engineering Council, Pakistan.
: Valid U.A.E driving license.
: Valid K.S.A driving license.