Objective
Maintain stable empolyment with a company that is established.
Experience
Lafarge Cement , Calera, Alabama 1994-2008
Alternative Solid Fuels Supervisor 2006 – 2008
? Coordinate the receiving and storage of all Waste Stream material purchased by Systech to be processed by Lafarge
? Maintain monthly inventory counts of all received and processed material, and work with Systech site manager, ASF Manager, Plant Optimization Manager to balance levels with book inventories
? Identify equipment issues that attribute to housekeeping, process and work with Maintenance, Electrical, and Production to develop plans to resolve the issues in a t timely manner
? Supervise hourly personnel ensuring that all environmental, safety, quality, budget, and production targets are met.
Production Supervisor / Central Control Room Operator 2004 – 2006
? Directly operated plant equipment and process lines while ensuring the safety of people and equipment, ensure product quality targets are met, environmental regulations are being met, and plant objectives are being met
? Effectively troubleshoot problems in the plant and in cooperation with other departments, ensure that these problems are rectified quickly to minimize downtime
? Work with all departments Maintenance, Electrical, Quarry, Packhouse, ASF, Process, Mobile, and Sales to ensure plant equipment is running safe and optimally
? Develop teamwork between departments and employees to optimize production
? Implement new procedures and equipment to employees
? Ensure a safe work environment to employees
? Supervise quality control of products to ensure customer satisfaction
? Inventory control of cement, masonry, and clinker production
? Worked with commissioning team for finish mill 3
Production Assistant I 2002 – 2004
? Ensure that all field equipment is operating properly; resolve and prevent field problems; perform diagnostic/proactive inspections and repairs as necessary to minimize downtime and optimize equipment operations
? Provide general labor services as needed in the plant
? Store stock and handle all material including but not limited to; fuel, rock, clinker, and cement
? Operate mobile equipment, cement loading, shipping, reclaim and transfer equipment
? Perform basic repairs to facilitate plant operations
? Accurately complete ASTM physical test procedures for cement, clinker, and raw mix operations
? Perform daily inspections, troubleshooting and quality testing, and provide documentation and reporting as required or as directed by the Process Control Supervisor (PCS)
? Serve as a member of the Continuous Improvement Group to resolve daily production difficulties
? Worked with commissioning team for new pre-heater and kiln 5
Packer Operator / Shipping & Receiving / Bulk Loader 1994 – 2002
? Operated automated Allen-Bradley cement loading system
? Operated Havre automated packing machine
? Troubleshooting of Mechanical and electrical problems
? Operated various types of heavy equipment and machinery
? Shipping and Receiving
? Worked with commissioning team for new packer and palletizer
Education
Education and Specialized Skills
? Received diploma from Calera High School in 1987
? Familiar with custom work order system from creation to execution of work order
? Familiar with Kronos Time Keeping systems
? Myriad safety courses- Lafarge
? Certified Master Plumber and Gas Fitter
? Supervisor for multiple departments with up to 8 direct reports
? Developed internally as part of Lafarge Supervisor Development Program
? First aid and CPR trained
? MSHA experienced miner re-certified Nov 2007
? Basic welding
? Basic electrical
? Technically trained in manufacturing plant equipment
? Responsible for use of alternative fuels for powering manufacturing environments
Certification
? MSHA experienced miner re-certified Nov 2007
? First aid and CPR trained
? Myriad safety courses- Lafarge
? Certified Master Plumber and Gas Fitter
Skils
? Supervisor for multiple departments with up to 8 direct reports
? Developed internally as part of Lafarge Supervisor Development Program
? Familiar with custom work order system from creation to execution of work order
? Familiar with Kronos Time Keeping systems