Objective
I have equipped myself conceptually and practically towards achieving my objective, which makes me fit for your organization. My dedication, conceptual and practical knowledge will help me to serve your organization in a better way.
Experience
Jetty Construction
Block placing,Geotextile placing, Prism point survey ,Filter leveling ,Armour rock leveling.(RUWAIS)
Cleaning of spud tank for CVI & MPI,Uweld inspection of spudtank.(MUMBAI HIGH)
Jetty Construction
Install the blocks, clearing the kylie from pile, inspection of piles
HAZIRA(GUJRAT)
Spud tank nozzle’s cleaning, CVI,GVI of spud tank’s weld(Mumbai High)
Spud tank Nozzle blocked and removed and made Video. (Mumbai High)
MGR, METREOLOGY, CLAMPING, HYDROTIGHTING of CLAMP (FGC-1), BROCO CUTTING, RIGGING & DE-RIGGING, & TAUTWIRE CLEARING.
(Mumbai High)
Education
SNO. NAME OF COURSE CERTIFICATE NO. CERTIFICATE DATE PLACE OF TRAINING
1. COMMERCIAL DIVER CLASS-2 WCCDSO9O831-09 25 SEP.2009 WEST COAST COMMERCIAL DIVING SCHOOL(SOUTH AFRICA)
2. PRACTICAL DIVING FIRST AID PDFA090811-02 14 AUG.2009 WEST COAST COMMERCIAL DIVING SCHOOL(SOUTH AFRICA)
3. PSSR PSSR/13699 7 OCT.2010 YAK MANAGEMENT & MARINE EDUCATION CENTRE CBD BELAPUR,NAVI MUMBAI
4. PST PST/13036 14 OCT.2010 YAK MANAGEMENT & MARINE EDUCATION CENTRE CBD BELAPUR,NAVI MUMBAI
5. ELEMENTARY FIRST AID EFA/14091 10 OCT.2010 YAK MANAGEMENT & MARINE EDUCATION CENTRE CBD BELAPUR,NAVI MUMBAI
6. FIRE PREVENTION & FIRE FIGHTING FPFA/4496 17 OCT.2010 YAK MANAGEMENT & MARINE EDUCATION CENTRE CBD BELAPUR,NAVI MUMBAI
7. HELICOPTER UNDERWATER ESCAPE TECHNIQUES HUET/4742 31 DEC.2009 YAK MANAGEMENT & MARINE EDUCATION CENTRE CBD BELAPUR,NAVI MUMBAI
Certification
COMMERCIAL DIVER CLASS-2
PRACTICAL DIVING FIRST AID
PSSR
PST
ELEMENTARY FIRST AID
FIRE PREVENTION & FIRE FIGHTING
HELICOPTER UNDERWATER ESCAPE TECHNIQUES
Skils
Block placing,Geotextile placing, Prism point survey ,Filter leveling ,Armour rock leveling.(RUWAIS)
Cleaning of spud tank for CVI & MPI,Uweld inspection of spudtank
Install the blocks, clearing the kylie from pile, inspection of piles
HAZIRA
Spud tank nozzle’s cleaning, CVI,GVI of spud tank’s weld
Spud tank Nozzle blocked and removed and made Video
MGR, METREOLOGY, CLAMPING, HYDROTIGHTING of CLAMP (FGC-1), BROCO CUTTING, RIGGING & DE-RIGGING, & TAUTWIRE CLEARING.