Anchor Foreman , Anchor Control Tower Winch Operator
- Superintendent / Foreman
-
Almost 14 years of experience in Marine construction and dredger work, like a Platform hook ups, Pipe lay, Pipeline Offshore pull, Pipeline Onshore pull with liner Winch, Subsea cable laying, SPM installation, (Offshore pile Drilling with RCD machine, Grout Fill, Spool Tie-in, Cross Chain Tension, subsea hoses, floating hoses, and umbilical Installation) Jetty and Marin terminal construction, Sheet Piling, I, J tube, Riser installation, Trenching & Back fill Rock dumping work.
Skills____________________________________________________________________________________
Carrying out risk assessments and looking at how risks could be reduced Planning practical & and effective solutions towards safe working practices; Making changes to working practices that are safe and comply with legislation, Outlining safe operational procedures, which identify all relevant hazards and accurately assess risks.
WORK HISTORY
Senior Anchor Control Tower Operator 20/04/2016 to Till Dated now
Valentine Maritime LLC Gulf
Projects Details
Zirku Island SARB 3 field development project; Client Petrofac and Adma Opco installation of Jackets, Platform, Bridge, ZFP-1, ZFP- 2 Flare Tower, Boat Landing, Tie inSpool and Risers Pre commissioning of pipelines. Installation of SBM Plem. Utilizing 85 Ton Gravity Anchor for Mooring on board barge DLB 1600
Senior Anchor Control Tower Operator 05/10/2015 10 /02/2016
Valentine Maritime LLC Gulf
Projects Details
Mumbai High North field Re – Development of Phase 3 Pipeline Project.
We are laying pipe line 20". 16". 12". 10". 8" location at NQ, MNP, MNP, WIN Platform location Bassien BPB complex 20" pipe lay
on board barge Regina-250Senior Anchor Control Tower Operator 01/05/2015 to 15/07/2015
Valentine Maritime LLC Gulf
Projects Details
Zirku Island SARB 3 field development project; Client Petrofac and Adma Opco installation subsea pipe lines including various shore pull approximately 200 kilometers pipeline 48" 36" 26" 20" 18" 14" + piggyback cable and installation of Jackets, Decks, Bridge, Flare Tower, Boat Landing , Risers Pre commissioning of pipelines. Installation of SBM Utilizing 85 Ton Gravity Anchor for Mooring on board barge DLB MC300
Senior Anchor Control Tower Operator 07/03/2015 to 12/04/15
Vanoord
Projects Details
22” Twin Pipe lay 10 KM 2 km each. Shore Pull for GAMBA Export Sea line Replacement Installation on board DLB Stingray Location Gamba
Client Shell Gabon Oil
Senior Anchor Control Tower Operator 01/12/2014 to 25/02/2015
Valentine Maritime LLC Gulf
Projects Details
Zirku Island SARB 3 field development project; Client Petrofac and Adma Opco installation subsea pipe lines including various shore pull approximately 200 kilometers pipeline 48" 36" 26" 20" 18" 14" + piggyback cable and installation of Jackets, Decks, Bridge, Flare Tower, Boat Landing, Risers Pre commissioning of pipelines, Installation of new SBM for Adma Utilizing 85 Ton Gravity Anchor for Mooring on board barge DLB MC300.
Senior Anchor Control Tower Operator 9/06/2014 to 23/09/2014
Valentine Maritime LLC Gulf
Projects Details
24” Water Injection Pipe lay, J Tube, Riser, Tie in Spool Installation on board DLB MC300 Location Saheen Field Qatar Offshore
Client Maersk Oil
Anchor Control Tower Operator 05/01/2014 to 01/05/2014
McDermott International
Projects Details
Project Safaniya Phase 2
Platform’s Installation, Pipe lay, Subsea cable lay, Riser, Tie in Spool, Valve Skid, Sleeper and free span correction on board Vessel is McDermott DB 32,
Client Saudi Aramco
Anchor Foreman, Anchor Control Tower Operator 20/10/2013 to 27/12/2014
Swiber Offshore Singapore
Projects Details
SISI NUBI 2B PECCIKO 7B EPCI development Indonesia
Project is 16” Pipe line Installation for New platform’s (WPS2 to MWPS and WPN3 to MWPN) 12 Riser tie in Spool installation on board Vessel is Swiber 1 Mas 300
Client TOTAL & E& P Indonesia
Anchor Foreman, Anchor Control Tower Operator 15/09/2013 to 15/10/2013
Swiber Offshore Singapore
Projects Details
Naga and Palikan Project 2 Numbers Platform installation location Natuna Sea Indonesia Vessel is Swiber Kaizen 4000 Client Premier Oil
Anchor Foreman, Anchor Control Tower Operator 15/07/2013 to 05/09/2013
Swiber Offshore Singapore
Projects Details
PRP-2 Bulan-Bulan at Osprey Field Beach pull 1 km, 3 Pipe line 8" with different length total 9 km Concrete matters installation Risers and Spool Tie-Installation Vessel is SwiberConquest DLB Client Brunei Shell Petroleum
Anchor Foreman, Anchor Control Tower operator 15/06/2013 to 10/07/2013
Swiber Offshore Singapore
Projects Details
Field BELUT South 16” Pipe lay with Dummy Spools, Sleepers and Concrete maters at water depth 200 M Vessel Swiber Conquest DLB client Conoco Phillips Indonesia.
Barge Foreman 12/08/2012 to 25/05/2013
Essar Offshore Subsea
Projects Details
PRP-3 jobs are I tube, Subsea cable lay &Riser installation at (Heera & BHN North field) Mumbai High ONGC India.Vessel Nand Gaurav DLB
Anchor Control Tower Operator 15/10/2011 to 01/06/2012
Swiber Offshore Singapore
Projects Details
Pipe Lay of approx. 75.0km submarine pipeline in 14 segments for well fluid, gas lift, and water injection pipelines with 3" Piggy back at D-1 & Bessen Field client ONGC India Project MHNRD II Pipeline Vessel Swiber Concord PLB.
Anchor Control Tower Operator 14/05/2011 to 26/ 09/2011
Swiber Offshore Singapore
Projects Details
7 Cables Installation, J-tube, I-tube and Riser Installation of clamps, Sleeper and Concrete matters installation at crossings etc., Cable Replacement Project Brunei Champion Field
Vessel Swiber Aziz PLB
Anchor Foreman 15/01/2011 to 27/04/2011
Subsea7 France
Projects Details
Hook-up operation & pipe lay job UBIT field client Exxon Mobil (MP Nigeria)
Vessel Acergy ORIN DLB
Anchor Foreman, Anchor Control Tower Operator, 07/10/2007 to 27/12/2010
Leighton International Australia
Projects Details
1 -SPM installation & Pipe lay Gujarat for client Cairn Energy India
2 -SPM Installations & Pipe lay Vizak for client HPCL India
3 -Hook-up operation PRP 2 at Bombay High client ONGC India
4 -SPM installations & Pipe lay Gujarat for client Bharat Oman Refinery
5 -3 SPM installations & Pipe lay Jamnagar for client Reliance Industries India
Vessel Leighton stealth, Leighton MYNX PLB
Anchor Control Tower Operator 18/09/2002 to 04/03/2007
Valentine Maritime (GU) LLC UAE
Projects Details
1 -Platform Hook-up & Pipe laying in Jamnagar for Reliance Industries India
2 -Platform Installations & Pipe Laying for TPAO Turkish Petroleum Corporation
3 -SPM Installations & Pipe laying In Gujarat for EssarGroup India
4 -SPM Installations, Pipe laying & Hook-ups at Bombay High for ONGC India
Vessel Regina-250 DLB, DLB-600
Anchor Tower Operator 25/04/2000 to 27/12/2001Kier International UK
Projects Details
The trenching 800 meters for concrete pipe line, laid all pipeline of concrete. Done Sheet pilling for new Jetty construction. Rock dumping over the concrete pipe line. SPM Installations & Pipe line offshore pull. Concrete pipe lines laid to Power plant cooling system and made trench for concrete pipe line. Client Tamil Nadu for PPN Power Generating Company
Vessel Coromandal dredger barge